scholarly journals Full-Scale Use of Microwave Heating in Construction of Longitudinal Joints and Crack Healing in Asphalt Pavements

Materials ◽  
2021 ◽  
Vol 14 (18) ◽  
pp. 5159
Author(s):  
Maciej Maliszewski ◽  
Adam Zofka ◽  
Dominika Maliszewska ◽  
Dariusz Sybilski ◽  
Bartłomiej Salski ◽  
...  

Asphalt pavement construction technology is an industry branch that undergoes constant development. Analyzing the directions of the development, one can divide it into two mainstreams: the development of roadworks equipment and the development of roadworks technology. Microwave heating technique has been mentioned in the road industry from the early ‘70s, but research records from practical full-scale use are very rare. This article presents the evaluation of the possible use of microwave heating technique during a particular aspect of the construction process, namely, the formation of longitudinal joints and the potential repair process of the cracked asphalt pavement. Research results showed that joints constructed using microwave-assisted heating performed the same or even better with regards to tensile characteristics comparing to other techniques. Also, the highest level of compaction was reached among the other tested techniques applied to the wearing course level. The second part of the research experiment showed the large potential of the microwave crack healing technique. The asphalt pavement was healed on its full depth of 10 cm with the single healing operation applied. Although some limitations may occur in the practical use of microwave heating, the test results suggest that it is a very promising technique and should be further developed (for, e.g., shielding concerns, electricity supply). The microwave heating technique is powered with electricity, which is important when there is a constant need for further reductions of CO2 emissions. It can be reached in parallel with clean energy or clean electricity sources.

2012 ◽  
Vol 238 ◽  
pp. 497-502
Author(s):  
Zhi Dong Guo ◽  
Jia Liu ◽  
Cang Bo Li

Cold recycling technology of old asphalt pavement is a relatively new technology which has important application in the road surface treatment. Combining with the application of the cold recycling technology in rural old asphalt pavement, this paper analyzes and elaborates its construction technology and experience approach. The existing old asphalt pavement material is used in accordance with the new design requirements to form a special pavement structure surface. On rolling forming sections, the test is conducted for compaction, smoothness, bending and sinking and drill-core sampling for compressive strength. The results show that this process meets the general requirements of pavement base, and the quality is good with the advantages of saving costs and reducing waste damaging the environment.


Author(s):  
M. Mongiardini ◽  
J. D. Reid

Numerical simulations allow engineers in roadside safety to investigate the safety of retrofit designs minimizing or, in some cases, avoiding the high costs related to the execution of full-scale experimental tests. This paper describes the numerical investigation made to assess the performance of a roadside safety barrier when relocated behind the break point of a 3H:1V slope, found on a Mechanically Stabilized Earth (MSE) system. A safe barrier relocation in the slope would allow reducing the installation width of the MSE system by an equivalent amount, thus decreasing the overall construction costs. The dynamics of a pick-up truck impacting the relocated barrier and the system deformation were simulated in detail using the explicit non-linear dynamic finite element code LS-DYNA. The model was initially calibrated and subsequently validated against results from a previous full-scale crash test with the barrier placed at the slope break point. After a sensitivity analysis regarding the role of suspension failure and tire deflation on the vehicle stability, the system performance was assessed when it was relocated into the slope. Two different configurations were considered, differing for the height of the rail respect to the road surface and the corresponding post embedment into the soil. Conclusions and recommendations were drawn based on the results obtained from the numerical analysis.


2012 ◽  
Vol 256-259 ◽  
pp. 1748-1753
Author(s):  
Bin Zhao ◽  
Pei Wen Hao

As vehicle flow on arterial highway in Inner Mongolia sharply increased, the originally designed natural increase rate of 8% per year has been exceeded on the vehicle flow in some sections. According to statistics, monthly average vehicle flow on major section of G6 expressway has reached a standard flow of 67478 vehicles per day and night, of which in 70-80% are large ones for coal transportation. Therefore, pavement load and road capacity have exceed the designed expressway load capacity. At present, semi-rigid base asphalt pavement structure is still widely used for high-grade highway pavement in Inner Mongolia. With years of construction for such pavement structure, a great deal of valuable experience has been gained on construction technology. However, there are still a few deficiencies in the quality of raw materials, gradation control of asphalt mixture and adjustment of equipment, etc. Hohhot circle expressway connects with the G6 and G7 expressways, suffering from problems such as large vehicle flow and load overweight. This paper introduced a key technique that should be properly controlled during construction of such pavement structure, emphasized technique control and management of the following aspects, i.e. ballast sizes and gradation control, asphalt concrete mixture, adjustment of pavers, validation of mixing proportion in production and reasonable arrangement of process, and summarized corresponding technical measures taken during construction of asphalt pavement in this project.


