The regulatory detailed planning is substantive legal planning stage of urban planning in China. The first problem is the need to check and inheritance the indicators of total planning land about construction in the process of compiling. According to city zoning rules establishment work reality, the basic thought of the system analysis, the traffic engineering and urban planning in the related theory and method on the basis of macroscopic traffic flow classification, using the road network capacity calculation method and traffic distribution forecasting method proposed with interregional channel planning level of service and the internal road network planning level of service as the control target, proposes the method by using the master planning road network control to inversely calculate the total amount for the construction of district land use. The calculation example is also given. Studies show that the presented control rules compiled for checking algorithm can play check function about the amount of land used for construction master planning achieve under the premise of the control overall situation trunk road network level of service, to avoid the amount of unnecessary in the subsequent units, neighbourhood planning adjustments.


2014 ◽  
Vol 587-589 ◽  
pp. 1916-1919
Author(s):  
Ming Jie Wang ◽  
Jian Jun Wang ◽  
Teng Fei Zhang

Based on the bidirectional interaction theory of land use and transportation, and reference to the research achievements of traffic impact assessment at home and abroad, taking one Xi’an construction project as the research object, so as to explore the guidance the regulatory detailed planning of urban construction project traffic impact assessment of background traffic demand forecast.


2014 ◽  
Vol 584-586 ◽  
pp. 395-398
Author(s):  
Liu Zhong Jiang ◽  
Yuan Yuan Gong

Regulatory plan becomes more important with the enaction of Urban-Rural Planning Law. Complete coverage of regulatory detailed planning is imperative. But the deficiencies and contradictions exhibit from planning and management practices in regulatory detailed planning have become increasingly prominent. At present, planning compilation is faced issues such as low elasticity, divorce of urban development. Abandon static control, using dynamic maintenance are the new directions to the development of regulatory detailed planning. Regulatory control system maintained dynamically regards action plan as guiding concept, regards GIS technology as data platform, which is a dynamic, phased, chronic planning process.


2013 ◽  
Vol 409-410 ◽  
pp. 818-821
Author(s):  
Mi Mi Yu

This paper summarizes the problems of the regulatory detailed planning currently, and draw the conclusion that lack of economic analysis is one of the reasons. This paper investigate how to use economic analysis in regulatory detailed planning in order to increase the operability of regulatory detailed planning.


2013 ◽  
Vol 689 ◽  
pp. 500-504
Author(s):  
Bin Shi ◽  
Kang Cai Nie

Under the background of the new village rapid planning and construction, the author tries to explore regulatory detailed planning ideas and methods on district from the structure of land use, spatial layout, road system, land development control. It aims at solving township in regulatory plan coordination control and providing reference for small towns and suburbs of regulatory detailed planning village planning and construction.


2011 ◽  
Vol 368-373 ◽  
pp. 1710-1713
Author(s):  
Xiao Wei Zheng ◽  
Ming Hua Huang ◽  
Yang Wang ◽  
Hui Quan Cao

On the basis of analyzing the pros and cons of the current practice of full coverage of regulatory detailed planning, the paper aims to establish a dynamic regulatory detailed planning featuring a comprehensive regulation both macroscopically and microscopically. The paper holds the belief that the coverage scope of the regulatory detailed planning should be the short-term construction area; in case that the practice of “Full Coverage” needs to be conducted, it shall be compiled on the basis of time sequence by separating the short-term and long-term project. The compilation for short-term project should start from the region and go deeper into the block and land parcel, and the development intensity index should be worked out according to the stage of land leasing in specific project; the compilation for long-term project should focus on the region and block area, and the development intensity index should be formulated in line with the city’s specific development stage and then make adjustment accordingly.


2011 ◽  
Vol 99-100 ◽  
pp. 569-572
Author(s):  
Zheng Wang ◽  
Tao Zheng ◽  
Juan Xiong

Chongqing is a typical mountainous city and favorable exploration has been made with respect to the preparation of the regulatory detailed planning through decades of urban planning and construction. In combination with the experience of Chongqing, the planning method is discussed on the actuality of the land under investigation and analysis, the protection and creation of the landscape features, the establishment of the harmonious relations between human and city as well as nature in respect of the actuality investigation & analysis and the planning layout exploration.