Metallurgical Failure Analysis of Cracked First Stage Vane of Heavy-Duty Industrial Gas Turbine Engine for Power Generation

2019 ◽  
Vol 56 (6) ◽  
pp. 404-414
Author(s):  
A. Neidel ◽  
S. Wallich ◽  
T. Ullrich
Author(s):  
Ronald P. Porter

The 6 MW class Allison 501-KH gas turbine was introduced to the industrial power generation market in the mid-1980s as a low risk modification of the 501-KB engine. The aero-derivative and industrial background of the 501-KB engine is discussed along with the 501-KH product definition and product description. The results of the development, and production 501-KH engines are presented, including performance testing and customer operation. In addition, near term improvement plans for the 501-KH and a boosted version are outlined.


2010 ◽  
Author(s):  
Shahrokh Etemad ◽  
Benjamin Baird ◽  
Sandeep Alavandi ◽  
William Pfefferle

1974 ◽  
Author(s):  
H. Hiraki ◽  
K. Nakao ◽  
T. Nakayama ◽  
T. Miyamaru

A fuel control system for a prototype gas turbine with recuperator is described. The electronic fuel control was designed with the aid of a hybrid simulator. Its performance is verified on the bench test for a 600-bhp gas turbine engine with recuperator. Prediction of vehicle behavior and transmission requirements were made for a heavy-duty, 32-ton dump truck equipped wtih the 600-bhp gas turbine engine.


Sign in / Sign up

Export Citation Format

Share Document