Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


Author(s):  
Jason Reece

Housing quality, stability, and affordability have a direct relationship to socioemotional and physical health. Both city planning and public health have long recognized the role of housing in health, but the complexity of this relationship in regard to infant and maternal health is less understood. Focusing on literature specifically relevant to U.S. metropolitan areas, I conduct a multidisciplinary literature review to understand the influence of housing factors and interventions that impact infant and maternal health. The paper seeks to achieve three primary goals. First, to identify the primary “pathways” by which housing influences infant and maternal health. Second, the review focuses on the role and influence of historical housing discrimination on maternal health outcomes. Third, the review identifies emergent practice-based housing interventions in planning and public health practice to support infant and maternal health. The literature suggests that the impact of housing on infant health is complex, multifaceted, and intergenerational. Historical housing discrimination also directly impacts contemporary infant and maternal health outcomes. Policy interventions to support infant health through housing are just emerging but demonstrate promising outcomes. Structural barriers to housing affordability in the United States will require new resources to foster greater collaboration between the housing and the health sectors.


Land ◽  
2020 ◽  
Vol 10 (1) ◽  
pp. 17
Author(s):  
Wojciech Bal ◽  
Magdalena Czalczynska-Podolska

The coastline of Western Pomerania has natural and cultural assets that have promoted the development of tourism, but also require additional measures to ensure the traditional features and characteristics are protected. This is to ensure that new developments conform to a more uniform set of spatial structures which are in line with the original culture. Today, seaside resorts are characterized by a rapid increase in development with a clear trend towards non-physiognomic architectural forms which continually expand and encroach on land closer to the coastline. This results in a blurring of the original concepts that characterized the founding seaside resort. This study evaluates 11 development projects (including a range of hotels, luxury residential buildings and hotel suites) built in 2009–2020 in the coastal area of Western Pomerania. An assessment of architecture-and-landscape integration for each development project was made, using four groups of evaluation criteria: aesthetic, socio-cultural, functional and locational factors. The study methodology included a historical and interpretative study (iconology, iconography, historiography) and an examination of architecture-and-landscape integration using a pre-prepared evaluation form. Each criterion was first assessed using both field surveys and desk research (including the analysis of construction plans and developer materials), and then compared with the original, traditional qualities of the town. This study demonstrates that it is possible to clearly identify the potential negative impact of tourism development on the cultural landscape of seaside resorts, and provides recommendations for future shaping, management and conservation of the landscape.


2021 ◽  
Vol 13 (11) ◽  
pp. 5795
Author(s):  
Sławomir Biruk ◽  
Łukasz Rzepecki

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.


2018 ◽  
Vol 49 ◽  
pp. 02020
Author(s):  
Hery Suliantoro ◽  
Nurul Fitriani ◽  
Bagus Hario Setiadji

Risk is a condition caused by uncertainty. Risks will occur on any construction project, including bridge construction projects. Efforts that can be taken to minimize the impact of these risks are to engage in risk management activities. This research was conducted on bridge construction work on toll road procurement project in Pejagan-Pemalang, Pemalang-Batang and Salatiga-Kertasura. The purpose of this research is to analyze the risk of bridge development project in toll road project using Risk Breakdown Structure (RBS) method and then the result as database in discussing risk response strategy. The bridge construction project has 36 risks that are divided into six groups: materials and equipment, design, human resources, finance, management, nature and environmental conditions. Bad weather risks are the higest risk and seasonal risk causing temporary work stoppages. This risk-response strategy is avoidance. Short-term avoidance response strategy is to add shift workers, install tents and add additives in the acceleration of the process of maturation of concrete. The long-term avoidance response strategy is to evaluate and rearrange the work schedule by considering the weather forecast report.