Optimization of Liquid Accumulation and Gas Injection Duration in Intermitter for Maximizing Production: Case Study

2021 ◽  
Author(s):  
Abhishek Ranjan ◽  
Rajan Kumar ◽  
Chandra Shekhar Singh ◽  
Tshering Lama

Abstract Gas lift is the process of injecting gas into the tubing at a predetermined depth in order to lift the crude oil to the surface. Gas lift is applied to a well when the reservoir pressure falls to such a level that it does not produce without application of external energy. There are mainly two types of gas lift which are Continuous and Intermittent gas lift. This paper deals with the theoretical determination of relationship between liquid accumulation and gas injection duration in an intermittent gas lift well and how this knowledge can be combined with the experience of Engineers to maximize the production of a well. In order to find the relationship between the given durations, a simple mathematical approach with the assumption that the gas injection time is independent of liquid accumulation time is followed. We, then apply various tools of mathematics such as the principles of maxima and minima, Leibnitz theorem, definition of the slope of a line etc. to finally prove the interdependence of liquid accumulation and gas injection time at which the well can produce at its maximum capacity. This interdependence is plotted on a separate graph with the given times on two axis. This curve represents the values at which the reservoir inflow is maximised and hence another curve representing the tubing outflow is drawn on the same graph to intersect the former curve at the optimum value of liquid accumulation and gas injection time. The paper also discusses the physical significance of the cases in which the two curves do not intersect and its possible solutions which vary in accordance with the experience of engineers and conditions of well. Our mathematical calculation led to an astonishing result that the interdependence between the two given durations is elegant and can be easily found without the use of computer in a very short interval of time. The result indicated that if a tangent is drawn from a point representing gas injection time to the graph of accumulation height versus time, it touches the graph at the value of liquid accumulation time at which the production of well is maximized. This novel approach to determine the value of time in an intermitter or time cycle controller in an intermittent well can be proved to be a boon for gas lift optimizers who would otherwise spend a large part of the time in setting the value on hit and trial basis. The graphical method can determine the optimum value in a shorter interval of time and with greater accuracy saving companies from extra man-hours and unscientific approach to optimizing any intermittent gas lift well.

2014 ◽  
Vol 974 ◽  
pp. 367-372
Author(s):  
Nurul Aimi Ghazali ◽  
T.A.T. Mohd ◽  
N. Alias ◽  
E. Yahya ◽  
M.Z. Shahruddin ◽  
...  

Gas lift is an artificial lift method which is commonly used in offshore operation with sufficient gas sources as it consumes minimum space on the platform. Gas lift operates by injecting a high pressure gas down through the tubing casing annulus of a well and the injected gas enters the tubing through a gas lift valve installed on the tubing. Gas lift increases production by two means, density reduction of oil column inside the tubing so that the flowing bottom-hole pressure which is affected by the hydrostatic pressure of the fluid column is reduced and by providing external energy to the oil as the gas expends.Reducing the bottom-hole pressure will improve the drawdown of the well. A production well is modelled by using a production modelling program, Integrated Production Modeling (IPM) Prosper to analyze the production performance at various conditions. A base case model is developed from the production data of an actual oil field to simulate the performance of the actual well without gas lift system. Later, the gas lift is added to the model and the performance was compared with the base case model. The gas parameter was also studied to determine the optimum injection gas condition for maximum oil production. The gas injected at 1490m can be achieved by injecting the gas with 1200 psi, l300 psi or 1400 psi. However, the optimum gas injection pressure was determined to be at 1400 psi as the design shows that the required unloading stage is the least. The optimum gas injection rate was determined at 5 MMscf/d with the estimated net revenue is the highest. For injection gas gravity, the lighter gas was determined to be the optimum selection since it gives significant reduction of FBHP (Flowing Bottom Hole Pressure) with less hydrostatic pressure inside the tubing column.


Author(s):  
Dafang Zhao ◽  
Muhammad Aamir Ali ◽  
Artion Kashuri ◽  
Hüseyin Budak ◽  
Mehmet Zeki Sarikaya

Abstract In this paper, we present a new definition of interval-valued convex functions depending on the given function which is called “interval-valued approximately h-convex functions”. We establish some inequalities of Hermite–Hadamard type for a newly defined class of functions by using generalized fractional integrals. Our new inequalities are the extensions of previously obtained results like (D.F. Zhao et al. in J. Inequal. Appl. 2018(1):302, 2018 and H. Budak et al. in Proc. Am. Math. Soc., 2019). We also discussed some special cases from our main results.


