scholarly journals Gas field development projects of Nippon Oil Exploration.

2001 ◽  
Vol 66 (2) ◽  
pp. 141-150
Author(s):  
Nobuyuki Sakata
1976 ◽  
Vol 16 (1) ◽  
pp. 107
Author(s):  
M. A. Delbaere

Oilfield operators have always looked for ways of reducing the costs of oil and gas development projects and especially when investment costs were critical to project economics. Tubingless completions have evolved over the last 30 years in North America to fill the need for reduced investment costs particularly in the case of fields with either limited reserves or limited profitability.Tubingless completions basically utilise small diameter tubulars to function as both production casing and flowstring. The tubulars are cemented in the borehole, not to be removed or recovered until the field is depleted and/or the well abandoned. The technique is limited in application to those fields with no corrosion or wax or hydrate problems and with a limited requirement for reservoir stimulation and workovers. The greater the number of operations performed within the tubingless well bore the greater the risk of losing the well.The main benefits of tubingless completions are as follows:Reduction in development well completion costs.Marginally productive hydrocarbon zones can be completed and tested.Completion of individual gas zones of multi-pay wells within their own permanently segregated flowstrings at much lower capital and operating costs.The experience this far with Kincora gas field development wells indicates the tubingless completion method to be completely feasible for gas wells drilled in the Surat Basin and possibly in other areas of Australia.


2017 ◽  
Author(s):  
Herminio Passalacqua ◽  
Jose Luis Ortiz Volcan ◽  
Mohamad Hasan Al Einawi ◽  
Jamaneh Mostafa Kadnaji ◽  
Fatemah Karam

2015 ◽  
Vol 737 ◽  
pp. 843-845 ◽  
Author(s):  
Jia Ming Li

the risk assessment for development project is simply and highly efficient, requires less data, and can clearly uncover the problems. It is plausible to evaluate a plenty of development projects through computers


2013 ◽  
Vol 734-737 ◽  
pp. 1286-1289 ◽  
Author(s):  
Lin Cong ◽  
Wen Long Li ◽  
Jing Chao Lei ◽  
Ru Bin Li

Internationally the research of low permeability oil reservoir is a difficult point in the exploration and development of oil and gas field. This thesis, based on the research methods of low permeability reservoirs at home and abroad, summaries several major problems encountered in the process of low permeability oil exploration and development under the current technical conditions as well as the corresponding, but more effective technical measures that need to be constantly improved. And that exploration and development of low permeability of the reservoir will be the main battle field for some time in the future of oil exploration and development.


Sign in / Sign up

Export Citation Format

Share Document