scholarly journals Challenges for Integrating Strategic Environmental Assessment to Enhance Environmental Thinking: A Case Study of Taiwan Energy Policy

2019 ◽  
Vol 11 (3) ◽  
pp. 609 ◽  
Author(s):  
Yen-Yu Wu ◽  
Hwong-Wen Ma

There is an increasing need to evaluate environmental impacts at higher policy planning levels, especially after the European Union (EU) strategic environmental assessment (SEA) directive proposed in 2001. However, integrating SEA and policy planning processes is challenging owing to institutional challenges and/or political problems. We aimed to explore the challenges of this integration process through in-depth interviews with core stakeholders in Taiwan energy policy making. Our results reveal three main types of challenge related to policy planning, SEA implementation, and difficulties in dealing with environmental issues. The first includes the policy planning model, transparency in the policy planning process, and controversial issues clarification; the second includes the different types of SEA purposes, unclear feedback on policy planning, and public participation limitation; the third includes a lack of knowledge of brokerage processes, scientific uncertainty, the role of the Taiwan EPA (TEPA) for environmental thinking, and the influence of local information in policy planning. The results of this study can be applied to countries that use impact-oriented SEA (currently the most common type of SEA) and consider environmental issues during the energy policy planning process.

2012 ◽  
Vol 178-181 ◽  
pp. 820-824
Author(s):  
Li Li Tian ◽  
Ya Fei Zhao

Some strategic environmental assessment (SEA) pilot cases in China strive to integrate environmental issues into the planning from the beginning. One of them is the SEA for development strategy of Tianjin Binhai New Area. The SEA adopted an interactive assessment mode with the decision-making process and predicted the environmental impacts of the development strategy on land resource, water resource, energy, surface water, atmospheric environment, and ecosystem of land area and offshore area. The future development strategy of circular economy and low-carbon economy in Tianjin Binhai New Area was also analyzed. Finally, experience from the SEA case was discussed. The case study shows that support from non-environmental agencies, early integration of SEA process and planning process, interactive assessment mode, and sensible environmental protection strategy facilitate the integration of environment into decision-making.


2009 ◽  
Vol 11 (01) ◽  
pp. 1-28 ◽  
Author(s):  
TARJA SÖDERMAN ◽  
TUOMAS KALLIO

Experiences from the Finnish Strategic Environmental Assessment (SEA) Act were studied by surveying 35 SEA processes. Integration of plan or programme preparation and assessment, organisation of assessment, public participation and consultation, treatment of alternatives, scoping, impact assessment methods, effectiveness, environmental reporting, follow-up, effects on plan or programme preparation, assessment costs and consistency of the assessment were examined and evaluated. The results suggest that SEA is not yet used properly in decision-making. Several shortcomings characterised assessment practices in public participation, establishment and comparison of alternatives, definition of environmental problems, recognition of significant impacts and readiness to use SEA as a planning tool to integrate environmental considerations into the planning. In consequence, the assessments had only minor effects on the adopted plans and programmes. The most critical challenges in Finnish SEA practise are focusing on the most significant environmental issues and strengthening the links between planning, participation and decision-making.


2017 ◽  
Vol 2017 ◽  
pp. 1-13 ◽  
Author(s):  
Jeffrey B. Kucharski ◽  
Hironobu Unesaki

This study is a review and analysis of the Japanese government’s 2014 Strategic Energy Plan (SEP). As the first plan to be issued after the Fukushima disaster of March 2011, the 2014 plan incorporates policies that represent the most comprehensive and systematic changes ever proposed for Japan’s energy system. The study reviews the key elements of the plan, employing a framework that explains the nature and magnitude of the changes planned for Japan’s energy system and related institutions. The analysis demonstrates that the shock of the triple disaster opened up a window of opportunity in Japan’s policy environment for a fundamental change in energy policy, allowing for major reforms to the energy industrial structure and energy institutions. A unique aspect of this study is that it draws upon in-person interviews conducted with key government officials who were directly involved in the formulation of the SEP, providing new insights into Japan’s energy policy planning process and the drivers behind the planned reforms. Given the nature and magnitude of the potential changes implied in the SEP, this paper concludes that the 2014 SEP is best understood as a comprehensive blueprint toward a major planned transition of the Japanese energy system.


Energies ◽  
2021 ◽  
Vol 14 (19) ◽  
pp. 6174
Author(s):  
Boško D. Josimović ◽  
Aleksandar Cvjetić ◽  
Božidar Manić

