Innovative Engineering Workflows as Part of Digital Oil Field Implementation for Production Optimization of a Gas Asset MEXICO, PEMEX AIV

2017 ◽  
Author(s):  
O. Espinola ◽  
R. Castrejon ◽  
J. A. Yanez ◽  
A. Torres ◽  
R. Martinez ◽  
...  
2021 ◽  
pp. 014459872199465
Author(s):  
Yuhui Zhou ◽  
Sheng Lei ◽  
Xuebiao Du ◽  
Shichang Ju ◽  
Wei Li

Carbonate reservoirs are highly heterogeneous. During waterflooding stage, the channeling phenomenon of displacing fluid in high-permeability layers easily leads to early water breakthrough and high water-cut with low recovery rate. To quantitatively characterize the inter-well connectivity parameters (including conductivity and connected volume), we developed an inter-well connectivity model based on the principle of inter-well connectivity and the geological data and development performance of carbonate reservoirs. Thus, the planar water injection allocation factors and water injection utilization rate of different layers can be obtained. In addition, when the proposed model is integrated with automatic history matching method and production optimization algorithm, the real-time oil and water production can be optimized and predicted. Field application demonstrates that adjusting injection parameters based on the model outputs results in a 1.5% increase in annual oil production, which offers significant guidance for the efficient development of similar oil reservoirs. In this study, the connectivity method was applied to multi-layer real reservoirs for the first time, and the injection and production volume of injection-production wells were repeatedly updated based on multiple iterations of water injection efficiency. The correctness of the method was verified by conceptual calculations and then applied to real reservoirs. So that the oil field can increase production in a short time, and has good application value.


2011 ◽  
Author(s):  
Sergey Shevchenko ◽  
Dmitry Mironov ◽  
V.A. Navozov ◽  
Eduard Muslimov ◽  
Roman Leonidovich Pchelnikov ◽  
...  

2014 ◽  
Author(s):  
Hector Aguilar ◽  
Aref Almarzooqi ◽  
Tarek Mohamed El Sonbaty ◽  
Leigber Villarreal

2020 ◽  
Vol 10 (2) ◽  
pp. 17-35
Author(s):  
Hamzah Amer Abdulameer ◽  
Dr. Sameera Hamd-Allah

As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is increased.In this study, a nodal analysis software was used to design one well with natural flow andother with ESP. Reservoir, fluid and well information are taken from actual data of Mishrifformation-Nasriya oil field/ NS-5 well. Well design steps and data required in the modelwill be displayed and the optimization sensitivity keys will be applied on the model todetermine the effect of each individual parameter or when it combined with another one.


2019 ◽  
Author(s):  
Dalal Al-Subaiei ◽  
Mohammad Al-Hamer ◽  
Ahmed Al-Zaidan ◽  
Hom Chetri ◽  
Mohammad Sami Nawaz

2021 ◽  
Author(s):  
Fedor Yurievich Leskin ◽  
Inna Aleksandrovna Sakhipova ◽  
Nikita Mikhailovich Zorkalt?ev ◽  
Alan Kazbekovich Dzutcev ◽  
Svetlana Rafailievna Pavlova ◽  
...  

Abstract Oil-saturated strata of Western Siberia fields are represented by laminated low-permeability sandstone separated by shale layers. Therefore, when designing hydraulic fractures, it is important to create longer propped fracture half-length and provide coverage of oil-saturated layers along the entire net height. Implementation of high-volume proppant fractures in combination with high-viscosity crosslinked fluids leads to excessive fracture height growth. In some cases it results in ineffective proppant distribution in the target layer and, moreover, to unwanted water production if the water contact or water bearing formation is close. To overcome these issues, it was proposed to use a novel hydraulic fracturing fluid that is a viscous slickwater based on synthetic polymer-polyacrylamide (also known as HiVis FR or HVFR). The low viscosity of HVFR (about 10 times lower than that of a crosslinked gel) allows a long fracture to be created and restricts height growth. Additionally, use of polyacrylamide instead of guar gives a larger value of retained conductivity. The full workflow for implementing HVFR for hydraulic fracturing in conventional formations includes candidate evaluation, HVFR laboratory testing, an integrated engineering approach to fracture modeling, operational considerations, and post-fracturing production analysis. The workflow evolved during the technology implementation cycle in a specific oil field, particularly the modeling step, which used a new high precision multiphysics (MP) model. The MP model provides an advanced, high-quality high- precision fracturing design to properly evaluate fracture geometry and proppant distribution by accounting for proppant settling in viscoelastic fluid and an accurate simulation of proppant placement when using a pulsing schedule. During the 2-year project, considerable success was achieved in expanding of the technology implementation scope. Several records were achieved on Kondinskoe oil field - a 150-t of ceramic proppant (SG, specific gravity,~3.1) were placed in a conventional reservoir by low-viscosity fracturing fluid and the first worldwide combination of viscous slickwater with channel fracturing technology was successfully performed. The use of HVFR, due to ability of fracture growth control, prevented breakthrough into the water-bearing zone. In addition, considerable improvement of operational efficiency was achieved due to use of cold water, lower amounts of additives, and less equipment, which resulted in a smaller location and environmental footprint. This first implementation of the viscous slickwater in conventional wells in Western Siberia enabled evaluating its effect on production rate. Increasing demand for maximizing production from low- permeability formations makes the result of this viscous slickwater implementation campaign of special interest. The application of a full engineering workflow, including design, execution, and evaluation of the Viscous slickwater treatments is a key to successful technology implementation and production optimization.


Sign in / Sign up

Export Citation Format

Share Document