Stochastic Model Fast-Tracking used in
Proposed Construction
Fast-tracking a project involves carrying out sequential activities in parallel, partially overriding their actual construction process, to be using that method the overall project duration. In this paper, the regular work schedule of residential post construction work details comparing with fast-tracking method is proposed. These find out the project duration high. to be suggest the method of stochastic to be reduce the duration to minimum 20% of original duration of that project. The relationship between cost and duration to overlap. That project duration and cost would estimated manual calculation. Then compared to actual and estimated value. Stochastic value taken to least value of comparison of fast-tracking stochastic model through a case study.