Determining the spatial position of wind turbines is the initial and most important phase in the development of a wind farm project. In this sensitive phase, all potential problems that may arise in the later stages of project development should be prevented by means of spatial and urban planning instruments. This makes it possible to achieve maximum use of the potential of wind in a particular space and, thus, fulfil the technical and economic requirements of the project while respecting the goals of environmental protection in that same area, through preventive protection. Therefore, it is essential, even at the earliest planning and development stage of a wind farm project, for the requirements that are important for optimal spatial solutions to be balanced. In this process, strategic environmental assessment (SEA) is a support to the planning process and an invaluable instrument for finding optimal spatial solutions for the possible key spatial impacts of wind power with regard to noise, shadow flicker, ornithofauna and chiropterofauna. The weakness of SEA can be seen in its predominant application of expert qualitative methods that bring with them subjectivity, since they depend on expert knowledge and skills. This paper presents the aspect of noise impact assessment and its inclusion in the SEA for the Maestrale Ring wind farm in Serbia. The results of the research indicate how it is possible to achieve the principle of objectivity in the process of multicriteria expert evaluation by including the results of a partial impact assessment of the noise from wind farms, using results obtained from software modeling of the spatial dispersion of wind turbine noise in the SoundPlan 8.1 software package in the SEA process. These quantitative results predicting the noise level were used in a semi-quantitative method of multicriteria evaluation in the SEA through the definition of criteria to determine the ranking of impacts, which is elaborated in the paper. The results also show the significant of the contribution of applying a methodological approach based on a combination of qualitative and quantitative evaluation methods in SEA. These methods positively affect the application of the principle of preventive protection through the optimal selection of the number and position of wind turbines on one hand and the objectivity of drawing conclusions based on which strategic decisions are made in the final phase of the SEA process, on the other.


Author(s):  
Prince T. Mabey ◽  
Wei Li ◽  
Abu J. Sundufu ◽  
Akhtar H. Lashari

Strategic Environmental Assessment (SEA) is a proactive and collaborative method for environmental management designed to integrate environmental considerations into decision-making; and it is good for Sierra Leone. To understand whether SEA would be useful in the context of Sierra Leone, the authors interviewed 64 out of 78 experts face to face from March to July 2019. In addition, government policies and regulatory documents on environmental management and sustainable development, published articles served as secondary sources of data. Data were analyzed using descriptive statistics. These Sierra Leonean experts agreed that SEA would be useful for integration and achievement of improved sustainable urban planning strategies. However, the barriers identified to integrating SEA include: not addressing environmental issues during the preparation of policies and programs, insufficient political will, the absence of clear objectives, targets, principles and approaches, overlapping mandates among environmental institutions, and inadequate institutional coordination and non-integrated development framework as barriers to integrating SEA into their work. The study shows that SEA has the potential to have a positive impact on environmental concerns in decision-making, but it would need to be supported by stronger political will, legal frameworks, and improved technical guidance from the policy perspective. Moreover, we propose a conceptual framework for the inclusion of SEA into the urban planning process in Sierra Leone.


Spatium ◽  
2004 ◽  
pp. 35-40
Author(s):  
Tijana Crncevic

In July 2001, the European Union (EU) adopted the Directive 2001/42/EC of the European Parliament and the Council of 27 June 2001 on the Assessment of the Effects of Certain Plans and Programmes on the Environment, known as the Strategic Environmental Assessment (SEA) Directive. The EU countries will have three years, until July 2004, for the integration of the SEA Directive into national laws. The SEA Directive introduces procedural and technical requirements, according to which environmental assessment is compulsory for certain plans and programs but not for policies, except if they are a part of a plan, as well for plans and programs of national defence, civil emergencies, finance and budgets. According to the scope of the SEA Directive, environmental assessment is compulsory for plans and programs for infrastructure corridors ? transport, telecommunication and energy systems. In addition to the overview of the general framework for Strategic Environmental Assessment and the main requirements of the SEA Directive, the current situation in Serbia regarding the present condition of SEA is presented with special reference to the infrastructure corridors. One of the conclusions of this paper is that the main limitation for the implementation of SEA for plans and programs covering infrastructure corridors is the current legal situation. The main law which is supposed to introduce SEA has not been adopted yet, while the scope of the SEA within the new Planning and Construction Act includes SEA only for urban plans and does not cover, among others, plans for infrastructure corridors.


2019 ◽  
Vol 21 (01) ◽  
pp. 1950001 ◽  
Author(s):  
Rosa Santos Coelho ◽  
Pedro S. Coelho ◽  
Paula Antunes ◽  
Tomás B. Ramos

Water resources planning is currently designed to meet emerging challenges and encompassing a more comprehensive and integrated water management. The main focus of current water resources planning is to promote good water resource conditions through the implementation of innovative water policies. To achieve this goal, it is necessary to characterize and assess the status of water resources, monitor the implementation of planned actions, disseminate information and support the decision-making process. Indicators are often regarded as appropriate tools for supporting these tasks, although their use in this context is not imperative. The present study intends to explore the stakeholder perspective on the role of indicators in the water resources planning and management processes and their strategic environmental assessment process using a Portuguese case study. To achieve this objective, semi-structured interviews with the various stakeholder groups involved were conducted. The treatment of the obtained data using content analysis shows that the interviewees consider indicators to be an essential tool for supporting water resources planning. Some participants express concerns and suggest changes to the selection models and to the communication and decision-support capacity of the sets of indicators used. All stakeholders in the process consider that improvements to the indicators to be used in future processes are possible. In light of the results, it can be concluded that there is a long way to go for indicators to be used to promote better communication with stakeholders and to support decision-making processes; simultaneously, they can form the basis for the review and development of the subsequent cycle of the planning process.


Sign in / Sign up

Export Citation Format

Share Document