linear schedules
Recently Published Documents


TOTAL DOCUMENTS

20
(FIVE YEARS 1)

H-INDEX

7
(FIVE YEARS 0)

Author(s):  
Gunnar Lucko ◽  
Yi Su

AbstractThe inaugural challenge of the 2016 Creative Construction Conference has posed two related questions on how many possible criticality constellations with different behaviors for delays and acceleration exist and how said constellations can occur for nonlinearly and monotonously progressing activities that have continuous relations. This paper systematically solves these questions by performing a thorough literature review, assembling theoretical foundations for link constellations, performing a computer simulation of all possible permutations, and providing a mathematical proof by contradiction. It is found that (for the initially assumed self-contained activities in a network schedule that exhibit only a linearly growing production), three newly hypothesized criticality constellations cannot exist. Nonlinear activity constellations with diverging or converging relative productivities are examined next. Lags in networks become buffers in linear schedules. It is found that a nonlinear curvature of the progress may induce middle-to-middle relations besides those between start and finish. If multiple curvatures are allowed, then partial segments can form relations, which increase the number of criticality constellations. This paper is extended from the 2017 Procedia Engineering conference version.


2016 ◽  
Vol 2016 ◽  
pp. 1-16
Author(s):  
Nizar Markiz ◽  
Ahmad Jrade

Heavy earthmoving operations are repetitive in nature and vulnerable to time-related restraints and uncertainties. Therefore, at the conceptual stage, scheduling these operations can take a linear form, known as linear schedule or line of balance (LOB). In such type of work, generating a preliminary line of balance for variable sequencing of activities is crucial. In this paper, an integrated expert system for determining preliminary linear schedules for heavy earthmoving operations at the conceptual stage is presented. The proposed system incorporates numerous factors that influence the analysis of earthmoving operations, which include geological and topographical parameters used to determine productivity rates at the conceptual stage. Also, the proposed system is capable of automatically generating a line of balance based on a stochastic scheduling technique via the metaheuristic simulated annealing intelligent approach to incorporate randomness and uncertainties in performing the associated activities. A parametric analysis is conducted in order to quantify the system’s degree of accuracy. An actual case project is then utilized to illustrate its numerical capabilities. Generating accurate linear schedules for heavy earthmoving operations at the conceptual design stage is anticipated to be of major significance to infrastructure project stakeholders, engineers, and construction managers by detecting schedule’s conflicts early in order to enhance overall operational logistics.


2015 ◽  
Vol 23 (2) ◽  
pp. 222-231 ◽  
Author(s):  
Nizar MARKIZ ◽  
Ahmad JRADE

Success of major embankment dam construction projects is measured by the enormity of optimizing costs and schedules of selected heavy equipment based on their operational analyses. In this paper, the main objective is geared towards developing a knowledge-based decision support system for optimizing costs of heavy earthmoving operations and corresponding linear schedules at early design stages. Also, the proposed system is capable of generating an auto­mated linear schedule based on stochastic scheduling techniques. Thus, a meta-heuristic simulated approach utilizing a metropolis algorithm is implemented to assist in generating optimized line-of balances. The successful implementation of the proposed system will provide the user with optimum fleet of equipment for performing earthwork operations and linear scheduling for strategic planning purposes. Towards the end, an actual dam construction project is utilized to numerically validate the proposed system and quantify its degree of accuracy. Results presented in this study are an­ticipated to be of major significance to owners, designers, and construction managers specialized in embankment dams heavy earthmoving operations and would contribute to the database of fleet management systems by incorporating a novel system that integrates heavy equipment economical operational analyses with its corresponding line of balance.