Collaborative Project Management Methodology Between Major Stakeholders — A Key Success Factor

Author(s):  
P. Ghose
2020 ◽  
Vol 13 (5) ◽  
pp. 999-1023
Author(s):  
Laura Saukko ◽  
Kirsi Aaltonen ◽  
Harri Haapasalo

PurposeThe purpose of this paper is to achieve an understanding of the challenges and preconditions for inter-organizational collaborative project practices in industrial engineering projects. A framework for identifying the challenges and preconditions for inter-organizational collaboration is presented.Design/methodology/approachThe adopted research method is qualitative, and empirical data were collected from the industrial engineering project sector in Finland. The literature related to industrial engineering projects and inter-organizational collaborative project management practices is summarized, informing the qualitative design of the study.FindingsBy analyzing empirical data from industrial engineering projects, the challenges for inter-organizational collaboration are identified in each industrial engineering project stage. A framework of preconditions for inter-organizational collaboration is identified, in which investors are advised to pay attention when deciding on the use of collaborative project management methods.Practical implicationsThe findings of this study help practitioners deal effectively with mechanisms aimed at fostering and hindering inter-organizational collaborative practices. The identified preconditions for inter-organizational collaboration provide support for decision-making in every phase of an engineering project and can be used as guidelines throughout the process.Originality/valueInter-organizational collaborative project management practices have recently been attracting attention in the industrial engineering project setting. This research is an attempt to identify the underlying forces supporting and preventing inter-organizational collaboration in industrial engineering projects. This study offers a framework that can help academics and project management practitioners deal with the challenges affecting inter-organizational collaboration at each project stage and consider preconditions for inter-organizational collaboration in industrial engineering project settings.


2008 ◽  
Vol 16 (4) ◽  
pp. 253-261 ◽  
Author(s):  
X.H. Wang ◽  
X.G. Ming ◽  
F.B. Kong ◽  
L. Wang ◽  
C.L. Zhao

2011 ◽  
Vol 22 (5-6) ◽  
pp. 538-553 ◽  
Author(s):  
Martin Ollus ◽  
Kim Jansson ◽  
Iris Karvonen ◽  
Mikko Uoti ◽  
Heli Riikonen

A construction project is a form of activity that takes place within a limited period of time, with certain resources to achieve the results of a certain form of building or infrastructure. The success of a project is assessed by the suitability of the schedule, cost and quality planned in the contract. In the implementation of construction projects there are often delays caused by the parties involved or from influencing factors. This study discusses material analysis, labor, and project management on the timeliness of housing projects in the Cibubur Indonesia. Delay in project implementation has an influence on planned budget changes. This research aims to find the dominant factor causing delays in housing projects in the Cibubur Indonesia. This research is a survey research which is a study that takes a sample from a population using questionnaires and interviews as a data collection tool that is distributed to respondents, where the number of respondents is 31 (thirty one) in the Cibubur area housing project. This study concludes that the dominant factors causing delays are as follows: (1) Late delivery of materials, (2) Limited number of workers, (3) Poor project land conditions, (4) Weak project management and implementation by contractors. The cause of the delay can be controlled by using anticipatory and preventive measures. The action was taken to overcome the impact due to the dominant factor that could cause the delay. This research is expected to be beneficial for contractor service business providers and project owners as the housing developer, so that the project can be anticipated and the next project can run according to the planned times.


Sign in / Sign up

Export Citation Format

Share Document