Field Operational Test of Integrated Freeway Ramp Metering/Arterial Adaptive Signal Control: Lessons Learned in Irvine, California
2002 ◽
Vol 1811
(1)
◽
pp. 76-83
◽
Keyword(s):
Keyword(s):
2021 ◽
pp. 036119812110130
Keyword(s):
1999 ◽
Vol 5
(1)
◽
pp. 3-38
Keyword(s):
2018 ◽
Vol 2672
(18)
◽
pp. 35-44
◽
Keyword(s):
2010 ◽
Vol 2192
(1)
◽
pp. 167-176
◽
Keyword(s):
1999 ◽
Vol 125
(1)
◽
pp. 30-38
◽