Abstract Halfaya field in Iraq contains multiple vertically stacked oil and gas accumulations. The major oil horizons at depth of over 10,000 ft are under primary development. The main technical challenges include downdip heavy oil wells (as low as 14.56 °API) became watered-out and ceased flow due to depleted formation pressure. Heavy crude, with surface viscosities of above 10,000 cp, was too viscous to lift inefficiently. The operator applied high-pressure rich-gas/condensate to re-pressurize the dead wells and resumed production. The technical highlights are below: Laboratory studies confirmed that after condensate (45-52ºAPI) mixed with heavy oil, blended oil viscosity can cut by up to 90%; foamy oil formed to ease its flow to the surface during huff-n-puff process.In-situ gas/condensate injection and gas/condensate-lift can be applied in oil wells penetrating both upper high-pressure rich-gas/condensate zones and lower oil zones. High-pressure gas/condensate injected the oil zone, soaked, and then oil flowed from the annulus to allow large-volume well stream flow with minimal pressure drop. Gas/condensate from upper zones can lift the well stream, without additional artificial lift installation.Injection pressure and gas/condensate rate were optimized through optimal perforation interval and shot density to develop more condensate, e.g. initial condensate rate of 1,000 BOPD, for dilution of heavy oil.For multilateral wells, with several drain holes placed toward the bottom of producing interval, operating under gravity drainage or water coning, if longer injection and soaking process (e.g., 2 to 4 weeks), is adopted to broaden the diluted zone in heavy oil horizon, then additional recovery under better gravity-stabilized vertical (downward) drive and limited water coning can be achieved. Field data illustrate that this process can revive the dead wells, well production achieved approximately 3,000 BOPD under flowing wellhead pressure of 800 to 900 psig, with oil gain of over 3-fold compared with previous oil rate; water cut reduction from 30% to zero; better blended oil quality handled to medium crude; and saving artificial-lift cost. This process may be widely applied in the similar hydrocarbon reservoirs as a cost-effective technology in Middle East.


2016 ◽  
Author(s):  
Muchammad R. Alfaqih ◽  
Alexis Ariwibowo ◽  
Christina T. Juliana

2009 ◽  
Author(s):  
Daniel Daparo ◽  
Luis Soliz ◽  
Eduardo Roberto Perez ◽  
Carlos Iver Vidal Saravia ◽  
Philip Duke Nguyen ◽  
...  

2021 ◽  
Author(s):  
Robert Downey ◽  
Kiran Venepalli ◽  
Jim Erdle ◽  
Morgan Whitelock

Abstract The Permian Basin of west Texas is the largest and most prolific shale oil producing basin in the United States. Oil production from horizontal shale oil wells in the Permian Basin has grown from 5,000 BOPD in February, 2009 to 3.5 Million BOPD as of October, 2020, with 29,000 horizontal shale oil wells in production. The primary target for this horizontal shale oil development is the Wolfcamp shale. Oil production from these wells is characterized by high initial rates and steep declines. A few producers have begun testing EOR processes, specifically natural gas cyclic injection, or "Huff and Puff", with little information provided to date. Our objective is to introduce a novel EOR process that can greatly increase the production and recovery of oil from shale oil reservoirs, while reducing the cost per barrel of recovered oil. A superior shale oil EOR method is proposed that utilizes a triplex pump to inject a solvent liquid into the shale oil reservoir, and an efficient method to recover the injectant at the surface, for storage and reinjection. The process is designed and integrated during operation using compositional reservoir simulation in order to optimize oil recovery. Compositional simulation modeling of a Wolfcamp D horizontal producing oil well was conducted to obtain a history match on oil, gas, and water production. The matched model was then utilized to evaluate the shale oil EOR method under a variety of operating conditions. The modeling indicates that for this particular well, incremental oil production of 500% over primary EUR may be achieved in the first five years of EOR operation, and more than 700% over primary EUR after 10 years. The method, which is patented, has numerous advantages over cyclic gas injection, such as much greater oil recovery, much better economics/lower cost per barrel, lower risk of interwell communication, use of far less horsepower and fuel, shorter injection time, longer production time, smaller injection volumes, scalability, faster implementation, precludes the need for artificial lift, elimination of the need to buy and sell injectant during each cycle, ability to optimize each cycle by integration with compositional reservoir simulation modeling, and lower emissions. This superior shale oil EOR method has been modeled in the five major US shale oil plays, indicating large incremental oil recovery potential. The method is now being field tested to confirm reservoir simulation modeling projections. If implemented early in the life of a shale oil well, its application can slow the production decline rate, recover far more oil earlier and at lower cost, and extend the life of the well by several years, while precluding the need for artificial lift.


