scholarly journals Non Excusable Delays in Construction Industry: A Causal Study

2018 ◽  
Vol 8 (6) ◽  
pp. 3561-3564
Author(s):  
S. H. Khahro ◽  
Z. A. Memon

Delays are one of the major problems construction industry faces. Delays can lead to many negative effects such as arbitration between owners and contractors, increased cost, loss of productivity and revenue, and contract termination. Various studies have been carried out to highlight the general causes of delays and suggest possible remedial measures to minimize the effect of delays on a project. This study aims to highlight the critical factors with specific reference to non-excusable delays (NEDs) only. It also suggests possible remedial measures to minimize the effects of contractor-oriented NEDs which is a significant type of delays in the construction industry. A qualitative study has been conducted for this research. Data have been collected by the use of a set of questionnaires on numerous construction project stakeholders. Relative importance index (RII) has been used for prioritizing the factors. Results show that slow material mobilization, subcontractor unreliability and shortage of labor and materials are the most critical NED causes. This paper aims to provide a prerequisite knowledge to practitioners to make a more informed decision in managing NED.

2018 ◽  
Vol 9 (1) ◽  
pp. 41-49
Author(s):  
P. Muralidhar ◽  
Rahul Kumar Jain ◽  
B. Srivasta ◽  
V. Poorna Chandra Rao

The construction industry is one of the major sectors that provide important ingredients for the development of country’s economy. A survey is conducted to identify the major causes of construction delays, its effects, and minimizing delays in construction projects using relative importance index method. The questionnaire was circulated among various construction companies located in India to find the reasons which are affecting the construction projects in India. The various factors are identified for this purpose and these critical factors are then categorized into owner, contractor, consultant, material, design, labor, equipment and external factors. About fifty six responses are received for the analysis purpose. SPSS software is applied to perform the analysis. The survey is concentrated on the frequency of occurrence of this factors and what is the severity of this factors in the five point scale.


Author(s):  
Milind T. Phadtare

Delay in construction projects is a universal phenomenon. However, the topic is not adequately studied in the Indian context. This paper attempts to identify the causes of delays in construction of budget hotels in India and suggest remedies to avoid some delays. A business group constructing budget hotels across the country is approached for this study. Forty causes of delay have been identified and Relative Importance Index was calculated. The contribution of each category of causes of delay to overall delay in the projects was computed. Remedies such as, joint effort of the participants of the industry, training, coordination between project participants and project timing and scheduling are suggested and validated.


Author(s):  
Aly Elgayar ◽  
Salwa Mamoun Beheiry ◽  
Alaa Jabbar ◽  
Hamad Al Ansari

Purpose Over the past decade, the United Arab Emirates (UAE) introduced several green regulatory guidelines, federal decrees, and a considerable number of environmentally friendly initiatives. Hence, the purpose of this paper is to investigate the top green materials and systems used currently in the UAE construction industry as per the new laws dictate as well as see if professionals are switching over to incorporate more green materials, systems, and/or designs. Design/methodology/approach The work involved reviewing internationally popular green materials and systems for construction, developing a questionnaire based on the literature review, surveying professionals in the seven UAE emirates, and ranking the findings based on the relative importance index. Findings Findings found the top used green materials and system in the UAE’s construction industry. As well as identified that there is a communication gap between the design and implementation phases that is possibly hindering the use of more green materials and systems. Originality/value This study sets a baseline to measure the UAE’s progress over the coming years in terms of integrating more green construction materials, systems, methodologies, and trends.


2018 ◽  
Vol 25 (4) ◽  
pp. 497-533 ◽  
Author(s):  
Parvaneh Shahsavand ◽  
Akbar Marefat ◽  
Majid Parchamijalal

Purpose The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project. Design/methodology/approach This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors. Findings In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Originality/value All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.


