Regular sewer cleaning in North Rhine-Westphalia (Germany) generates annual costs of around 50 million Euros. This leads to the question of whether and to what extent sewer cleaning is necessary. To determine the effect of roughness, sewer surface condition and discharge, experiments with real wastewater were performed, using a sewer test track with acrylic glass tubes (DN 300) prepared with abrasive paper and nature stone tiles at the wastewater treatment plant (WWTP) Bochum-Ölbachtal (Ruhrverband, Germany). A logarithmic relationship between deposit height and time was found to lead to maximum deposit heights of 5 to 60 mm. Surface structure analysis by texture measuring indicated that deposits within the first 28 days after cleaning are highly influenced by the surface condition of the sewer and not necessarily by roughness. Furthermore, under dry weather conditions deposit heights are nearly stable after this time, indicating the limiting effect of sewer cleaning. Deposit formation amounted to 1.75–1.80 mm/d at a roughness of ks = 0.10 mm (fine but catchy microstructure) and 0–0.1 mm/d at ks 1.25 mm (wavy microstructure) at steady state and transient discharge within the first 28 days after sewer cleaning.

2017 ◽  
Vol 75 (9) ◽  
pp. 2025-2033
Author(s):  
M. Gunkel ◽  
E. Pawlowsky-Reusing

As part of the project KURAS, the Berliner Wasserbetriebe realized a field campaign in 2015 in order to increase the process knowledge regarding the behaviour of transported sediment in the pressure main leading from the pumpstation to the wastewater treatment plant. The field campaign was conducted because of a lack of knowledge about the general condition of the pressure main due to its bad accessibility and the suspicion of deposits caused by hydraulic underload. The practical evidence of the sediment transport performance of this part of the sewer system, dependent on different load cases, should present a basis for further analysis, for example regarding flushing measures. A positive side-effect of the investigation was the description of the amount of pollutants caused by different weather conditions in combined sewer systems and the alterations of the sewage composition due to biogenic processes during transport. The concept included the parallel sampling of the inflow at the pumpstation and the outflow at the end of the pressure main during different weather conditions. By calculating the inflow to the pressure main, as well as its outflow at different flow conditions, it was possible to draw conclusions in regard to the transport behaviour of sediment and the bioprocesses within an 8.5 km section of the pressure main. The results show clearly that the effects of sedimentation and remobilization depend on the flow conditions. The balance of the total suspended solids (TSS) load during daily variations in dry weather shows that the remobilization effect during the run-off peak is not able to compensate for the period of sedimentation happening during the low flow at night. Based on the data for dry weather, an average of 238 kg of TSS deposits in the pressure main remains per day. The remobilization of sediment occurs only due to the abruptly increased delivery rates caused by precipitation events. These high pollution loads lead to a sudden strain at the wastewater treatment plant. It was found that the sediment transport behaviour is characterized by sedimentation up to a flow velocity of 0.35 m/s, while remobilization effects occur above 0.5 m/s. The assumption of bad sediment transport performance in the pressure main was confirmed. Therefore, the results can be used as a basis for further analysis, for example regarding periodical flushing as a means of cleaning the pressure main. The findings, especially regarding the methods and processes, are transferable and can be applied to other pressure mains in combined sewer systems. Besides the outlined evaluation of the sediment transport behaviour of the pressure main, the collected data were used in the project to calibrate a sewer system model, including a water quality model for the catchment area, and as a contribution towards an early physically based sediment transport modelling in InfoWorks CS.


Water ◽  
2019 ◽  
Vol 11 (8) ◽  
pp. 1529
Author(s):  
Oleksandr Panasiuk ◽  
Annelie Hedström ◽  
Jeroen Langeveld ◽  
Cornelis de Haan ◽  
Erik Liefting ◽  
...  

Infiltration and inflow (I/I) into sewers cause negative effects on the sewer system, wastewater treatment plant and environment. Identifying the causes and locating the inflows is necessary in order to address the I/I problem. This paper focuses on using distributed temperature sensing (DTS) for identifying, locating and characterising I/I into a sewer system during the end of winter–beginning of summer transition period under dry and wet weather conditions. During snowmelt, several locations with I/I were identified, while these locations did not show I/I during storm events after the snowmelt. In addition, during a very heavy storm after the snowmelt period, I/I was found at other locations. Therefore, DTS was demonstrated to be effective in identifying the type of I/I and in locating I/I. Finally, I/I monitoring campaigns in cold climates should take into account the variety of pathways of I/I during snowmelt and during rainfall.


