Unlock Mono-Trip Gas Lift Completions Limits by using a New Cement-Through Packer and a Sliding Sleeve with Radio Frequency Identification Capability

2021 ◽  
Author(s):  
Siriwat Hanjawanich ◽  
Taylor Shelby ◽  
Kanin Laonakornthum ◽  
Euan Murdoch ◽  
Kanokkorn Piemchaw ◽  
...  

Abstract Gas lift is one of the most appropriate artificial lift methods for Gulf of Thailand (GOT) oil operations. As first described in Chapman, W. R. (2005), Mono-trip gas lift (MTGL) completions have continuously improved since their implementation in the early 2000s, increasing recovery by over 15%. MTGL completions enable marginal or sub-economic new wellhead platforms (WHPs) or infill projects to become economical. To overcome the more challenging wellbore environment in which the current technology is unable to be utilized, alternative technology was trialed in 2019 to enhance the MTGL completion without sacrificing the wellbore designs or reserves.

Sign in / Sign up

Export Citation Format

Share Document