scholarly journals Preliminary design for hot dirty-gas control-valve test facility. Final report

1980 ◽  
Author(s):  
1976 ◽  
Author(s):  
L. Awerbuch ◽  
L. Beaulaurier ◽  
P.T. Doyle ◽  
R.A. Hogue ◽  
A.N. Rogers

2010 ◽  
Vol 455 ◽  
pp. 146-150
Author(s):  
Fang Cao ◽  
Yong Wang ◽  
Y.T. An

According to the real structure and work condition of a large-scale gas control valve used in recycling generating electricity project, a sequential fluid-structure interaction system model of control valve is set up, the coupling of fluid and valve plug is studied. The complicated fluid pressure, stress and deformation of balanced valve plug and stem at different control valve openings are investigated. The root cause of plug vibration by fluid is revealed. The natural frequency and modes of vibration are obtained, which could verify whether the design overcomes resonance. All of these are in favor of realizing design optimization in fluid-structure interaction and are of great practical significance for advancing study on large-scale control valves.


1968 ◽  
Vol 90 (1) ◽  
pp. 21-37 ◽  
Author(s):  
P. Goldstein

The following report is the third and last in a series describing the progress of “A Research Study on Internal Corrosion of High Pressure Boilers.” The first report described the background, scope, and organization of the program as well as the test facility. The second report discussed the methods of testing and the results of the first six runs. This final report describes the results of the last six tests and discusses the conclusions drawn from all of Phases II and III. The scope and an outline of seven tests composing the newly scheduled Phase IV program are also included. The results of runs with three types of boiler water treatment, fouled heat transfer surfaces, and conditions simulating fresh water and seawater condenser leakage are included. Data relating to deposition and corrosion in these environments are presented with particular emphasis on the severe corrosion experienced with simulated seawater condenser leakage.


Sign in / Sign up

Export Citation Format

Share Document