2009 ◽  
Vol 60 (8) ◽  
pp. 1953-1964 ◽  
Author(s):  
S. G. E. Rönner-Holm ◽  
I. Kaufmann Alves ◽  
H. Steinmetz ◽  
N. C. Holm

Integrated dynamic simulation analysis of a full-scale municipal sequential batch reactor (SBR) wastewater treatment plant (WWTP) was performed using the KOSMO pollution load simulation model for the combined sewer system (CSS) and the ASM3 + EAWAG-BioP model for the WWTP. Various optimising strategies for dry and storm weather conditions were developed to raise the purification and hydraulic performance and to reduce operation costs based on simulation studies with the calibrated WWTP model. The implementation of some strategies on the plant led to lower effluent values and an average annual saving of 49,000 € including sewage tax, which is 22% of the total running costs. Dynamic simulation analysis of CSS for an increased WWTP influent over a period of one year showed high potentials for reducing combined sewer overflow (CSO) volume by 18–27% and CSO loads for COD by 22%, NH4-N and Ptotal by 33%. In addition, the SBR WWTP could easily handle much higher influents without exceeding the monitoring values. During the integrated simulation of representative storm events, the total emission load for COD dropped to 90%, the sewer system emitted 47% less, whereas the pollution load in the WWTP effluent increased to only 14% with 2% higher running costs.


2000 ◽  
Vol 41 (1) ◽  
pp. 163-166 ◽  
Author(s):  
W. Gebert ◽  
P.A. Wilderer

The investigated effects of heating the filling material in trickling filters were carried out at the Ingolstadt wastewater treatment plant, Germany. Two pilot scale trickling filters were set up. Heat exchanger pipings were embedded in the filter media of one of these trickling filters, and the temperature in the trickling filter was raised. The other trickling filter was operated under normal temperature conditions, and was used as a control. The results clearly demonstrate that the performance of trickling filters cannot be constantly improved by heating the biofilm support media. A sustained increase of the metabolic rates did not occur. The decrease of the solubility of oxgen in water and mass transfer limitations caused by an increase of the biofilm thickness are the main reasons for that. Thus, the heating of trickling filters (e.g. by waste heat utilization) in order to increase the capacity of trickling filters under cold weather conditions cannot be recommended.


1998 ◽  
Vol 37 (1) ◽  
pp. 155-162
Author(s):  
Flemming Schlütter ◽  
Kjeld Schaarup-Jensen

Increased knowledge of the processes which govern the transport of solids in sewers is necessary in order to develop more reliable and applicable sediment transport models for sewer systems. Proper validation of these are essential. For that purpose thorough field measurements are imperative. This paper renders initial results obtained in an ongoing case study of a Danish combined sewer system in Frejlev, a small town southwest of Aalborg, Denmark. Field data are presented concerning estimation of the sediment transport during dry weather. Finally, considerations on how to approach numerical modelling is made based on numerical simulations using MOUSE TRAP (DHI 1993).


1998 ◽  
Vol 37 (1) ◽  
pp. 347-354 ◽  
Author(s):  
Ole Mark ◽  
Claes Hernebring ◽  
Peter Magnusson

The present paper describes the Helsingborg Pilot Project, a part of the Technology Validation Project: “Integrated Wastewater” (TVP) under the EU Innovation Programme. The objective of the Helsingborg Pilot Project is to demonstrate implementation of integrated tools for the simulation of the sewer system and the wastewater treatment plant (WWTP), both in the analyses and the operational phases. The paper deals with the programme for investigating the impact of real time control (RTC) on the performance of the sewer system and wastewater treatment plant. As the project still is in a very early phase, this paper focuses on the modelling of the transport of pollutants and the evaluation of the effect on the sediment deposition pattern from the implementation of real time control in the sewer system.


2011 ◽  
Vol 64 (5) ◽  
pp. 1081-1088 ◽  
Author(s):  
Manfred Kleidorfer ◽  
Wolfgang Rauch

The Austrian standard for designing combined sewer overflow (CSO) detention basins introduces the efficiency of the combined sewer overflows as an indicator for CSO pollution. Additionally criteria for the ambient water quality are defined, which comprehend six kinds of impacts. In this paper, the Austrian legal requirements are described and discussed by means of hydrological modelling. This is exemplified with the case study Innsbruck (Austria) including a description for model building and model calibration. Furthermore an example is shown in order to demonstrate how – in this case – the overall system performance could be improved by implementing a cost-effective rearrangement of the storage tanks already available at the inflow of the wastewater treatment plant. However, this guideline also allows more innovative methods for reducing CSO emissions as measures for better usage of storage volume or de-centralised treatment of stormwater runoff because it is based on a sewer system simulation.


