Use of Quantitative 4D-Seismic Data in Automatic History Match

Author(s):  
Ricardo Cunha Mattos Portella ◽  
Alexandre Anoze Emerick
2020 ◽  
Author(s):  
Konrad Wojnar ◽  
Jon S?trom ◽  
Tore Felix Munck ◽  
Martha Stunell ◽  
Stig Sviland-Østre ◽  
...  

Abstract The aim of the study was to create an ensemble of equiprobable models that could be used for improving the reservoir management of the Vilje field. Qualitative and quantitative workflows were developed to systematically and efficiently screen, analyze and history match an ensemble of reservoir simulation models to production and 4D seismic data. The goal of developing the workflows is to increase the utilization of data from 4D seismic surveys for reservoir characterization. The qualitative and quantitative workflows are presented, describing their benefits and challenges. The data conditioning produced a set of history matched reservoir models which could be used in the field development decision making process. The proposed workflows allowed for identification of outlying prior and posterior models based on key features where observed data was not covered by the synthetic 4D seismic realizations. As a result, suggestions for a more robust parameterization of the ensemble were made to improve data coverage. The existing history matching workflow efficiently integrated with the quantitative 4D seismic history matching workflow allowing for the conditioning of the reservoir models to production and 4D data. Thus, the predictability of the models was improved. This paper proposes a systematic and efficient workflow using ensemble-based methods to simultaneously screen, analyze and history match production and 4D seismic data. The proposed workflow improves the usability of 4D seismic data for reservoir characterization, and in turn, for the reservoir management and the decision-making processes.


Author(s):  
A. Ogbamikhumi ◽  
T. Tralagba ◽  
E. E. Osagiede

Field ‘K’ is a mature field in the coastal swamp onshore Niger delta, which has been producing since 1960. As a huge producing field with some potential for further sustainable production, field monitoring is therefore important in the identification of areas of unproduced hydrocarbon. This can be achieved by comparing production data with the corresponding changes in acoustic impedance observed in the maps generated from base survey (initial 3D seismic) and monitor seismic survey (4D seismic) across the field. This will enable the 4D seismic data set to be used for mapping reservoir details such as advancing water front and un-swept zones. The availability of good quality onshore time-lapse seismic data for Field ‘K’ acquired in 1987 and 2002 provided the opportunity to evaluate the effect of changes in reservoir fluid saturations on time-lapse amplitudes. Rock physics modelling and fluid substitution studies on well logs were carried out, and acoustic impedance change in the reservoir was estimated to be in the range of 0.25% to about 8%. Changes in reservoir fluid saturations were confirmed with time-lapse amplitudes within the crest area of the reservoir structure where reservoir porosity is 0.25%. In this paper, we demonstrated the use of repeat Seismic to delineate swept zones and areas hit with water override in a producing onshore reservoir.


2007 ◽  
Author(s):  
Frederic Roggero ◽  
Didier Yu Ding ◽  
Philippe Berthet ◽  
Olivier Lerat ◽  
Julien Cap ◽  
...  

2003 ◽  
Vol 9 (1) ◽  
pp. 83-90 ◽  
Author(s):  
M. Lygren ◽  
K. Fagervik ◽  
T.S. Valen ◽  
A. Hetlelid ◽  
G. Berge ◽  
...  

Author(s):  
Carlos Eduardo Abreu ◽  
Nathalie Lucet and Philippe Nivlet ◽  
Jean-Jacques Royer

Sign in / Sign up

Export Citation Format

Share Document