Determination of volume of water and water level in lakes and reservoirs

2008 ◽  
2017 ◽  
Vol 16 (4) ◽  
pp. 298-303
Author(s):  
E. I. Mikhnevich

Territory protection against flood water inundation and creation of polder systems are carried out with the help of protection dikes. One of the main requirements to the composition of polder systems in flood plains is a location of border dikes beyond meander belt in order to avoid their erosion when meander development occurs. Meander belt width can be determined on the basis of the analysis of multi-year land surveying pertaining top river-bed building and in the case when such data is not available this parameter is calculated in accordance with the Snishchenko formula. While banking-up a river bed a flooded area is decreasing and, consequently, water level in inter-dike space and rate of flood water are significantly increasing. For this reason it is necessary to locate dikes at a such distance from a river bed which will not cause rather high increase in water level and flow velocity in the inter-dike space. Methodology for hydraulic calculation of river regulation has been developed in order to substantiate design parameters for levee systems, creation of favourable hydraulic regime in these systems and provision of sustainability for dikes. Its main elements are calculations of pass-through capacity of the leveed channel and rise of water level in inter-dike space, and distance between dikes and their crest level. Peculiar feature of the proposed calculated formulae is an interaction consideration of channel and inundated flows. Their mass-exchanging process results in slowing-down of the channel flow and acceleration of the inundated flow. This occurrence is taken into account and coefficients of kinematic efficiency are introduced to the elements of water flow rate in the river channel and flood plain, respectively. The adduced dependencies for determination of a dike crest level (consequently their height) take into consideration a rise of water level in inter-dike space for two types of polder systems: non-inundable (winter) dikes with maximum spring flood rate and inundable (summer) dikes with summer-autumn flood rates. The proposed calculated formulae can be recommended for application at design organizations.


Author(s):  
Dariusz Popielarczyk

The paper presents analysis of determination of vertical movement of the surveying boat called “heave” with the use of Robotized Total Station (RTS) technique. The classical geodetic Total Station was used for sub-centimeter calculation of water level changes during hydroacoustic measurements on the fragment of Vistula river behind the dam and hydropower in Włocławek in Poland. The power station work causes up to 1.7 m movement of vertical reference water surface in aspect of local bathymetric survey. The experimental, hydrographic surveys on the river were conducted where the water level was changing significantly over time depending on the operational schedule of the power plant. Verified hydrographic data had to be brought to the common water level. To determine the final water level, data on the height of the Robotized Total Station prism positioned on the boat during sounding was considered. The RTS technique with 0.02–0.05 m vertical accuracy proved to be very useful and essential in engineering inland bathymetric measurements.


2004 ◽  
Vol 47 (2) ◽  
pp. 281-290 ◽  
Author(s):  
Anderson Medeiros dos Santos ◽  
Francisco de Assis Esteves

The goal of this study was to study the biometric alterations of Eleocharis interstincta in response to water level fluctuations in Cabiúnas Lagoon, located on the northern coast of the state of Rio de Janeiro, in the municipality of Macaé. Three quadrats of 0.0625 m² were harvested every two weeks from June/1997 to June/1998; samples were separated into stems, dead stems (detritus) and rhizome; lenghted, dried and weighted. The water level fluctuated seasonally in the macrophyte stand with two periods of drawdown. The first period occurred naturally at the end of winter and beginning of spring, when rainfall in the area was normally lowest. The second period of drawdown was the result of an artificial breaching of the sandbar that isolate the lagoon from the sea. The breach was made in the summer, at the time of highest rainfall, when the water level in the lagoon reached the maximum value recorded during the study (1.35 m). There was a strongly positive correlation of the water level with stems mean height and aboveground biomass, indicating that water level played an important role in the determination of these parameters. There was a significant difference between stem height (ANOVA; p < 0.001) and biomass (ANOVA; p < 0.001) in each sampling period, ranging from 143.9 cm and 338.8 g dry wt.m-2, before the sandbar opening, to 16.3 cm and 20.2 g dry wt.m-2 respectively after the sandbar breaching. The drastic variation of the water level, leading mass mortality of the stems, together with the lowest mean biomass/stem (0.057 g dry wt.individual-1), recorded after the sandbar breaching, did not represent a strong disturbance for E. interstincta, since the resilience time estimated for this population was about 30 days.


2008 ◽  
Vol 8 (1) ◽  
pp. 53-60 ◽  
Author(s):  
Wiesław Galor

Determination of Dynamic Under Keel Clearance of Maneuvering Ship The safety of navigation of a ship manoeuvring within port waters mainly depends on its under keel clearance (UKC). Mainly UKC depends on water level change, squatting of moving ship and heeling and wave response. The effect of these components will be determined currently than such UKC is called as dynamic under keel clearance. The paper presents an analysis of certain components of UKC to maximise of ship draft and thus to achieve the economic benefit to port and ships owner.


2013 ◽  
Vol 448-453 ◽  
pp. 3989-3992
Author(s):  
Xue Jiang ◽  
Xiu Juan Liang ◽  
Chang Lai Xiao ◽  
Chuan Du ◽  
Zhong Kai Wang

When the buried depth of water level is very large, the air compressor is used in pumping test. In the limited conditions, the value of the water level was not measured, but the recovery value of water level could be measured. In this case, the sp value of the water level drawdown was not able to be measured accurately when the pumping test stopped. So the hydraulic conductivity of aquifer could only be determined according to the linear graphic method of the water level recovery test. However, water level recovery characteristics of each period were not the same, and the raising rate of water level were not equal. Thus, there was a deviation when the hydraulic conductivity was solved with the linear graphic method. According to the existing data, the thesis combined the water level recovery fitting of the entire curve fitting with Dupuit formula of artesian well, determining the sp value and hydrogeological parameters of aquifer. After comprehensive analysis, the parameters obtained are more reasonable, which can provide a good reference for in-situ mining of oil shale in this area.


Sign in / Sign up

Export Citation Format

Share Document