A Review of the Impact of the Use of Formate Brines on the Economics of Deep Gas Field Development Projects

Author(s):  
John David Downs
1976 ◽  
Vol 16 (1) ◽  
pp. 107
Author(s):  
M. A. Delbaere

Oilfield operators have always looked for ways of reducing the costs of oil and gas development projects and especially when investment costs were critical to project economics. Tubingless completions have evolved over the last 30 years in North America to fill the need for reduced investment costs particularly in the case of fields with either limited reserves or limited profitability.Tubingless completions basically utilise small diameter tubulars to function as both production casing and flowstring. The tubulars are cemented in the borehole, not to be removed or recovered until the field is depleted and/or the well abandoned. The technique is limited in application to those fields with no corrosion or wax or hydrate problems and with a limited requirement for reservoir stimulation and workovers. The greater the number of operations performed within the tubingless well bore the greater the risk of losing the well.The main benefits of tubingless completions are as follows:Reduction in development well completion costs.Marginally productive hydrocarbon zones can be completed and tested.Completion of individual gas zones of multi-pay wells within their own permanently segregated flowstrings at much lower capital and operating costs.The experience this far with Kincora gas field development wells indicates the tubingless completion method to be completely feasible for gas wells drilled in the Surat Basin and possibly in other areas of Australia.


2021 ◽  
Author(s):  
Yuan Liu ◽  
Bin Li ◽  
Hongjie Zhang ◽  
Fan Yang ◽  
Guan Wang ◽  
...  

Abstract The economics of tight gas fields highly depend on the consistency between expected production and the actual well performance. A mismatch between the reservoir quality and the well production often leads to a review of the individual well. However, such mismatch may vary from case to case, and it is hard to perform a field-level analysis based on individual well reviews. We introduce a new method based on data mining to assist the field-level diagnosis. LX gas field is located the in eastern Ordos basin. Compared to the main gas field in the center of the basin, LX field is less predictable in well performance. This predictability issue hinders field development in LX field because the field economics are substantially jeopardized by the inconsistency between the reservoir quality and the production performance. The traditional workflow to understand this issue at the field level is to review the details of a large number of individual wells in the area. This is typically an intense task, and too much detail from multiple disciplines may hide the true pattern of the field behavior. To resolve this issue, we applied data mining in our field development diagnosis workflow. Our new workflow in LX area started with the existing field datasheet, including logging summaries, completion treatment reports, and flowback testing datasheets. With the data extracted from these different sources, we visualized the consolidated information in various plots and graphs based on regression analysis, which revealed the relation between flowback ratio and the production, the flowback rate consistency from the different service suppliers, and the impact of water productions. The data mining approach helped to generate new understandings in LX gas field. With the in-depth analysis of the flowback data together with reservoir properties and operation parameters, the key problems in the field were identified for further development optimization, and the field economics can be significantly improved. The diagnosis method can be easily adapted and applied to any field with similar problems, and data mining can be useful for almost all large-scale field development optimizations.


2017 ◽  
Author(s):  
Herminio Passalacqua ◽  
Jose Luis Ortiz Volcan ◽  
Mohamad Hasan Al Einawi ◽  
Jamaneh Mostafa Kadnaji ◽  
Fatemah Karam

2015 ◽  
Vol 737 ◽  
pp. 843-845 ◽  
Author(s):  
Jia Ming Li

the risk assessment for development project is simply and highly efficient, requires less data, and can clearly uncover the problems. It is plausible to evaluate a plenty of development projects through computers


Sign in / Sign up

Export Citation Format

Share Document