2021 ◽  
Author(s):  
Sagun Devshali ◽  
Ravi Raman ◽  
Sanjay Kumar Malhotra ◽  
Mahendra Prasad Yadav ◽  
Rishabh Uniyal

Abstract The paper aims to discuss various issues pertaining to gas lift system and instabilities in low producer wells along with the necessary measures for addressing those issues. The effect of various parameters such as tubing size, gas injection rate, multi-porting and gas lift valve port diameter on the performance analysis of integrated gas lift system along with the flow stability have been discussed in the paper. Field X is one of the matured offshore fields in India which has been producing for over 40 years. It is a multi-pay, heterogeneous and complex reservoir. The field is producing through six Process Complexes and more than 90% of the wells are operating on gas lift. As most of the producing wells in the field are operating on gas lift, continuous performance analysis of gas lift to optimize production is imperative to enhance or sustain production. 121 Oil wells and 7 Gas wells are producing through 18 Wellhead platforms to complex X1 of the field X. Out of these 121 oil wells, 5 are producing on self and remaining 116 with gas lift. In this paper, performance analysis of these 116 flowing gas lift wells, carried out to identify various problems which leads to sub-optimal production such as inadequate gas injection, multi-porting, CV choking, faulty GLVs etc. has been discussed. On the basis of simulation studies and analysis of findings, requisite optimization/ intervention measures proposed to improve performance of the wells have been brought out in the paper. The recommended measures predicted the liquid gain of about 1570 barrels per day (518 barrels of oil per day) and an injection gas savings in the region of about 28 million SCFD. Further, the nodal analysis carried out indicates that the aforementioned gas injection saving of 28 million SCFD would facilitate in minimizing the back pressure in the flow line network and is likely to result in an additional production gain of 350 barrels of liquid per day (65 barrels of oil per day) which adds up to a total gain of 1920 barrels of liquid per day (583 barrels of oil per day). Additionally, system/ nodal analysis has also been carried out for optimal gas allocation in the field through Integrated Production Modelling. The analysis brings out a reduction in gas injection by 46 million SCFD with likely incremental oil gain of ~100 barrels of oil per day.


Author(s):  
Jorge Luiz Biazussi ◽  
Cristhian Porcel Estrada ◽  
William Monte Verde ◽  
Antonio Carlos Bannwart ◽  
Valdir Estevam ◽  
...  

A notable trend in the realm of oil production in harsh environments is the increasing use of Electrical Submersible Pump (ESP) systems. ESPs have even been used as an artificial-lift method for extracting high-viscosity oils in deep offshore fields. As a way of reducing workover costs, an ESP system may be installed at the well bottom or on the seabed. A critical factor, however, in deep-water production is the low temperature at the seabed. In fact, these low temperatures constitute the main source for many flow-assurance problems, such as the increase in friction losses due to high viscosity. Oil viscosity impacts pump performance, reducing the head and increasing the shaft power. This study investigates the influence of a temperature increase of ultra-heavy oil on ESP performance and the heating effect through a 10-stage ESP. Using several flow rates, tests are performed at four rotational speeds and with four viscosity levels. At each rotational speed curve, researchers keep constant the inlet temperature and viscosity. The study compares the resulting data with a simple heat model developed to estimate the oil outlet temperature as functions of ESP performance parameters. The experimental data is represented by a one-dimensional model that also simulates a 100-stage ESP. The simulations demonstrate that as the oil heat flows through the pump, the pump’s efficiency increases.


2021 ◽  
Vol 73 (03) ◽  
pp. 46-47
Author(s):  
Chris Carpenter

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 201135, “Challenges in ESP Operation in Ultradeepwater Heavy-Oil Atlanta Field,” by Alexandre Tavares, Paulo Sérgio Rocha, SPE, and Marcelo Paulino Santos, Enauta, et al., prepared for the 2020 SPE Virtual Artificial Lift Conference and Exhibition - Americas, 10-12 November. The paper has not been peer reviewed. Atlanta is a post-salt offshore oil field in the Santos Basin, 185 km southeast of Rio de Janeiro. The combination of ultradeep water (1550 m) and heavy, viscous oil creates a challenging scenario for electrical submersible pump (ESP) applications. The complete paper discusses the performance of an ESP system using field data and software simulations. Introduction From initial screening to define the best artificial-lift method for the Atlanta Field’s requirements, options such as hydraulic pumps, hydraulic submersible pumps, multiphase pumps, ESPs, and gas lift (GL) were considered. Analysis determined that the best primary system was one using an in-well ESP with GL as backup. After an initial successful drillstem test (DST) with an in-well ESP, the decision was made, for the second DST, to install the test pump inside the riser, near seabed depth. It showed good results; comparison of oil-production potential between the pump installed inside a structure at the seabed—called an artificial lift skid (ALS)—and GL suggested that the latter would prove uneconomical. The artificial lift development concept is shown in Fig. 1. ESP Design ESP sizing was performed with a commercial software and considered available information on reservoir, completion, subsea, and topsides. To ensure that the ESP chosen would meet production and pressure boosts required in the field, base cases were built and analyzed for different moments of the field’s life. The cases considered different productivity indexes (PI), reservoir pressures, and water production [and consequently water cut (WC)] as their inputs. The design considers using pumps with a best efficiency point (BEP) for water set at high flow rates (17,500 B/D for in-well and 34,000 B/D for ALS). Thus, when the pumps deal with viscous fluid, the curve will have a BEP closer to the current operating point. Design boundaries of the in-well ESP and the ALS are provided in the complete paper, as are some of the operational requirements to be implemented in the ESP design to minimize risk. Field Production History In 2014, two wells were drilled, tested, and completed with in-well ESP as the primary artificial lift method. Because of delays in delivery of a floating production, storage, and offloading vessel (FPSO), the backup (ALS) was not installed until January 2018. In May 2018, Atlanta Field’s first oil was achieved through ATL-2’s in-well ESP. After a few hours operating through the in-well ESP, it prematurely failed, and the ALS of this well was successfully started up. Fifteen days after first oil, ATL-3’s in-well ESP was started up, but, as occurred with ATL-2, failed after a short period. Its ALS was successfully started up, and both wells produced slightly more than 1 year in that condition.


Sign in / Sign up

Export Citation Format

Share Document