2017 ◽  
Vol 2017 ◽  
pp. 1-6
Author(s):  
Richard Oduro Asamoah ◽  
John Solomon Ankrah ◽  
Philip Bannor ◽  
Kofi Ofei-Nyako

Buildings represent significant investment of developers and, as such, it is important to ensure value for the capital injected into the construction of buildings. Unfortunately, due to neglect of proper construction practices, buildings are facing defects, and one of such defects is rising damp. This study sought to identify some of the construction practices contributing to rising damp in buildings and their effects and suggest some remedial measures for controlling and treatment of rising damps. Snowball sampling and purposive sampling techniques were used to gather data from a cross section of 78 building environment professionals in Kumasi and Ejisu who have experienced the effects of moisture rise. Relative Importance Index was used to rank the significance of the causes. The study revealed that failure to use damp-proof membrane or course, presence of groundwater, porosity of masonry, and concrete element sand flooding were the main causes of rising damp. Undersetting and saw slotting, making good plumbing leakages, using approved waterproof chemical injection, and application of admixtures were the main measures recommended to avert rising damp.


Author(s):  
Waqas Farid ◽  
Nadeem Ishaq Kureshi ◽  
Suqrat Babar ◽  
Shahid Mahmood

The aim of this paper is to identify various risk factors faced by construction industry during execution phase of the project. Relevant published literature was studied for the identification of the risk factors and professionals from the local construction industry of Pakistan were asked to rank these risk factors as per their impact on the local projects. Qualitative risk analysis was conducted using the RII (Relative Importance Index) scores and risk scores were calculated. To improve the quality of construction key risk factors highly influencing the local construction industry of Pakistan were identified. Amongst these factors, Construction delays due to unforeseen impediments, payment delays from Client and unreasonable and inflexible decisions were the crest causes highly influencing the project outcome. The top ten risks faced at projects in Pakistan were listed, discussed and conclusions were drawn.


Author(s):  
Milind T. Phadtare

Delay in construction projects is a universal phenomenon. However, the topic is not adequately studied in the Indian context. This paper attempts to identify the causes of delays in construction of budget hotels in India and suggest remedies to avoid some delays. A business group constructing budget hotels across the country is approached for this study. Forty causes of delay have been identified and Relative Importance Index was calculated. The contribution of each category of causes of delay to overall delay in the projects was computed. Remedies such as, joint effort of the participants of the industry, training, coordination between project participants and project timing and scheduling are suggested and validated.


Author(s):  
Kranti kumar Myneni

Delays can be well-defined as the escalation of the stipulated time for the completion of the project. Delay is always the major loss to any construction project. In construction projects delay is a very usual thing and it can have an adverse effect on the project’s time and cost. As construction is one of the largest economic activity in India, the effects of delay are still in millions, which surely decreases the GDP of the country. Delay makes the process tardy and management of delay is extremely challenging as most of the projects do not meet the expected requirement and fails to perform within time. Therefore, various types and causes of delays should be studied accurately. There are many researches on construction delays but they talk about the wide-ranging reasons of delay, so there stays a high requirement of a notable and feasible study on delays at different stages of construction process in India. The aim of the paper is to identify the causes of delays at different stages of construction through questionnaire survey in Indian construction industry. Analytical tools used in this research are relative importance index (RII) and spearman’s rank correlation coefficient to rank the sources of delay with respect to its occurrence in the various stages of the construction project. The study concludes based on the correlation coefficient analysis between the construction stages, that the delays associated with before-construction stage is least related, with after-construction stage is third highly related, with construction stage is second highly related and delays associated with average/overall construction is highly related.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Md. Ikramul Hoque ◽  
Md. Abu Safayet ◽  
Md. Jewel Rana ◽  
Abu Yousuf Bhuiyan ◽  
Golam Sadmani Quraishy

PurposeConstruction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approachAn extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.FindingsAmong the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.Originality/valueThe outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.


2019 ◽  
Vol 15 (4) ◽  
pp. 16-37 ◽  
Author(s):  
Deepak M.D. ◽  
Gangadhar Mahesh ◽  
Narotham Kumar Medi

Many studies have been conducted in relation with knowledge management (KM), indicating the benefit associated with KM; among which safety management (SM) improvement is one of them. So, the aim of this article is to assess the influence of KM on SM practices in construction industry. In this regard, various factors that affect KM and SM are identified through literature review. Then, a questionnaire survey was facilitated to collect data based on the identified factors. These factors are ranked using a relative importance index (RII) to ascertain the level of importance among its group. Further, correlation analysis and multiple linear regression analysis are carried out to test and measure the strength of the relationship between KM and SM factors. Results indicate that there exists a definite and significant relationship between the factors of KM and SM in construction industry. Overall, the results obtained from the study will assist practitioners and professionals to develop and upgrade KM and SM practices in construction industry.