Discussion on the Innovation of Construction Project Management and Green Construction Management

2021 ◽  
2019 ◽  
Vol 11 (8) ◽  
pp. 2239 ◽  
Author(s):  
Seyit Ali Erdogan ◽  
Jonas Šaparauskas ◽  
Zenonas Turskis

The article briefly discusses the content and terms of construction project management. It identifies the main problems of construction management and discusses ways to solve those using multi-criteria methods. Well-performed management is one of the critical factors which leads to the success of any significant sustainable project. Construction project management consists of setting goals and defining user requirements, project constraints, and resources needed. This paper aims to create a practically useful model. The paper presents a comprehensive set of criteria, which led to the creation of a decision-making model for construction management, which was applied to a Turkish case study. The Analytic Hierarchy Process (AHP) method and the Expert Choice computer program were used for calculations.


2013 ◽  
Vol 405-408 ◽  
pp. 3376-3379
Author(s):  
Hai Xie ◽  
Zhi Jun Zhang

Construction management or construction project management (CPM) is the overall planning, coordination, and control of a project from beginning to completion. CPM is aimed at meeting a clients requirement in order to produce a functionally and financially viable project. CPM is project management that applies to the construction sector. The construction industry is composed of five sectors: residential, commercial, civil, industrial, and environmental. A construction manager holds the same responsibilities and completes the same processes in each sector. All that separates a construction manager in one sector from one in another is the knowledge of the construction site. This may include different types of equipment, materials, subcontractors, and possibly locations. A contractor is assigned to a construction project once the design has been completed by the architect or is still in progress. This is done by going through a bidding process with different contractors. The contractor is selected by using one of the three selection methods: low-bid selection, best-value selection, or qualifications-based selection. A construction manager should have the ability to handle public safety, time management, decision making, mathematics, and human resources.


2011 ◽  
Vol 291-294 ◽  
pp. 3409-3414
Author(s):  
Bao Ku Qi ◽  
Yu Qu ◽  
Jing Ming Zhao

In this paper, green construction project management concepts, analysis the green project management research status of our country, on this basis, establish a green construction project management evaluation system, and study and explore systematically on the evaluation methods. In the low-carbon economy, this increase of green construction project management has important theoretical and practical value.