scholarly journals A Stop-Probability Approach for O-D Service Frequency on High-Speed Railway Lines

2019 ◽  
Vol 11 (24) ◽  
pp. 6996
Author(s):  
Shuo Zhao ◽  
Xiwei Mi ◽  
Zhenyi Li

Train stop planning provides appropriate service for travel demand and stations and plays a significant role in railway operation. This paper formulates stop planning from the point of view of direct travel between origin-destination (O-D) stations and proposes an analytical method to theoretically derive optimal service frequencies for O-D demand on different levels. Considering different O-D demand characteristics and train service types, we introduce the concept of stop probability to present the mathematical formulation for stop planning with the objective of minimizing per capita travel time, which is solved by an iterative algorithm combined with local search. The resulting optimal stop probabilities can be used to calculate the required service frequency for each train type serving different demand categories. Numerical examples, based on three real-life high-speed railway lines, demonstrate the validity of the proposed method. The proposed approach provides a more flexible and practical way for stop planning that explicitly takes into account the importance of different stations and passenger travel characteristics.

2020 ◽  
Vol 146 (10) ◽  
pp. 04020109
Author(s):  
Qing Wang ◽  
Lianbo Deng ◽  
Yuxin Chen ◽  
Wenliang Zhou ◽  
Feng Niu

2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Qin Zhang ◽  
Xiaoning Zhu ◽  
Li Wang ◽  
Shuai Wang

The optimization problems of train timetabling and platforming are two crucial problems in high-speed railway operation; these problems are typically considered sequentially and independently. With the construction of high-speed railways, an increasing number of interactions between trains on multiple lines have led to resource assignment difficulties at hub stations. To coordinate station resources for multiline train timetables, this study fully considered the resources of track segments, station throat areas, and platforms to design a three-part space-time (TPST) framework from a mesoscopic perspective to generate a train timetable and station track assignment simultaneously. A 0-1 integer programming model is proposed, whose objective is to minimize the total weighted train running costs. The construction of a set of incompatible vertexes and links facilitates the expression of difficult constraints. Finally, example results verify the validity and practicability of our proposed method, which can generate conflict-free train timetables with a station track allocation plan for multiple railway lines at the same time.


Author(s):  
L. Nie ◽  
D. B. Fei ◽  
S. D. Zhou ◽  
H. L. Fu ◽  
L. Tong

The Beijing-Shanghai High speed railway line (Hereinafter referred to as “Jing-Hu HSL”) is one of the most important railway lines in the Chinese rapid passenger transportation network and will be put into operation at the end of 2011. Train line planning directly reflects the quality and competition ability of train services. The characteristics of operational conditions and passenger flow of this corridor HSL bring about a few new issues on train line planning like night train operation, train OD sets, cyclic operation, and train stop schedule. For the first issue, a large amount of long distance travel demand put forward the demand for night services, which causes great conflict with the time-window for maintenance work. The confliction can be solved by harmoniously utilizing the parallel lines. For the second one, in view of the differences of technical and economic factors between HSL and conventional railways, high frequency and medium-long distance train will dominate HSL’s train service plan rather than low frequency and long distance trains on conventional railways. Thus, part of long-distance passenger flow has to transfer at some stations. Considering the whole possible ODs over Jing-Hu HSL and the transfer condition of related stations, the optimal OD sets and corresponding transfer plan is suggested. High frequency makes HSL possible to operate trains cyclically to improve service quality. However, with too many train ODs and some special trains, e.g. night train, an incomplete cyclic train operation mode is more practical. The ODs which can provide cyclic service for Jing-Hu HSL need to be identified. For the last issue, although non-stop long-distance train is a very popular kind of service in China, it should be reconsidered for Jing-Hu HSL line because of massive intercity travel demand and regular stops required. Each of the above issues is very complex. What is more, they have close relationship between each other. Due to limited space, the methods used to solve these issues are given in conceptual way rather than detailed description of mathematical model. The research paves the way for future integration study to design an efficient, economic, convenient, and regular train service plan for Jing-Hu HSL.


2014 ◽  
Vol 2014 ◽  
pp. 1-10 ◽  
Author(s):  
Qizhou Hu ◽  
Ningbo Gao ◽  
Bing Zhang

In order to rationally evaluate the high speed railway operation safety level, the environmental safety evaluation index system of high speed railway should be well established by means of analyzing the impact mechanism of severe weather such as raining, thundering, lightning, earthquake, winding, and snowing. In addition to that, the attribute recognition will be identified to determine the similarity between samples and their corresponding attribute classes on the multidimensional space, which is on the basis of the Mahalanobis distance measurement function in terms of Mahalanobis distance with the characteristics of noncorrelation and nondimensionless influence. On top of the assumption, the high speed railway of China environment safety situation will be well elaborated by the suggested methods. The results from the detailed analysis show that the evaluation is basically matched up with the actual situation and could lay a scientific foundation for the high speed railway operation safety.


2012 ◽  
Vol 253-255 ◽  
pp. 1235-1240
Author(s):  
Hua Li ◽  
Bao Ming Han ◽  
Fang Lu ◽  
Xiao Juan Li

Train-set circulation problem is an important issue in operations of high-speed passenger trains in the world. On the basis of characteristics of the train-set circulation problem in China, an integer programming model is presented without considering distinct train-set types. With redefinitions of some basic mathematical objects and operations, an improved particle swarm optimization algorithm is proposed to solve the model. The algorithm is applied in a real-life case study based on the timetable of the Wuhan-Guangzhou High-speed Railway Line. The results show that the proposed algorithm is effective to find the optimized train-set circulation plan.


2014 ◽  
Vol 505-506 ◽  
pp. 489-492 ◽  
Author(s):  
Peng Fei Zhou ◽  
Bao Ming Han ◽  
Qi Zhang

High-speed railway passenger train operation plan is an important basis to ensure the quality of transportation services. With construction and development of the country's high-speed railway, design and evaluation of railway passenger train plan theory need to be improved and perfected. On the basis of reading and studying a large amount of the references, this paper summarizes the domestic and overseas high-speed running railway operation modes, the high speed railway train operation programs design and other aspects. Besides, according to the related problems and shortcomings, this paper illustrates the meanings and necessities of analyzing the high-speed railway passenger train program.


Sign in / Sign up

Export Citation Format

Share Document