Mathematics ◽  
2021 ◽  
Vol 9 (13) ◽  
pp. 1546
Author(s):  
Mohsen Soltanifar

How many fractals exist in nature or the virtual world? In this paper, we partially answer the second question using Mandelbrot’s fundamental definition of fractals and their quantities of the Hausdorff dimension and Lebesgue measure. We prove the existence of aleph-two of virtual fractals with a Hausdorff dimension of a bi-variate function of them and the given Lebesgue measure. The question remains unanswered for other fractal dimensions.


2021 ◽  
Vol 5 (1) ◽  
pp. 38
Author(s):  
Chiara Giola ◽  
Piero Danti ◽  
Sandro Magnani

In the age of AI, companies strive to extract benefits from data. In the first steps of data analysis, an arduous dilemma scientists have to cope with is the definition of the ’right’ quantity of data needed for a certain task. In particular, when dealing with energy management, one of the most thriving application of AI is the consumption’s optimization of energy plant generators. When designing a strategy to improve the generators’ schedule, a piece of essential information is the future energy load requested by the plant. This topic, in the literature it is referred to as load forecasting, has lately gained great popularity; in this paper authors underline the problem of estimating the correct size of data to train prediction algorithms and propose a suitable methodology. The main characters of this methodology are the Learning Curves, a powerful tool to track algorithms performance whilst data training-set size varies. At first, a brief review of the state of the art and a shallow analysis of eligible machine learning techniques are offered. Furthermore, the hypothesis and constraints of the work are explained, presenting the dataset and the goal of the analysis. Finally, the methodology is elucidated and the results are discussed.


Heritage ◽  
2021 ◽  
Vol 4 (4) ◽  
pp. 3208-3237
Author(s):  
Roberta Varriale ◽  
Laura Genovese

Recent research about the theoretical approach to elements of cultural heritage that can be included in the newly born class Underground Built Heritage (UBH), has provided several instruments for the functional classification and the static and dynamic analysis of all artefacts coherent with the given definition, while introducing several criteria for their reuse and the evaluation of connected enhancement processes as well. These guidelines can be adopted to analyze single artefacts, groups of homogenous or heterogeneous elements, and also selected territorial assets or national systems, even at a comparative level. With reference to this potential, research results from the application of this new methodological approach to the outputs of three ongoing projects by the National Research Council of Italy, all focusing on UBH, in three countries: China, Japan and Italy, are presented. With reference to the above-mentioned geographical contests, the research introduces a comparative study focusing on selected examples of artefacts that have been historically built underground to manage three functions: living space, religion and economy. This study, carried out based on data collected during onsite visits by the authors, consists in three steps: selection and analysis of case studies, definition of level of reuses on the basis of a given scale, and analysis of the different tools adopted for their conservation and enhancement. In the conclusions, possible future implementations of reuses of the analyzed elements are pointed out.


2021 ◽  
Vol 2021 (5) ◽  
pp. 40-47
Author(s):  
Elena Rozhkova

The purpose of this work is the assessment and forecasting of freight car technical state at life stages. The scientific novelty consists in the definition of car operating run-up to the first failure and between failures, and also in the definition of car life to considerable repair fulfillment from the operating run between failures and development of a graphical model of freight car reliability. As a result of the statistic modeling of gondola car operating runs up to the first failure it is defined that the given random value conforms to a normal distribution law, the first car setoff in TOR due to wear failure takes place at the operating run of 85,000 km. Besides the operating run-up to the first failure there was defined an operating run-up between failures. It is proved that the operating run-up between failures conforms to the exponential law of distribution, the mathematical expectation of which is 13,000 km. The results of investigations mentioned above formed the basis of the graphical model of car reliability. An inter-repair service life of a car can be represented as a sum of the following operating run-ups: operating run-ups to the first failure, the product of operating run-ups between failures and the number of failures and a residual operating run-up (from the utmost current repair to the nearest scheduled repair). On the basis of the mentioned it is expedient to consider a technology for the realization of an enlarged repair with the purpose of the repetition exclusion in car setoffs during the inter-repair term. On the basis of the simulator there is obtained the dependence of the frequency of car enlarged current repair fulfillment depending on average operating run-up between failures. At present an enlarged current repair must be carried out only for gondola cars in the planned order after having reached 80,000 km. The repair mentioned can be carried out both under depot conditions, and under conditions of repair workshops. The advantage of such a system of repair consists in the increase car work reliability during the inter-repair term.


