scholarly journals High-reliability gas turbine combined-cycle development program: Phase I

1980 ◽  
Author(s):  
F. Boenig ◽  
J. Lewis
1980 ◽  
Author(s):  
R. E. Strong ◽  
D. J. Amos ◽  
K. H. Eagle ◽  
G. L. Francois

Author(s):  
Satoshi Hada ◽  
Masanori Yuri ◽  
Junichiro Masada ◽  
Eisaku Ito ◽  
Keizo Tsukagoshi

MHI recently developed a 1600°C class J-type gas turbine, utilizing some of the technologies developed in the National Project to promote the development of component technology for the next generation 1700°C class gas turbine. This new frame is expected to achieve higher combined cycle efficiency and will contribute to reduce CO2 emissions. The target combined cycle efficiency of the J type gas turbine will be above 61.5% (gross, ISO standard condition, LHV) and the 1on1 combined cycle output will reach 460MW for 60Hz engine and 670MW for 50Hz engine. This new engine incorporates: 1) A high pressure ratio compressor based on the advanced M501H compressor, which was verified during the M501H development in 1999 and 2001. 2) Steam cooled combustor, which has accumulated extensive experience in the MHI G engine (> 1,356,000 actual operating hours). 3) State-of-art turbine designs developed through the 1700°C gas turbine component technology development program in Japanese National Project for high temperature components. This paper discusses the technical features and the updated status of the J-type gas turbine, especially the operating condition of the J-type gas turbine in the MHI demonstration plant, T-Point. The trial operation of the first M501J gas turbine was started at T-point in February 2011 on schedule, and major milestones of the trial operation have been met. After the trial operation, the first commercial operation has taken place as scheduled under a predominantly Daily-Start-and-Stop (DSS) mode. Afterward, MHI performed the major inspection in October 2011 in order to check the mechanical condition, and confirmed that the hot parts and other parts were in sound condition.


Author(s):  
Kazuhiko Tanimura ◽  
Naoki Murakami ◽  
Akinori Matsuoka ◽  
Katsuhiko Ishida ◽  
Hiroshi Kato ◽  
...  

The M7A-03 gas turbine, an 8 MW class, single shaft gas turbine, is the latest model of the Kawasaki M7A series. Because of the high thermal efficiency and the high exhaust gas temperature, it is particularly suitable for distributed power generation, cogeneration and combined-cycle applications. About the development of M7A-03 gas turbine, Kawasaki has taken the experience of the existing M7A-01 and M7A-02 series into consideration, as a baseline. Furthermore, the latest technology of aerodynamics and cooling design, already applied to the 18 MW class Kawasaki L20A, released in 2000, has been applied to the M7A-03. Kawasaki has adopted the design concept for achieving reliability within the shortest possible development period by selecting the same fundamental engine specifications of the existing M7A-02 – mass air flow rate, pressure ratio, TIT, etc. However, the M7A-03 has been attaining a thermal efficiency of greater than 2.5 points higher and an output increment of over 660 kW than the M7A-02, by the improvement in aerodynamic performance of the compressor, turbine and exhaust diffuser, improved turbine cooling, and newer seal technology. In addition, the NOx emission of the combustor is low and the M7A-03 has a long service life. These functions make long-term continuous operation possible under various environmental restraints. Lower life cycle costs are achieved by the engine high performance, and the high-reliability resulting from simple structure. The prototype M7A-03 gas-turbine development test started in the spring of 2006 and it has been confirmed that performance, mechanical characteristics, and emissions have achieved the initial design goals.


Author(s):  
S. Aoki ◽  
Y. Tsukuda ◽  
E. Akita ◽  
Y. Iwasaki ◽  
R. Tomat ◽  
...  

The 701G1 50Hz Combustion Turbine continues a long line of large heavy-duty single-shaft combustion turbines by combining the proven efficient and reliable concepts of the 501F and 701F. The output of the 701G1 is 255MW with combined cycle net efficiency of over 57%. A pan of component development was conducted under the joint development program with Tohoku Electric Power Co., Inc. and a part of the design work was carried out under the cooperation with Westinghouse Electric Corporation in the U.S.A. and Fiat Avio in Italy. This gas turbine is going to be installed to “Higashi Niigata Power Plants NO.4” of Tohoku Electric Power Co., Inc. in Japan. This plant will begin commercial operation in 1999. This paper describes some design results and new technologies in designing and developing this next generation 1500°C class advanced gas turbine.


Author(s):  
David W. Donle ◽  
Robert C. Kiefer ◽  
Thomas C. Wright ◽  
Ugo A. Bertolami ◽  
Denis G. Hill

This paper describes the development, application, and performance verification of a new patented technology for cleaning and cooling combustion air to a gas turbine. A two (2) year in-depth research program at Dow Chemical Company in Freeport, Texas resulted in the development of this technology. At the conclusion of the research and development program, full-scale application of the hardware was made on a 100 MW combined cycle gas turbine, and its performance monitored for two (2) years. Application of the new technology resulted in increased power output, higher reliability, NOx emission reduction, reduced maintenance costs, and higher total system efficiency. Since the new technology has produced very large cost savings, Dow is using the new technology on three new combined cycle machines currently being installed, and further is exploring conversion of existing combined cycle gas turbines to this new technology.


Sign in / Sign up

Export Citation Format

Share Document