scholarly journals Effects of Using New Mold and Modified Secondary Cooling Scenario on Continuous Casting Process at a Steel Plant in Turkey

2020 ◽  
pp. 1-1
Author(s):  
Emin ÇELİK ◽  
Demet ZALAOĞLU ◽  
Emre ÖZER
2016 ◽  
Vol 35 (6) ◽  
pp. 583-589 ◽  
Author(s):  
Xiangzhou Gao ◽  
Shufeng Yang ◽  
Jingshe Li ◽  
Hang Liao

AbstractTo improve the center segregation of billet for 50CrMo structural alloy steel, a 3D numerical model of solidification and heat transfer process for continuous casting had been established. The influence law of continuous casting process parameters on the secondary dendrite arm spacing (SDAS) and equiaxed crystal ratio had been obtained. It was shown that reducing superheat and casting speed and increasing the secondary cooling intensity could decrease SDAS. Reducing any one of the three parameters could increase the equiaxed crystal ratio. Adjusting only secondary cooling intensity could not make the SDAS and equiaxed crystal ratio change in the desired direction, but regulating the other two parameters could supply this gap. After optimizing the continuous casting process parameters of 50CrMo billet, the defect of center segregation was solved basically.


2021 ◽  
Vol 11 (15) ◽  
pp. 6765
Author(s):  
David García-Menéndez ◽  
Henar Morán-Palacios ◽  
Eliseo P. Vergara-González ◽  
Vicente Rodríguez-Montequín

During the steelmaking and continuous casting process in the steel plant, it is common to encounter delays that affect initial planning. Furthermore, continuous casting machines themselves can lose much of their performance in the event of closure of one or more of their casting strands. The situation that is generated, far from being a planning problem, forces consideration of a vision of cost analysis when deciding changes in the planned sequences. This study presents a detailed analysis of the different circumstances that can cause strands closures or sequence breaks, their consequences and the different options available to minimize losses. Finally, an algorithm capable of analyzing the workshop situation and making the most favorable decision to optimize production is proposed, analyzed and compared with the efficiency of the original scheduling method in a real steel plant. The new algorithm proves its efficiency in all situations, with a time-saving average of 26.41 min per decision taken.


2014 ◽  
Vol 998-999 ◽  
pp. 650-653
Author(s):  
Jin Hong Zhang ◽  
Jun Li Jia ◽  
Guo Zhen Wang

In the continuous casting production casting speed and casting temperature fluctuates frequently, the secondary cooling control of slab surface temperature fluctuation is too big problem, proposes a radical.The utility of the pulling speed cascade water distribution control method, a kind of development.secondary cooling control model for slab continuous casting.