Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)
Keyword(s):
2004 ◽
Vol 41
◽
pp. 248-254
◽
Keyword(s):
1980 ◽
Keyword(s):
Keyword(s):
1993 ◽
Vol 16
(6)
◽
pp. 807-816
◽