scholarly journals Breaking the buildup-time limit of sensitivity in avalanche photodiodes by dynamic biasing

2015 ◽  
Vol 23 (18) ◽  
pp. 24035 ◽  
Author(s):  
Majeed M. Hayat ◽  
Payman Zarkesh-Ha ◽  
Georges El-Howayek ◽  
Robert Efroymson ◽  
Joe C. Campbell
1975 ◽  
Vol 26 (11) ◽  
pp. 642-644 ◽  
Author(s):  
T. Kaneda ◽  
H. Takanashi

1986 ◽  
Vol 22 (6) ◽  
pp. 753-755 ◽  
Author(s):  
Y. Jhee ◽  
J. Campbell ◽  
J. Ferguson ◽  
A. Dentai ◽  
W. Holden

1991 ◽  
Vol 138 (3) ◽  
pp. 226 ◽  
Author(s):  
C.Y. Chang ◽  
J.W. Hong ◽  
Y.K. Fang

2018 ◽  
Vol 2 (1) ◽  
pp. 129
Author(s):  
Novita Dwi Lestari
Keyword(s):  

mafqud is a person who has no news, unknown where it exists, whether alive or dead. Mafqud is one of the reasons for the divorce, which by court verdict contained in article 116 letter b Compilation of Islamic Law (KHI). in addressing mafqud matters KHI provides a limit waiting for 2 years, where as in the school of Shafi'i in qaul jadidnya give time for 90 years, and in his other opinion (qaul qadim) give a time limit for 4 years, then undergo iddah dead for 4 months and 10 days.


2015 ◽  
Vol E98.C (4) ◽  
pp. 377-379
Author(s):  
Jonggyun LIM ◽  
Wonshil KANG ◽  
Kang-Yoon LEE ◽  
Hyunchul KU

2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2019 ◽  
Vol 118 (1) ◽  
pp. 42-47
Author(s):  
KwangSeok Han

Background/Objectives: This study investigated differences in the attitude of users according to type of scarcity message and price discount conditions to compose T-commerce sales messages and search for effective strategic plans. Methods/Statistical analysis: This study empirically verifies the difference in promotion attitude and purchase intention between the type of T-Commerce scarcity message (quantity limit message / time limit message) and the price discount policy (price discount / non-discount) message. For this purpose, 2 (scarcity type: limited quantity, limited time) X 2 (with or without price discount: price discount, no price discount) factor design between subjects was used.


Sign in / Sign up

Export Citation Format

Share Document