scholarly journals The Tradeoff between Ex Ante and Ex Post Transaction Costs: Evidence from Legal Opinions

Author(s):  
Benito Arruuada ◽  
Carlos A. Manzanares
2020 ◽  
Vol 0 (0) ◽  
Author(s):  
Henrik Lando

AbstractWhen parties are risk-averse and therefore take out insurance, the efficiency of a tort rule depends on how well the insurance contracts govern incentives, risk allocation and transaction costs under the rule. This article presents two overlooked or discarded advantages of the rule of negligence over strict liability, which appear when insurance contracts are incomplete due to ex-ante transaction or ex-post verification costs. One advantage arises because of a legal impediment under strict liability: insurers cannot exempt coverage for all acts of simple negligence. Instead, the insurer must, at a cost, precisely specify each act for which coverage is excluded. Such specification can be prohibitively costly when there are many acts and many contingencies. These transaction costs, or the inefficient risk allocation associated with a deductible, are avoided under the negligence rule, where under idealized conditions the injurer can simply take due care and need not take out insurance. The other advantage of the negligence rule is that it provides incentives for the victim to bring forward information about the injurer’s acts. The victim has little incentive to convey such information under strict liability, whereas the victim’s insurer may elicit it, e. g. by not covering the victim’s loss fully.


2018 ◽  
Vol 24 (5) ◽  
pp. 424-436 ◽  
Author(s):  
Fábio Bellotti da Fonseca ◽  
Rosangela Maria Vanalle ◽  
João Alberto Camarotto

Construction costs comprise not only production but also transaction costs, which can be categorized as ex-ante (pre-contractual) and ex-post (post-contractual) costs. No evidence has been found in the literature of research about transaction costs in industrial construction engineering projects. The objective of this paper is to identify ex-ante and ex-post transaction costs in industrial engineering construction projects. To accomplish this, empirical research with 4 case studies was conducted with a large engineering firm in Brazil. This research not only identified transaction costs already found by others, dividing them into ex-ante and ex-post, but also identified that travel, RFP clarification, support to strategic decisions of the owner and knowledge transfer are transaction costs not previously identified in the researched literature but that are very relevant to the respective subject. Therefore, this research confirms that transaction costs should be considered ex-ante and ex-post by owners and contractors in industrial construction engineering projects and enlightens academics and practitioners on ways to achieve the reduction of such costs.


MIS Quarterly ◽  
2016 ◽  
Vol 40 (1) ◽  
pp. 57-82 ◽  
Author(s):  
Michel Benaroch ◽  
◽  
Yossi Lichtenstein ◽  
Lior Fink ◽  
◽  
...  

CFA Digest ◽  
2003 ◽  
Vol 33 (3) ◽  
pp. 8-9
Author(s):  
Ann C. Logue
Keyword(s):  
Ex Post ◽  

1993 ◽  
Vol 108 (2) ◽  
pp. 135-138
Author(s):  
Pierre Malgrange ◽  
Silvia Mira d'Ercole
Keyword(s):  
Ex Post ◽  

Sign in / Sign up

Export Citation Format

Share Document