1997 ◽  
Vol 36 (5) ◽  
pp. 373-380 ◽  
Author(s):  
C. Fronteau ◽  
W. Bauwens ◽  
P.A. Vanrolleghem

All the parts of an urban drainage system, i.e. the sewer system, the wastewater treatment plant (WWTP) and the river, should be integrated into one single model to assess the performance of the overall system and for the development of design and control strategies assisting in its sustainable and cost effective management. Existing models for the individual components of the system have to be merged in order to develop the integrated tool. One of the problems arising from this methodology is the incompatibility of state variables, processes and parameters used in the different modelling approaches. Optimisation of an urban drainage system, and of the wastewater treatment process in particular, requires a good knowledge of the wastewater composition. As important transformations take place between the emission from the household and the arrival at the treatment facility, sewer models should include these transformations in the sewer system. At present, however, research is still needed in order to increase our knowledge of these in-sewer processes. A comparison of the state variables, processes and parameters has been carried out in both sewer models (SMs) and activated sludge models (ASMs). An ASM approach is used for the description of reactions in sewer models. However, a difference is found in the expression for organic material (expressed in terms of BOD) and heterotrophic biomass is absent as a state variable, resulting in differences in processes and parameters. Reconciliation of both the models seems worthwhile and a preliminary solution is suggested in this paper.


2001 ◽  
Vol 44 (10) ◽  
pp. 197-202 ◽  
Author(s):  
B.S. Luxmy ◽  
T. Kubo ◽  
K. Yamamoto

In order to check the sludge reduction capacity of metazoa in a membrane bioreactor (MBR), pilot-scale studies were conducted. Three MBRs had been set in a wastewater treatment plant at Tokyo, Japan and they were receiving real wastewater. Initially pH inside the three MBRs was controlled as pH 7, 6 and 5 respectively. Then metazoa population was monitored along with MLSS change. It was found that the presence or absence of the metazoa population did not have any significant effect on the increasing pattern of MLSS. In the MBR with pH 6 highest accumulation of sludge was observed though a high and steady level of metazoa (1,000-2,000 per ml) was present there. But in this MBR a lot of metazoa attached in the membrane was also observed and here the increase in transmembrane pressure was less than in the other two. So, metazoa population especially the attached one in the membrane plays an effective role in fouling control of the membrane. Presence of attached media may provide a suitable niche for metazoa in the process. So, attached media known as DB lace was also inserted in MBRs for testing its capacity along with inoculum of oligochaete worms. Accumulation of sludge was not satisfactory in the attached string and it seems that inoculated worm could not adjust to the environment as they were not sludge originated. So, in the next experimental stage, attached media was inserted in the form of a bundle and this time no inoculation of worm was used. A steady metazoa population was observed in the system but the accumulation of sludge in the attached media was the same as before.


2008 ◽  
Vol 58 (2) ◽  
pp. 435-438 ◽  
Author(s):  
M. Kornaros ◽  
C. Marazioti ◽  
G. Lyberatos

SBRs are usually preferred as small and decentralized wastewater treatment systems. We have demonstrated previously that using a frequent enough switching between aerobic and anoxic conditions and a specific to the treated wastewater aerobic to anoxic phase ratio, it is possible to by-pass the second step of nitrification (i.e. conversion of nitrite to nitrate nitrogen). This innovative process for nitrate by-pass has been branded as UP-PND (University of Patras-Partial Nitrification Denitrification) (WO 2006/129132). The proved methodology was successfully transferred from a lab-scale SBR reactor treating synthetic wastewater to a pilot-scale SBR system treating real wastewater. In this work we present the results from the operation of this pilot-scale SBR, constructed in the Wastewater Treatment Plant of Patras (Greece), using 6-hour, 8-hour and 12-hour cycles. It is demonstrated that three pairs of aerobic/anoxic phases with a relative duration of 1:2 (8-hour cycle) and 2:3 (12-hour cycle) secures the desired by-pass of nitrate production.