2021 ◽  
Author(s):  
Sagun Devshali ◽  
Ravi Raman ◽  
Sanjay Kumar Malhotra ◽  
Mahendra Prasad Yadav ◽  
Rishabh Uniyal

Abstract The paper aims to discuss various issues pertaining to gas lift system and instabilities in low producer wells along with the necessary measures for addressing those issues. The effect of various parameters such as tubing size, gas injection rate, multi-porting and gas lift valve port diameter on the performance analysis of integrated gas lift system along with the flow stability have been discussed in the paper. Field X is one of the matured offshore fields in India which has been producing for over 40 years. It is a multi-pay, heterogeneous and complex reservoir. The field is producing through six Process Complexes and more than 90% of the wells are operating on gas lift. As most of the producing wells in the field are operating on gas lift, continuous performance analysis of gas lift to optimize production is imperative to enhance or sustain production. 121 Oil wells and 7 Gas wells are producing through 18 Wellhead platforms to complex X1 of the field X. Out of these 121 oil wells, 5 are producing on self and remaining 116 with gas lift. In this paper, performance analysis of these 116 flowing gas lift wells, carried out to identify various problems which leads to sub-optimal production such as inadequate gas injection, multi-porting, CV choking, faulty GLVs etc. has been discussed. On the basis of simulation studies and analysis of findings, requisite optimization/ intervention measures proposed to improve performance of the wells have been brought out in the paper. The recommended measures predicted the liquid gain of about 1570 barrels per day (518 barrels of oil per day) and an injection gas savings in the region of about 28 million SCFD. Further, the nodal analysis carried out indicates that the aforementioned gas injection saving of 28 million SCFD would facilitate in minimizing the back pressure in the flow line network and is likely to result in an additional production gain of 350 barrels of liquid per day (65 barrels of oil per day) which adds up to a total gain of 1920 barrels of liquid per day (583 barrels of oil per day). Additionally, system/ nodal analysis has also been carried out for optimal gas allocation in the field through Integrated Production Modelling. The analysis brings out a reduction in gas injection by 46 million SCFD with likely incremental oil gain of ~100 barrels of oil per day.


2021 ◽  
Vol 13 (2) ◽  
pp. 59-78
Author(s):  
Olena Kotykova ◽  
Mykola Babych

An effective implementation of the sustainable use of agricultural land program is impossible without reliable results of the current state of the problem. In this sense, the correct selection of indicators and methods for determining the level of stability is important. The authors proposes the definition of the agricultural land use sustainability integral indicator based on three methodological approaches: the construction of the indicators system, each of them reflects some aspects of the land use sustainability at the macro level (according to the specific issues); the construction of the integral indicator for comparing the countries’ land use sustainability. According to the given methods it has been proved that agricultural land use in the countries of the post-socialist camp has a positive dynamics, but the sustainability indicators for all indicators have not achieved yet. This study was supported in part by the Erasmus SUPPA program – Jean Monnet Associations Application No 611556-EPP-1-2019-1-UA-EPPJMO-SUPPA.


2021 ◽  
Vol 1 (1) ◽  
pp. 32-50
Author(s):  
Nan Wang ◽  
Sid Chi-Kin Chau ◽  
Yue Zhou

Energy storage provides an effective way of shifting temporal energy demands and supplies, which enables significant cost reduction under time-of-use energy pricing plans. Despite its promising benefits, the cost of present energy storage remains expensive, presenting a major obstacle to practical deployment. A more viable solution to improve the cost-effectiveness is by sharing energy storage, such as community sharing, cloud energy storage and peer-to-peer sharing. However, revealing private energy demand data to an external energy storage operator may compromise user privacy, and is susceptible to data misuses and breaches. In this paper, we explore a novel approach to support energy storage sharing with privacy protection, based on privacy-preserving blockchain and secure multi-party computation. We present an integrated solution to enable privacy-preserving energy storage sharing, such that energy storage service scheduling and cost-sharing can be attained without the knowledge of individual users' demands. It also supports auditing and verification by the grid operator via blockchain. Furthermore, our privacy-preserving solution can safeguard against a majority of dishonest users, who may collude in cheating, without requiring a trusted third-party. We implemented our solution as a smart contract on real-world Ethereum blockchain platform, and provided empirical evaluation in this paper 1 .


Sign in / Sign up

Export Citation Format

Share Document