cryogenic permanent magnet undulator
Recently Published Documents


TOTAL DOCUMENTS

18
(FIVE YEARS 0)

H-INDEX

6
(FIVE YEARS 0)

Author(s):  
Ling-Ling Gong ◽  
Xiao-Yu Li ◽  
Yu-Hui Li ◽  
Ya-Jun Sun ◽  
Hui-Hua Lu ◽  
...  

2020 ◽  
Vol 3 (7) ◽  
pp. 7281-7290
Author(s):  
Shiv Prakash Singh ◽  
Ralf Witte ◽  
Oliver Clemens ◽  
Abhishek Sarkar ◽  
Leonardo Velasco ◽  
...  

2020 ◽  
Vol 30 (4) ◽  
pp. 1-5
Author(s):  
Chin-Kang Yang ◽  
Jui-Che Huang ◽  
Chih-Sheng Yang ◽  
Chih-Wei Chen ◽  
Yun-Liang Chu ◽  
...  

2020 ◽  
Vol 30 (4) ◽  
pp. 1-5
Author(s):  
Chih-Yu Liao ◽  
Chun-Yi Wu ◽  
Jenny Chen ◽  
Demi Lee ◽  
Hong-Zhe Chen ◽  
...  

2018 ◽  
Vol 28 (3) ◽  
pp. 1-5
Author(s):  
Chin-Kang Yang ◽  
Wen-Hsuan Hsieh ◽  
Yun-Liang Chu ◽  
C. H. Chang ◽  
Cheng-Ying Kuo ◽  
...  

2017 ◽  
Vol 24 (5) ◽  
pp. 919-924 ◽  
Author(s):  
Toshiya Tanabe ◽  
Harmanpreet Bassan ◽  
Andrew Broadbent ◽  
Peter Cappadoro ◽  
John Escallier ◽  
...  

The National Synchrotron Light Source (NSLS) ceased operation in September 2014 and was succeeded by NSLS-II. There were four in-vacuum undulators (IVUs) in operation at NSLS. The most recently constructed IVU for NSLS was the mini-gap undulator (MGU-X25, to be renamed IVU18 for NSLS-II), which was constructed in 2006. This device was selected to be reused for the New York Structural Biology Consortium Microdiffraction beamline at NSLS-II. At the time of construction, IVU18 was a state-of-the-art undulator designed to be operated as a cryogenic permanent-magnet undulator. Due to the more stringent field quality and impedance requirements of the NSLS-II ring, the transition region was redesigned. The control system was also updated to NSLS-II specifications. This paper reports the details of the IVU18 refurbishment activities including additional magnetic measurement and tuning.


Sign in / Sign up

Export Citation Format

Share Document