A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
2015 ◽
Vol 63
◽
pp. 72-82
◽
2010 ◽
Vol 54
(9-12)
◽
pp. 1109-1119
◽
2018 ◽
Vol 16
(6)
◽
pp. 1715-1722
◽
2011 ◽
Vol 211
(3)
◽
pp. 612-622
◽
2016 ◽
Vol 98
◽
pp. 40-52
◽
2009 ◽
Vol 42
(4)
◽
pp. 792-797
◽
2014 ◽
Vol 52
(8)
◽
pp. 2490-2503
◽