scholarly journals Forest road erosion

2012 ◽  
Vol 51 (No. 1) ◽  
pp. 37-46 ◽  
Author(s):  
J. Dobiáš

The forest road network influences surface runoff of uninfiltrated precipitation water on forest lands, mainly in hilly and mountainous areas. This water flows onto the road crown in unpaved forest roads that do not have any ditches. Dragging of extracted logs causes mechanical damage to the crown of unpaved forest road, and tracks after tractor wheels and furrows after dragged logs originate. Flowing water is accumulated in these depressions and the water stream causes erosion. The method for evaluation of conditions for the origination and degree of this erosion damage consists in the calculation of tangential stresses near the bottom at various depths of water and various gradients of road. Limit gradients of road for the origination of greater or smaller damage by erosion for the subsoil grain of various sizes are determined by a comparison of calculated tangential stresses with critical tangential stresses. Rates of discharge were calculated for the particular models of damage.

2016 ◽  
Vol 167 (5) ◽  
pp. 294-301
Author(s):  
Leo Bont

Optimal layout of a forest road network The road network is the backbone of forest management. When creating or redesigning a forest road network, one important question is how to shape the layout, this means to fix the spatial arrangement and the dimensioning standard of the roads. We consider two kinds of layout problems. First, new forest road network in an area without any such development yet, and second, redesign of existing road network for actual requirements. For each problem situation, we will present a method that allows to detect automatically the optimal road and harvesting layout. The method aims to identify a road network that concurrently minimizes the harvesting cost, the road network cost (construction and maintenance) and the hauling cost over the entire life cycle. Ecological issues can be considered as well. The method will be presented and discussed with the help of two case studies. The main benefit of the application of optimization tools consists in an objective-based planning, which allows to check and compare different scenarios and objectives within a short time. The responses coming from the case study regions were highly positive: practitioners suggest to make those methods a standard practice and to further develop the prototype to a user-friendly expert software.


Author(s):  
Seyed Ataollah Hosseini ◽  
Mohammad Reza Mazrae ◽  
Majid Lotfalian ◽  
Aidin Parsakhoo

Planning of forest road network is the most important issue for sustainable management of northern forests in Iran. This study represented a technical method of forest road planning by using GIS (Geographic Information Systems) in Vatan forestry plan of Golestan province, Iran. The aim of this study was to find out options for the optimization of skid trail length and for decreasing the negative effects of redundant skid trail length. Results of this study showed that the total length of forest road and the road network density was 36745 m and 8.68 m ha−1, respectively. 54% of the area was covered by these roads. 98.06 km skid trail was planned from road verge into the forest interior. The density of this skidding trail was 23.17 m ha−1. The suggested road network length measured using GIS was 47.23 km. Road density was 10.87 m ha−1, with 79% coverage. Skid trail length was 81.04 km, and skid trail density was 19.15 m ha−1. On the basis of GIS measurements, the skid trails on new road network system had shorter length and more frequency. This causes to decrease the cost of primary transportation. Moreover, in this plan the roads with suitable coverage passed from stable slopes. Santrauka Miško kelių tinklo planavimas – viena svarstomų problemų, siekiant užtikrinti tvarią miškotvarkos sistemą šiaurinėje Irano dalyje esančiuose miškuose. Šiame straipsnyje pristatomas miško kelių planavimo techninis metodas, taikant GIS (geografinės informacinės sistemos) programą ir naudojant Vatan miško, Golestan provincijoje, Irane, planus. Šio tyrimo tikslas – išsiaiškinti galimybes, kaip optimizuoti miško keliukų ilgį ir sumažinti neigiamą poveikį miškui, mažinant perteklinį šių keliukų trasos ilgį. Pirminiai rezultatai parodė, kad bendras esamų kelių ilgis siekia 36 745 km, kelių tinklas aprėpė 54% visos tiriamosios teritorijos, tankis siekė 8,68 m ha−1, o optimalus miško kelių tinklas buvo rengiamas pagal esamą 98,06 km ilgio miško keliukų tinklą, kurio tankis – 23,17 m ha−1. Bendras siūlomo kelių tinklo ilgis siekia 47,23 km, tankumas – 10,87 m ha−1, jis aprėpia 79% teritorijos. Miško keliukų ilgis – 81,04 km, tankumas – 19,15 m·ha−1. Remiantis GIS matavimais, naujo miško keliukų tinklo keliukai buvo trumpesni, tačiau jų tinklas tankesnis. Dėl šios priežasties mažėja pirminės transporto išlaidos ir sukuriama optimali miško keliukų aprėptis, pagerinamas prieinamumas. Резюме Планирование сети лесных дорог является одним из важнейших вопросов при создании упорядоченной системылесохозяйствования в северной части Ирана. В статье представлен технический метод планирования лесохозяйственной деятельности (прокладки дорог) с использованием ГИС и плана леса Ватан в провинции Гулистан Ирана. Целью исследования было выяснить возможности оптимизации длины лесных дорог и уменьшениянегативных последствий их избыточной длины. Результаты исследования показали, что общая протяженность существующих лесных дорог составляет 36 745 км, сеть дорог охватывает 54% всей исследованной территории,ее плотность – 8,68 м га−1. Оптимальная сеть лесных дорог создавалась на основании имеющейся сети лесных дорог, протяженность которой 98,06 км, плотность – 23,17 м гa−1. Протяженность предлагаемой сети дорог составит 47,23 км, плотность – 10,87 м гa−1, она охватит 79% территории. Длина лесных дорог составит 81,04 км, а плотность – 19,15 м·гa−1. На основании измерений, проведенных с использованием ГИС, длина дорог лесной сети стала короче, а сеть более густой. В связи с этим снижаются первичные затраты на транспорт, охват леснымидорогами становится более оптимальным, увеличивается доступность.


