The Design and Deployment of Open Hole Standalone Screens and Two Cased Hole Gravel Pack in Highly Deviated Well—A Case History with A Field in Malaysia

2016 ◽  
Author(s):  
Mohd Fakhrin Ab Rasid ◽  
Siti Nur Mahirah Mohd Zain ◽  
Godwin Akujobi Osuji-Bells ◽  
Orient Balbir Samuel ◽  
Jose Zabala ◽  
...  
Keyword(s):  
2014 ◽  
Author(s):  
Clotaire Marie Eyaa Allogo ◽  
Mark R Luyster ◽  
Chau Nguyen ◽  
Ray Ravitz ◽  
Anna Marie Perardel

2021 ◽  
Author(s):  
Seng Wei Jong ◽  
Yee Tzen Yong ◽  
Yusri Azizan ◽  
Richard Hampson ◽  
Rudzaifi Adizamri Hj Abd Rani ◽  
...  

Abstract Production decline caused by sand ingress was observed on 2 offshore oil wells in Brunei waters. Both wells were completed with a sub-horizontal openhole gravel pack and were subsequently shut in as the produced sand would likely cause damage to the surface facilities. In an offshore environment with limited workspace, crane capacity and wells with low reservoir pressures, it was decided to intervene the wells using a catenary coiled tubing (CT) vessel. The intervention required was to clean out the sand build up in the wells and install thru-tubing (TT) sand screens along the entire gravel packed screen section. Nitrified clean out was necessary due to low reservoir pressures while using a specialized jetting nozzle to optimize turbulence and lift along the deviated section. In addition, a knockout pot was utilized to filter and accommodate the large quantity of sand returned. The long sections of screens required could not be accommodated inside the PCE stack resulting in the need for the operation to be conducted as an open hole deployment using nippleless plug and fluid weight as well control barrier. A portable modular crane was also installed to assist the deployment of long screen sections prior to RIH with CT. Further challenges that needed to be addressed were the emergency measures. As the operation was to be conducted using the catenary system, the requirement for an emergency disconnect between the vessel and platform during the long cleanout operations and open hole deployment needed to be considered as a necessary contingency. Additional shear seal BOPs, and emergency deployment bars were also prepared to ensure that the operation could be conducted safely and successfully.


2014 ◽  
Author(s):  
A.. Bottiglieri ◽  
A.. Brandl ◽  
R.S.. S. Martin ◽  
R.. Nieto Prieto

Abstract Cementing in wellbores with low fracture gradients can be challenging due to the risk of formation breakdowns when exceeding maximum allowable equivalent circulation densities (ECDs). Consequences include severe losses and formation damage, and insufficient placement of the cement slurry that necessitates time-consuming and costly remedial cementing to ensure zonal isolation. In recent cementing operations in Spain, the formation integrity test (FIT) of the open hole section indicated that the formation would have been broken down and losses occurred based on calculated equivalent circulating densities (ECDs) if the cement slurry had been pumped in a single-stage to achieve the operator's top-of-cement goal. As a solution to this problem, cementing was performed in stages, using specialty tools. However, during these operations, the stage tool did not work properly, wasting rig time and resulting in unsuccessful cement placement. To overcome this issue, the operator decided to cement the section in a single stage, preceded by a novel aqueous spacer system that aids in strengthening weak formations and controlling circulation losses. Before the operation, laboratory testing was conducted to ensure the spacer system's performance in weak, porous formations and better understand its mechanism. This paper will outline the laboratory testing, modeling and engineering design that preceded this successful single stage cementing job in a horizontal wellbore, with a final ECD calculated to be 0.12 g/cm3 (1.00 lb/gal) higher than the FIT-estimated figure.


2007 ◽  
Author(s):  
Kevin S. Whaley ◽  
Colin John Price-Smith ◽  
Allan Jeffery Twynam ◽  
Phillip John Jackson

2016 ◽  
Author(s):  
D. Staltari ◽  
J. Urdaneta ◽  
O. Barradas ◽  
D. Pellicano’ ◽  
G. Ripa ◽  
...  
Keyword(s):  

2017 ◽  
Vol 32 (02) ◽  
pp. 079-085 ◽  
Author(s):  
Daniele Staltari ◽  
Jose Urdaneta ◽  
Orlanda De Azevedo ◽  
Dario Pellicanò ◽  
Giuseppe Ripa ◽  
...  
Keyword(s):  

2016 ◽  
Author(s):  
I. Martinez-Zuazo ◽  
M. Fernandez ◽  
A. Medina ◽  
C. J. Segnini-Rodriguez ◽  
J. Atienza ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document