Intelligent Digital Oilfield Implementation: Production Optimization Using North Kuwait Integrated Digital Oil Field NK KwIDF

2019 ◽  
Author(s):  
Dalal Al-Subaiei ◽  
Mohammad Al-Hamer ◽  
Ahmed Al-Zaidan ◽  
Hom Chetri ◽  
Mohammad Sami Nawaz
2021 ◽  
pp. 014459872199465
Author(s):  
Yuhui Zhou ◽  
Sheng Lei ◽  
Xuebiao Du ◽  
Shichang Ju ◽  
Wei Li

Carbonate reservoirs are highly heterogeneous. During waterflooding stage, the channeling phenomenon of displacing fluid in high-permeability layers easily leads to early water breakthrough and high water-cut with low recovery rate. To quantitatively characterize the inter-well connectivity parameters (including conductivity and connected volume), we developed an inter-well connectivity model based on the principle of inter-well connectivity and the geological data and development performance of carbonate reservoirs. Thus, the planar water injection allocation factors and water injection utilization rate of different layers can be obtained. In addition, when the proposed model is integrated with automatic history matching method and production optimization algorithm, the real-time oil and water production can be optimized and predicted. Field application demonstrates that adjusting injection parameters based on the model outputs results in a 1.5% increase in annual oil production, which offers significant guidance for the efficient development of similar oil reservoirs. In this study, the connectivity method was applied to multi-layer real reservoirs for the first time, and the injection and production volume of injection-production wells were repeatedly updated based on multiple iterations of water injection efficiency. The correctness of the method was verified by conceptual calculations and then applied to real reservoirs. So that the oil field can increase production in a short time, and has good application value.


2011 ◽  
Author(s):  
Sergey Shevchenko ◽  
Dmitry Mironov ◽  
V.A. Navozov ◽  
Eduard Muslimov ◽  
Roman Leonidovich Pchelnikov ◽  
...  

2014 ◽  
Author(s):  
Hector Aguilar ◽  
Aref Almarzooqi ◽  
Tarek Mohamed El Sonbaty ◽  
Leigber Villarreal

2020 ◽  
Vol 10 (2) ◽  
pp. 17-35
Author(s):  
Hamzah Amer Abdulameer ◽  
Dr. Sameera Hamd-Allah

As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is increased.In this study, a nodal analysis software was used to design one well with natural flow andother with ESP. Reservoir, fluid and well information are taken from actual data of Mishrifformation-Nasriya oil field/ NS-5 well. Well design steps and data required in the modelwill be displayed and the optimization sensitivity keys will be applied on the model todetermine the effect of each individual parameter or when it combined with another one.


2021 ◽  
Author(s):  
Henry Ijomanta ◽  
Lukman Lawal ◽  
Onyekachi Ike ◽  
Raymond Olugbade ◽  
Fanen Gbuku ◽  
...  

Abstract This paper presents an overview of the implementation of a Digital Oilfield (DOF) system for the real-time management of the Oredo field in OML 111. The Oredo field is predominantly a retrograde condensate field with a few relatively small oil reservoirs. The field operating philosophy involves the dual objective of maximizing condensate production and meeting the daily contractual gas quantities which requires wells to be controlled and routed such that the dual objectives are met. An Integrated Asset Model (IAM) (or an Integrated Production System Model) was built with the objective of providing a mathematical basis for meeting the field's objective. The IAM, combined with a Model Management and version control tool, a workflow orchestration and automation engine, A robust data-management module, an advanced visualization and collaboration environment and an analytics library and engine created the Oredo Digital Oil Field (DOF). The Digital Oilfield is a real-time digital representation of a field on a computer which replicates the behavior of the field. This virtual field gives the engineer all the information required to make quick, sound and rational field management decisions with models, workflows, and intelligently filtered data within a multi-disciplinary organization of diverse capabilities and engineering skill sets. The creation of the DOF involved 4 major steps; DATA GATHERING considered as the most critical in such engineering projects as it helps to set the limits of what the model can achieve and cut expectations. ENGINEERING MODEL REVIEW, UPDATE AND BENCHMARKING; Majorly involved engineering models review and update, real-time data historian deployment etc. SYSTEM PRECONFIGURATION AND DEPLOYMENT; Developed the DOF system architecture and the engineering workflow setup. POST DEPLOYMENT REVIEW AND UPDATE; Currently ongoing till date, this involves after action reviews, updates and resolution of challenges of the DOF, capability development by the operator and optimizing the system for improved performance. The DOF system in the Oredo field has made it possible to integrate, automate and streamline the execution of field management tasks and has significantly reduced the decision-making turnaround time. Operational and field management decisions can now be made within minutes rather than weeks or months. The gains and benefits cuts across the entire production value chain from improved operational safety to operational efficiency and cost savings, real-time production surveillance, optimized production, early problem detection, improved Safety, Organizational/Cross-discipline collaboration, data Centralization and Efficiency. The DOF system did not come without its peculiar challenges observed both at the planning, execution and post evaluation stages which includes selection of an appropriate Data Gathering & acquisition system, Parts interchangeability and device integration with existing field devices, high data latency due to bandwidth, signal strength etc., damage of sensors and transmitters on wellheads during operations such as slickline & WHM activities, short battery life, maintenance, and replacement frequency etc. The challenges impacted on the project schedule and cost but created great lessons learnt and improved the DOF learning curve for the company. The Oredo Digital Oil Field represents a future of the oil and gas industry in tandem with the industry 4.0 attributes of using digital technology to drive efficiency, reduce operating expenses and apply surveillance best practices which is required for the survival of the Oil and Gas industry. The advent of the 5G technology with its attendant influence on data transmission, latency and bandwidth has the potential to drive down the cost of automated data transmission and improve the performance of data gathering further increasing the efficiency of the DOF system. Improvements in digital integration technologies, computing power, cloud computing and sensing technologies will further strengthen the future of the DOF. There is need for synergy between the engineering team, IT, and instrumentation engineers to fully manage the system to avoid failures that may arise from interface management issues. Battery life status should always be monitored to ensure continuous streaming of real field data. New set of competencies which revolves around a marriage of traditional Petro-technical skills with data analytic skills is required to further maximize benefit from the DOF system. NPDC needs to groom and encourage staff to venture into these data analytic skill pools to develop knowledge-intelligence required to maximize benefit for the Oredo Digital Oil Field and transfer this knowledge to other NPDC Asset.


2013 ◽  
Vol 798-799 ◽  
pp. 349-352
Author(s):  
Man Yuan ◽  
Jing Shu Yuan ◽  
Gang Huan ◽  
Dan Dan Wang

A light mobile GIS framework is proposed which is based on J2ME and mobile scalable vector graphics (SVG), GIS is an important component in digital oilfield. First, it defines a general mobile GIS framework. Second, all kinds of GIS code rules are defined, how to manage map layer in SVG is defined, all kinds of GISs object can be described in SVG and DOM of XML. And finally, in distributed environment, based on SVG, JAVAME and related technologies, a light mobile GIS platform is implemented. In this case, the light mobile GIS platform can be used to not only transmit production data, but also locate the interested objects, and the platform is applied to the Daqing oil field.


2017 ◽  
Author(s):  
O. Espinola ◽  
R. Castrejon ◽  
J. A. Yanez ◽  
A. Torres ◽  
R. Martinez ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document