2018 ◽  
Vol 64 (No. 9) ◽  
pp. 402-408
Author(s):  
Hosseini Seyed Ata Ollah ◽  
Gorgandipur Mohsen ◽  
Nikooy Mehrdad

Road is a necessity for attaining ideas, principles and management plan in a forestry unit (district). The forest road network design must be aimed at a multi-purpose use of roads such as landscaping and tourism activities. This study was performed in the Namkhaneh section of Kheyrud forest 10 km east of Noshahr (Hyrcanian forest). First, the map of factors affecting the road routing was provided including trees type, soil, aspect, slope, altitude, etc. using GIS and determined parts of lookout on a topographic map of the study area. Then a new variant was designed as the secondary road and turnoff from the existing road trying to pass from more parts of lookout in its designing. Finally, existing and completive road networks were compared in terms of opening up and parts of lookout using the Backmund method. The results showed that the completive road network has more forest openness and more parts of lookout compared to the existing road network.


2019 ◽  
Vol 22 (2) ◽  
pp. 88-92
Author(s):  
Jaromír Skoupil ◽  
Petr Pelikán ◽  
Jiří Kadlec

Abstract The paper is focused on the forest road access in the area of supposed specific method of forest management. The studied forest area of 81 hectares (ha) is intended for transformation by selective silviculture method demanding dense forest road network. The parameters of the current road network were analysed by Beneš method based on quantifying the general geometric and configuration criteria of the road network. The new road distribution was designed with respect to the results of the terrain slope and runoff concentration analyses to reduce the negative impacts of the roads on the surrounding environment. The new road layout resulted to the decrement of all types of skidding distances. The real skidding distance Ds decreased by 51% to the value of 72 m. In addition, the road network efficiency was increased by 14%.


2011 ◽  
Vol 57 (No. 11) ◽  
pp. 467-471 ◽  
Author(s):  
M. Lotfalian ◽  
E.H. Zadeh ◽  
S.A. Hosseini

  Average skidding distance for forest stands is an important parameter for the determination of the optimum road density and spacing. In this research the real mean skidding distance and theoretical mean skidding distance were measured to calculate the correction factor of skidding distance for Chafrood forest in Hyrcanian zone. The length and azimuth of skid trails from road and depot junction to forest interior were measured. Moreover, the position of skid trail was recorded by GPS. These skid trails with a buffer of 140 m were designed on a topographical map using Arc GIS software. Results indicated that the road spacing of 500 m in the study area resulted in a theoretical mean skidding distance of 125 m. For a real mean skidding distance of 525.9 m and for the mean slope of 40%, the correction factor was estimated to be 4.2.


Author(s):  
Said M. Eshansada ◽  

The development and improvement of the road network is a strategic task of the Islamic Republic of Afghanistan. To develop the sparsely populated territories of the country, it is necessary to build and repair thousands of kilometers of highways, a significant part of which is located in the piedmont and mountainous areas. Considering the fact that the Republic of Afghanistan is characterized by a dry and hot climate, as well as a variety of soil and hydrological conditions, one of the main road building materials for solving this problem is road cement concrete, which has recently become the subject of intensive research. This article presents the results of researching the effect of the Adinol Rapid 2H additive (which is a hardening accelerator additive) on the technological properties of the concrete mixture and the strength of cement concrete.


2013 ◽  
Vol 47 (4) ◽  
pp. 1739
Author(s):  
C. Loupasakis ◽  
G. Lalos ◽  
D. Rozos

The steep morphology and the intense tectonic fragmentation of the mountainous areas of Greece combined with the dense road network create conditions favorable for the manifestation of rockfalls. Numerous events are recorded through the years, some of them causing injuries or even worse loss of lifes. The rockfall that took place along the Kimi – Platana – Paralia provincial road on August 2008, was studied in detail and is presented in the current paper. The rock detachment area was defined 200m away and at an altitude of 140m (130m higher from the road), while the rock pieces detached had a maximum volume of 4m3. The final consequences were two crashed cars and a heavily injured civilian. The causual factors as well as the proposed remedial measures, estimated by the use of RocFall by Rockscience Ltd., are described in detail. Furthermore, the temporary remedial measures applied by contractors are evaluated, pointing their defects.


Author(s):  
W. Zhang ◽  
B. Hu ◽  
L. Quist

A novel algorithm for forest road identification and extraction was developed. The algorithm utilized Laplacian of Gaussian (LoG) filter and slope calculation on high resolution multispectral imagery and LiDAR data respectively to extract both primary road and secondary road segments in the forest area. The proposed method used road shape feature to extract the road segments, which have been further processed as objects with orientation preserved. The road network was generated after post processing with tensor voting. The proposed method was tested on Hearst forest, located in central Ontario, Canada. Based on visual examination against manually digitized roads, the majority of roads from the test area have been identified and extracted from the process.


Sign in / Sign up

Export Citation Format

Share Document