Gas Turbine-Based Combined Cycle Power Plant Modeling and Effects of Ambient Temperature

Author(s):  
Paul Shaw ◽  
Farshid Zabihian ◽  
Alan S. Fung

This paper presents results of the combined cycle power plant (CCPP) modeling when the ambient temperature is varying. The model of the CCPP was developed using a gas turbine and a heat recovery steam generator (HRSG) models that had been already developed and validated. The model of the components was developed based on an actual existing power plant and then the operational data of the power plant was used to validate the model. The results of running the model for various ambient temperatures demonstrated that the performance of the gas turbine part of the cycle was heavily affected by the changes in the ambient temperature, particularly the output power of the gas turbines. However, the performance of the steam cycle was almost untouched by the changes of ambient temperature. This suggests that operation of the CCPP is more stable than stand-alone gas turbine in hot summer days especially if the cycle is not equipped with an inlet air cooling system.

Author(s):  
Hiroyuki Yamazaki ◽  
Yoshiaki Nishimura ◽  
Masahiro Abe ◽  
Kazumasa Takata ◽  
Satoshi Hada ◽  
...  

Tohoku Electric Power Company, Inc. (Tohoku-EPCO) has been adopting cutting-edge gas turbines for gas turbine combined cycle (GTCC) power plants to contribute for reduction of energy consumption, and making a continuous effort to study the next generation gas turbines to further improve GTCC power plants efficiency and flexibility. Tohoku-EPCO and Mitsubishi Hitachi Power Systems, Ltd (MHPS) developed “forced air cooling system” as a brand-new combustor cooling system for the next generation GTCC system in a collaborative project. The forced air cooling system can be applied to gas turbines with a turbine inlet temperature (TIT) of 1600deg.C or more by controlling the cooling air temperature and the amount of cooling air. Recently, the forced air cooling system verification test has been completed successfully at a demonstration power plant located within MHPS Takasago Works (T-point). Since the forced air cooling system has been verified, the 1650deg.C class next generation GTCC power plant with the forced air cooling system is now being developed. Final confirmation test of 1650deg.C class next generation GTCC system will be carried out in 2020.


Author(s):  
Farshid Zabihian ◽  
Alan S. Fung ◽  
Fabio Schuler

Gas turbine-based power plants are very sensitive to ambient conditions and their output power and efficiency can be decreased significantly with increase in the ambient temperature. Various compressor inlet air cooling systems have been proposed and utilized to reduce inlet air temperature to the system, including evaporative systems e.g. media and fogging, and mechanical cooling systems. In this work, different techniques for compressor inlet air cooling are briefly reviewed. Then, the fogging system employed in the Whitby cogeneration power plant is explained with particular attention to the location of the system installation. A model of the gas turbine-based cogeneration plant is also developed to simulate the Whitby cogeneration power plant. The effects of fogging compressor inlet air cooling system on the performance of the plant are investigated. The results indicate that at an ambient temperature of 30°C and relative humidity of 40% the inlet cooling of as high as 8.4°C is possible which can increase output power to more than 50 MW. Also, it is found that the model can predict the gas turbine exhaust temperature and the plant’s power production with the error level of lower than 0.5% and 3%, respectively.


Volume 1 ◽  
2004 ◽  
Author(s):  
Mohammad Ameri ◽  
Hamid Nabati ◽  
Alireza Keshtgar

Gas turbines are almost constant volume machines at a specific rotating speed, i.e., air intake is limited to a nearly fixed volume of air regardless of ambient air conditions. As air temperature rises, its density falls. Thus, although the volumetric flow rate remains constant, the mass flow rate is reduced as air temperature rises. Power output is also reduced as air temperature rises because power output is proportional to mass flow rate. This power output reduction is from 0.5% to 0.9% of the ISO output power for every 1°C rise in the ambient temperature. The solution of this problem is very important because the peak demand season also happens in the summer. One of the useful methods to overcome this problem is to apply the fog inlet air cooling system for the gas turbines. In this paper the Rey Power Plant site climate conditions in the summer have been studied. The design conditions regarding the dry bulb temperature and relative humidity have been selected. The different inlet air cooling systems have been studied and the Fog system has been chosen. The economical study has shown that this system is very cheap in comparison with the installation of the new gas turbines. The capital cost is estimated to be 40 $/KW. The pay back period is around 1.5 year. The testing of this system has shown that the average power capacity of the power plant is increased by 19 MW and prevented the installation of a new gas turbine.


Author(s):  
Edgar Vicente Torres González ◽  
Raúl Lugo Leyte ◽  
Martín Salazar Pereyra ◽  
Helen Denise Lugo Méndez ◽  
Miguel Toledo Velázquez ◽  
...  

