Analysis of Cost Control Techniques Used on Building Construction Projects in Sri Lanka

2018 ◽  
Author(s):  
N. H. K. Cooray ◽  
H. M. D. N. Somathilake ◽  
Mihiri Wickramasinghe ◽  
T. D. S. H. Dissanayke ◽  
D. M. M. I. Dissanayake
2021 ◽  
Author(s):  
K.G.A.S Waidyasekara ◽  
◽  
K.I. Ridmika ◽  
N.M.G.H. Sandagomika ◽  
A.N Konara ◽  
...  

The construction industry, which is a labour intensive and skill development of the industry would yield both economic and social returns to the national economy. Among other occupational categories, there is a significant demand for the plant and equipment (P&E) operators in the construction industry. Nevertheless, limited numbers of research are available on the said area. Hence, the aim of this paper is to investigate the status of P&E operators in Sri Lankan building construction projects. Accordingly, this study encompassed a qualitative research approach, and six semi-structured expert interviews were conducted as the data collection tool. The study revealed that mainly two categories of P&E as moveable and immovable and further identified subcategories under each. Based on the results, occupational map was developed for the P&E operators in building construction projects in Sri Lanka. Furthermore, the study revealed that technical and mechanical skills as an essential input for an efficient P& E operator. Moreover, the paper discussed issues with P & E operators. Accordingly, inconsistency, taking long leave, poor health conditions, less experience, and less motivation were identified as prominent issues.


Author(s):  
M. Kesavan ◽  
P. B. G. Dissanayake ◽  
C. K. Pathirana ◽  
M. M. D. R. Deegahawature ◽  
K. D. R. Silva

2020 ◽  
Vol 13 (4) ◽  
pp. 767-792 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Martin Skitmore

PurposeLegions of projects fail to attain their time and cost objectives due to ineffective coordination. This is often due to a lack of essential learning from projects because of insufficient communication and working experience. One of the key reasons why this occurs is that managers are unaware of what knowledge needs to be retained. In contrast with knowledge management research, which mostly focuses on the systems and processes for capturing, storing, and retrieval of knowledge, this paper investigates the nature of project communication and learning and their role on project time and cost control.Design/methodology/approachA stratified proportional purposive sampling approach was adopted in choosing the interview participants for the study. They are experienced industry practitioners working on building construction projects in Malaysia. Content analysis was then performed on the interview data. The identified variables were further validated by 11 industry experts from the three primary construction stakeholders.FindingsThe results of a series of 12 in-depth interviews with industry practitioners are provided to reveal the effective communication tools for sharing and learning in a project-based environment, the learning inducing situations involved, and the use of reusable project experiences to improve project time and cost control.Research limitations/implicationsA possible limitation of the study is its focus on a small group of Malaysian practitioners delimits the generalizability of the findings.Originality/valueA two-phase model with three-step project management process of input, tools, and output is developed from the Project Management Body of Knowledge (PMBOK) Guide as an aid for more effective knowledge reuse in project time and cost control in the future.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
B.A.K.S. Perera ◽  
D.C. Sirimewan ◽  
A.D. Senadeera

Purpose Many public-sector building projects in developing countries are prone to variations owing to the changes made to their original project scopes, and economic depressions and stagnations. Cost and time-overruns are consequences of such variations. Thus, variation management in these projects is important. Hence, this paper aims to analyse the methods of managing variations in public-sector building projects in Sri Lanka. Design/methodology/approach The study adopted a mixed research approach. Seventeen expert interviews and a questionnaire survey were conducted to identify the causes and consequences of the variations, and the strategies that will help manage those variations. Manual content analysis and mean weighted rankings (MWR) were used to analyse the collected quantitative and qualitative data, respectively. Findings The employer, consultant, contractor and several other factors are mostly responsible for the variations in public-sector building projects in Sri Lanka. Cost and time-overruns, rework and demolition and disputes are the major consequences of such variations. The study findings reveal that a detailed employer’s brief, clearly defined project objectives, a comprehensive design and set of specifications, and preliminary investigations are the strategies that will mostly minimise the variations in public-sector building projects in Sri Lanka. Originality/value The study proposes strategies to avoid or minimise the adverse impact of variations, which the industry practitioners can adopt for variation management in public-sector building projects. The study theoretically contributes to knowledge by revealing how variations in public-sector building projects in Sri Lanka can be managed by identifying their causes and consequences.


2014 ◽  
Vol 584-586 ◽  
pp. 2494-2499
Author(s):  
Wen Zhou Yan ◽  
Cheng Cheng Wang

In order to raise the level of management in building construction cost, knowledge management approach is proposed in this paper. An XML (Extensible Markup Language)-based paradigm matrix is established to represent construction cost control knowledge. In the matrix, the row elements are made up of feature attributes, and construction working procedures are the components of the column. Furthermore, based on the Hamming weighted proximity, the closeness between new construction projects and target case is calculated such that the similarity is obtained, by this method the knowledge matching is achieved. These methods remedy non-standardized description of the construction cost control knowledge and inefficient retrieval of the construction cost control cases, which offers a basis for knowledge management in construction cost control.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2017 ◽  
Vol 18 (4) ◽  
pp. 411-422
Author(s):  
Rómel Gilberto Solís-Carcaño ◽  
◽  
Carmen Sarahí Morfín-García ◽  
Jesús Nicolás Zaragoza-Grifé ◽  
◽  
...  

2021 ◽  
Vol 13 (4) ◽  
pp. 2202
Author(s):  
Amalka Nawarathna ◽  
Muditha Siriwardana ◽  
Zaid Alwan

The choice of materials is crucial in responding to the increasing embodied carbon (EC) impacts of buildings. Building professionals involved in material selection for construction projects have a vital role to play in this regard. This paper aimed to explore the extent to which building professionals in Sri Lanka considered EC as a material selection criterion. A questionnaire survey was conducted among a sample of building professionals in Sri Lanka. The results indicated that the consideration of EC as a material selection criterion remained low among key professionals, such as architects, engineers, and sustainability managers, despite their reasonable influencing powers and knowledge of EC. Those respondents who had considered EC as a selection criterion said they had been primarily driven by green building rating systems and previous experience. Those respondents who had not considered EC during material selection commonly reported that they had been prevented from doing so by the lack of regulations and the lack of alternative low carbon materials. Respondents believed that the involvement of actors, such as the government, professional bodies, environmental organizations, activist groups, and the public, may be significant in promoting the greater consideration of EC during material selection.


Sign in / Sign up

Export Citation Format

Share Document