Input Substitutability, Trade Costs and the Product Cycle

2011 ◽  
Author(s):  
Tomasz Kamil Michalski
Keyword(s):  
2019 ◽  
Vol 4 (2) ◽  
pp. 205-214
Author(s):  
Erika Fatma

Lot sizing problem in production planning aims to optimize production costs (processing, setup and holding cost) by fulfilling demand and resources capacity costraint. The Capacitated Lot sizing Problem (CLSP) model aims to balance the setup costs and inventory costs to obtain optimal total costs. The object of this study was a plastic component manufacturing company. This study use CLSP model, considering process costs, holding costs and setup costs, by calculating product cycle and setup time. The constraint of this model is the production time capacity and the storage capacity of the finished product. CLSP can reduce the total production cost by 4.05% and can reduce setup time by 46.75%.  Keyword: Lot size, CLSP, Total production cost.


1979 ◽  
Vol 33 (1) ◽  
pp. 1-34 ◽  
Author(s):  
James R. Kurth

What explains the continuing stagnation in the industrial economies of the West? What will be the impact of such stagnation upon domestic politics and upon international relations? Are there domestic and foreign policies which the state can undertake to bring about a return to sustained economic prosperity and a recapitulation of that lost golden age of 1948–1973? These are now the central questions for scholars in the emerging field of international political economy. A recent special issue of International Organization, edited by Peter Katzenstein, has presented some of the most useful and sophisticated approaches to these questions and analyses of the international political economy of the West during the period of the last thirty years.


Sign in / Sign up

Export Citation Format

Share Document