scholarly journals Safety evaluation report related to operation of Fast Flux Test Facility. Supplement No. 1

1979 ◽  
Author(s):  
1986 ◽  
Vol 30 (9) ◽  
pp. 885-889 ◽  
Author(s):  
Paul M. Lewis ◽  
Dan J. Swaim

In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8- to a 12-hour/day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off- the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.