scholarly journals Improved Electrogeometric Model Suitable for EHV and UHV Transmission Lines Developed through Breakdown Testing for Long Air Gaps

Energies ◽  
2017 ◽  
Vol 10 (3) ◽  
pp. 333 ◽  
Author(s):  
Yeqiang Deng ◽  
Yu Wang ◽  
Zhijun Li ◽  
Min Dai ◽  
Xishan Wen ◽  
...  
2018 ◽  
Vol 8 (12) ◽  
pp. 2594 ◽  
Author(s):  
Jiachen Gao ◽  
Linong Wang ◽  
Qiushi Zhang ◽  
Bin Song

Positive switching impulse discharge characteristics are an important basis for the external insulation design of transmission line towers. At present, the characteristics are obtained mainly by real tower discharge tests. Since the existing research on the discharge model is not perfect, test designs are not reasonable, which results in high costs. The influence of line height and tower width on the discharge characteristics of Ultra High Voltage (UHV) transmission lines air gaps is studied in this paper. The results show that the line height had little influence on the breakdown voltage of air gaps in UHV transmission lines. A tower-width discharge model was obtained by fitting the breakdown voltage of air gaps with different gap lengths and tower widths. By analyzing the gap characteristic factors of different transmission lines, a discharge model of different tower air gaps in UHV transmission lines was presented. The breakdown voltage calculated by the models was in good agreement with the test results, and the errors were not more than 5%.


Author(s):  
Fan Yang ◽  
Wei He ◽  
Tao Chen ◽  
Xiaochu Luo ◽  
Yongchang Fu

The paper describes an electric field measurement method based electroscope system to check the electrification state of ultra-high voltage transmission lines, which is composed of three parts: 1) Measuring terminal; 2) Central sever; 3) GPRS and Internet network. The measuring terminal was used to measure the electric field and the location of the measuring points, then the measured data was sent to the central sever by GPRS and Internet network, and requested for an electricity state confirmation.When the sever received a request from a terminal, the electric fields and locations of the measuring points were obtained first, then according to the location of the measuring points, the server searches the corresponding objective transmission lines in the database and read their parameters. According to the parameters of the measuring points and transmission lines, a calculation would be carried out to confirm the electrification state of the transmission lines. For the confirmation calculation, equations for the electric field inverse problem of the transmission lines were set up first, then global regularization and damped Gauss Newton (DGN) method were used to solve the inverse problem.A 500kV double loops transmission line was taken as an example to verify the validity of this method. The electric field and location of 11 measuring points were measured by the measuring terminal firstly, and then sent to the central sever. Electrification state was confirmed by the central sever.