In this paper is carried out a comparison between a gas turbine power plant and a combined cycle power plant through exergetic and environmental indices in order to determine performance and sustainability aspects of a gas turbine and combined cycle plant. First of all, an exergetic analysis of the gas turbine and the combined is carried out then the exergetic and environmental indices are calculated for the gas turbine (case A) and the combined cycle (case B). The exergetic indices are exergetic efficiency, waste exergy ratio, exergy destruction factor, recoverable exergy ratio, environmental effect factor and exergetic sustainability. Besides, the environmental indices are global warming, smog formation and acid rain indices. In the case A, the two gas turbines generate 278.4 MW; whereas 415.19 MW of electricity power is generated by the combined cycle (case B). The results show that exergetic sustainability index for cases A and B are 0.02888 and 0.1058 respectively. The steam turbine cycle improves the overall efficiency, as well as, the reviewed exergetic indexes. Besides, the environmental indices of the gas turbines (case A) are lower than the combined cycle environmental indices (case B), since the combustion gases are only generated in the combustion chamber.


Author(s):  
John Confurius

The profits that can be gained by use of inlet air cooling on gas turbines has been recognised for quite some time now and the systems installed throughout the world have shown the users in the gas turbine field that cooling indeed can be used to boost power at times when the ambient temperature reaches or exceeds the ISO rating temperature of the gas turbine. Drawback however being that the initial investment asked of the gas turbine user is rather large thus only justifying a cooling system in regions where the outdoor temperatures exceed the ISO rating time and again due to the climate in that region. Lately gas turbine users in colder climates have become interested in power augmentation during their short summer, however there is no justification for an investment like necessary when installing one of the presently available systems on the market. As the question reached us from more and more of our clients it stimulated us to go out and search for a low-investment solution to this problem. This resulted in the world’s first low pressure gas turbine inlet cooling system.


Author(s):  
S. Can Gülen

Duct firing in the heat recovery steam generator (HRSG) of a gas turbine combined cycle power plant is a commonly used method to increase output on hot summer days when gas turbine airflow and power output lapse significantly. The aim is to generate maximum possible power output when it is most needed (and, thus, more profitable) at the expense of power plant heat rate. In this paper, using fundamental thermodynamic arguments and detailed heat and mass balance simulations, it will be shown that, under certain boundary conditions, duct firing in the HRSG can be a facilitator of efficiency improvement as well. When combined with highly-efficient aeroderivative gas turbines with high cycle pressure ratios and concomitantly low exhaust temperatures, duct firing can be utilized for small but efficient combined cycle power plant designs as well as more efficient hot-day power augmentation. This opens the door to efficient and agile fossil fuel-fired power generation opportunities to support variable renewable generation.


Author(s):  
Carlo M. Bartolini ◽  
Danilo Salvi

The steam generated through the use of waste heat recovered from a steam injection gas turbine generally exceeds the maximum mass of steam which can be injected into steam injection gas turbine. The ratio between the steam and air flowing into the engine is not more than 10–15%, as an increase in the pressure ratio can cause the compressor to stall. Naturally, the surplus steam can be utilized for a variety of alternative applications. During the warmer months, the ambient temperature increases and results in reduced thermal efficiency and electrical capacity. An inlet air cooling system for the compressor on a steam injection gas turbine would increase the rating and efficiency of power plants which use this type of equipment. In order to improve the performance of steam injection gas turbines, the authors investigated the option of cooling the intake air to the compressor by harnessing the thermal energy not used to produce the maximum quantity of steam that can be injected into the engine. This alternative use of waste energy makes it possible to reach maximum efficiency in terms of waste recovery. This study examined absorption refrigeration technology, which is one of the various systems adopted to increase efficiency and power rating. The system itself consists of a steam injection gas turbine and a heat recovery and absorption unit, while a computer model was utilized to evaluate the off design performance of the system. The input data required for the model were the following: an operating point, the turbine and compressor curves, the heat recovery and chiller specifications. The performance of an Allison 501 KH steam injection gas plant was analyzed by taking into consideration representative ambient temperature and humidity ranges, the optimal location of the chiller in light of all the factors involved, and which of three possible air cooling systems was the most economically suitable. In order to verify the technical feasibility of the hypothetical model, an economic study was performed on the costs for upgrading the existing steam injection gas cogeneration unit. The results indicate that the estimated pay back period for the project would be four years. In light of these findings, there are clear technical advantages to using gas turbine cogeneration with absorption air cooling in terms of investment.


Sign in / Sign up

Export Citation Format

Share Document