2011 ◽  
Vol 194-196 ◽  
pp. 1632-1638
Author(s):  
Hong Liang Deng ◽  
Xiao Yin Fu ◽  
Wen Xue Gao ◽  
Ting Ting Ni ◽  
Kai Jiang Chen

The methods of controlling Highway semi-rigid base asphalt pavement cracks and other diseases are always hot fields of road engineering and academic circles. The existing methods are on some degree efficient on delaying the formation and extension of cracks, but the effect is limited with different methods and various mechanisms of preventing cracks. Base on force analysis of pavement, this article presents a new technology of crack controlling which uses intelligent composite materials interlayer. By adding a stress absorbing layer between the asphalt surface layers or the semi-rigid base layers with low modulus, good toughness, self-adaptability and self-control ability, the intelligent composite materials interlayer has a good effect on controlling cracks which has been proved by the theoretical calculations and experimental analysis. As a result, the intelligent composite materials interlayer could efficiently prevent and delay the formation and extension of cracks, the safety and comfort of highway could be improved significantly while the cost of construction and maintenance decreasing. And the service level and social image of the road could also be improved effectively. This research has important academic and application value.


2008 ◽  
Vol 31 (1) ◽  
pp. 53-62
Author(s):  
D.A. Mfinanga ◽  
H. Bwire

High-type roads in Tanzania have been predominantly of asphaltic concrete construction. This ever enlarging and ageing asphaltic road network represents increasing resource requirements on the road agency in the form of maintenance. Limited resources coupled with the ever sky-rocketing costs of petroleum products and the competing demands of social economic developments, presupposes the need to look for alternative road construction technology that is more cost-effective and resource optimising. Experience gained from developed and some developing countries where concrete pavements have been widely used suggests the potential of this type of pavement in many developingcountries. This paper discusses the technical aspects of design and construction- and maintenance-related aspects of concrete pavements. The discussion extends further to highlight issues pertaining to the performance of concrete pavements and strategies for promoting the use of concrete pavements in Tanzania. Conclusions and recommendationsare made with suggestions on how to start implementing the proposed strategies.


2018 ◽  
Vol 2018 ◽  
pp. 1-7 ◽  
Author(s):  
Dongliang He ◽  
Weijun Yang

This study uses a test section of a highway, a study object, to explore the effect of thickness of the gravel base and asphalt layer on the vertical deformation of the road surface. The thickness of the asphalt layer and graded gravel base is changed. The nonlinear description equation of the relationship between the thickness (h1) of the asphalt layer and the vertical deformation (d1) is established: d1=a41−b4h1. The thickness of the asphalt pavement is then determined to reduce vertical deformation. Numerical calculation shows that the maximum vertical deformation of the foundation is within 8 mm, which is less than the 15 mm maximum vertical deformation of the embankment. This level meets the design requirements.


2013 ◽  
Vol 723 ◽  
pp. 157-162
Author(s):  
Jian Li ◽  
Qu Chao ◽  
He Ping

Under normal atmospheric pressure conditions, volume suddenly increases about 11% when the water freezes and decreased when the ice melts. The pressure can reach up to 2500 times of atmospheric pressure in the closed space when the water freezing. This is a very important characteristic of the natural world and the industrial. In low temperature condition, the snow on the pavement is easy to melt and freeze, and it will affect the road safety, increase the cracking of the road and accelerate asphalt pavement water damage. Bitumen is a mixture consisting of some extremely complex polymer hydrocarbons and hydrocarbon derivatives of non-metallic (oxygen, sulfur, nitrogen). Deicing salt is used to prevent freezing in that area, chloride salt is its main ingredient. When the water melting point reduced, it is not easy to icing but to penetrate the asphalt pavement. If the temperature is continued to reduce, salt solution will still freezing. At last, the pavement will form water damage in repeated freeze-thaw cycles conditions.


2012 ◽  
Vol 204-208 ◽  
pp. 1857-1863
Author(s):  
Min Jiang Zhang ◽  
Wen Bo Zhang ◽  
Bao Yang Yu

Based on the theory of hierarchy analysis, the post-assessment indexes system of cold recycling technology project have been established, and the hierarchy analytic procedure have been used to determine the weighing coefficients for post-assessment indexes of cold recycling engineering of asphalt pavement, and the weighing values for various levels factors were given for the cold recycling base layer project of highway of Shenyang-Yingkou. Considering the road performance and economic benefit, societal and environmental benefit, the analytic hierarchy procedure (AHP) method can effectively avoid making wrong decisions subjectively and made it more scientific and reasonable to determine the weighing values of post-assessment indexes, and it is an effective method to determine the weighing values for post-assessment indexes of the cold recycling technology project.


Sign in / Sign up

Export Citation Format

Share Document