scholarly journals Late Acceptance Hill-Climbing Matheuristic for the General Lot Sizing and Scheduling Problem with Rich Constraints

Algorithms ◽  
2020 ◽  
Vol 13 (6) ◽  
pp. 138 ◽  
Author(s):  
Andreas Goerler ◽  
Eduardo Lalla-Ruiz ◽  
Stefan Voß

This paper considers the general lot sizing and scheduling problem with rich constraints exemplified by means of rework and lifetime constraints for defective items (GLSP-RP), which finds numerous applications in industrial settings, for example, the food processing industry and the pharmaceutical industry. To address this problem, we propose the Late Acceptance Hill-climbing Matheuristic (LAHCM) as a novel solution framework that exploits and integrates the late acceptance hill climbing algorithm and exact approaches for speeding up the solution process in comparison to solving the problem by means of a general solver. The computational results show the benefits of incorporating exact approaches within the LAHCM template leading to high-quality solutions within short computational times.

2018 ◽  
Vol 145 ◽  
pp. 197-206 ◽  
Author(s):  
Asaju La’aro Bolaji ◽  
Akeem Femi Bamigbola ◽  
Peter Bamidele Shola

2020 ◽  
Vol 284 (3) ◽  
pp. 861-873 ◽  
Author(s):  
Yasmín Á Ríos-Solís ◽  
Omar J. Ibarra-Rojas ◽  
Marta Cabo ◽  
Edgar Possani

Sign in / Sign up

Export Citation Format

Share Document