A Study on the Instruction of the Physical Fitness Management System for Special Security Guards at Nuclear Power Plants

2020 ◽  
Vol 64 ◽  
pp. 83-115
Author(s):  
Howon Jeong ◽  
◽  
Jiwoong Choi
Author(s):  
Se-Youl Won ◽  
Kyeong-Soo Lee ◽  
Jae-Gon Lee

According to Post Fukushima action items in Korea, KHNP has established the integrated aging management system to reinforce aging management of system, structures, and components (SSCs) effectively for seven operating units, which are in service for more than twenty years, and for Kori Unit 1 and Wolsung Unit 1, which are subject to continued operation (CO) based on NUREG-1801 GALL report. KHNP’s integrated aging management programs (AMPs) focus on the establishment of aging management system for long-lived operation of nuclear power plants in Korea. The integrated aging management system consists of the integrated AMP standard guideline, operating guideline for each plant, individual AMPs of each plant, and AMP Data Base (DB) system including implementation results, basic DB information related to facilities operating in NPPs, and operating information such as operating experience and evaluation report. The integrated aging management system is importantly utilized for Periodic Safety Review (PSR) and the renewal of CO. Therefore, it will be largely contributed to keep NPPs the level of safety for long time operation through the effective aging management.


Author(s):  
Jun Zhou

Severe weather such as typhoon has long been a great challenge threats the safe operation of nuclear power plants. To cope with typhoon, Qinshan III NPP has developed an effective management system, including building powerful organizations, creating standard response procedures and consumable storage, which proven to be effective to ensure the safe operation of Qinshan III plant under severe weather conditions.


Author(s):  
Yu Yang ◽  
Wang Can

Nuclear power plants commissioning is an entire inspection and verification process of systems and equipments carried out by commissioning party, to prove that the overall performance of system, equipment and unit can meet the design requirements, operation criteria and nuclear safety criteria, and the plant is qualified for long-term stable and safe operation. As commissioning work has the characteristic of long lasting time, broad scope, high technology and lots of interfaces, and so on, it must be carried out under a set of scientific management system, to accord with requirements of “six controls” of commissioning work. The text aims at researching and investigating into commissioning management system that is in accordance with CPR1000 nuclear power plant commissioning through analysis of constitutes and practice situation of Ling AO phase II project commissioning management system, so as to instruct and standardize the commissioning management of nuclear power plants.


Author(s):  
A. Bazhukov ◽  
L. M. Butter ◽  
I. Malahov ◽  
N. Stoykova ◽  
A. G. L. Zeijseink

2013 ◽  
Vol 56 ◽  
pp. 03001 ◽  
Author(s):  
F. Al-Neshawy ◽  
J. Piironen ◽  
E. Sistonen ◽  
E. Vesikari ◽  
M. Tuomisto ◽  
...  

Information ◽  
2020 ◽  
Vol 11 (6) ◽  
pp. 282 ◽  
Author(s):  
Choong-koo Chang

In nuclear power plants, plant management systems are not only very important for operation and maintenance of the facilities, but also play a very important role in analyzing and reporting the events to the authorities when a failure or accident occurs in the facility. In addition, it is also important to ensure that event records are managed transparently so as not to cause any attempt to cover up events. Therefore, this paper proposes a tamper free plant operation system by applying blockchain technology to the integrated plant management system of Korea hydro and nuclear power (KHNP). As a result, this paper will contribute to improving public acceptance by eliminating distrust in safe operation of nuclear power plants.


Sign in / Sign up

Export Citation Format

Share Document