scholarly journals Monte Carlo risk management

Author(s):  
M. Di Pierro ◽  
A. Nandy
Keyword(s):  
2018 ◽  
Vol 98 ◽  
pp. 11-26 ◽  
Author(s):  
Alejandro Peña ◽  
Isis Bonet ◽  
Christian Lochmuller ◽  
Francisco Chiclana ◽  
Mario Góngora

Author(s):  
Cristiana Tudor ◽  
Maria Tudor

This chapter covers the essentials of using the Monte Carlo Simulation technique (MSC) for project schedule and cost risk analysis. It offers a description of the steps involved in performing a Monte Carlo simulation and provides the basic probability and statistical concepts that MSC is based on. Further, a simple practical spreadsheet example goes through the steps presented before to show how MCS can be used in practice to assess the cost and duration risk of a project and ultimately to enable decision makers to improve the quality of their judgments.


Risks ◽  
2018 ◽  
Vol 6 (3) ◽  
pp. 88 ◽  
Author(s):  
Rui Fang ◽  
Xiaohu Li

Co-risk measures and risk contribution measures have been introduced to evaluate the degree of interaction between paired risks in actuarial risk management. This paper attempts to study the ordering behavior of measures on interaction between paired risks. For various co-risk measures and risk contribution measures, we investigate how the marginal distributions and the dependence structure impact on the level of interaction between paired risks. Also, several numerical examples based on Monte Carlo simulation are presented to illustrate the main findings.


Sign in / Sign up

Export Citation Format

Share Document