Performance Analysis for Progressive Cavity Pump PCP Production Scenario in Sandy and Heavy Oil Wells

2016 ◽  
Author(s):  
Muchammad R. Alfaqih ◽  
Alexis Ariwibowo ◽  
Christina T. Juliana
2019 ◽  
Author(s):  
Mahmoud Atef El Gharbawi ◽  
Ahmed Ahemd Elgibaly ◽  
Adel Mohamed Salem ◽  
Mohamed Abbas

2009 ◽  
Author(s):  
Daniel Daparo ◽  
Luis Soliz ◽  
Eduardo Roberto Perez ◽  
Carlos Iver Vidal Saravia ◽  
Philip Duke Nguyen ◽  
...  

2021 ◽  
Author(s):  
Xueqing Tang ◽  
Ruifeng Wang ◽  
Zhongliang Cheng ◽  
Hui Lu

Abstract Halfaya field in Iraq contains multiple vertically stacked oil and gas accumulations. The major oil horizons at depth of over 10,000 ft are under primary development. The main technical challenges include downdip heavy oil wells (as low as 14.56 °API) became watered-out and ceased flow due to depleted formation pressure. Heavy crude, with surface viscosities of above 10,000 cp, was too viscous to lift inefficiently. The operator applied high-pressure rich-gas/condensate to re-pressurize the dead wells and resumed production. The technical highlights are below: Laboratory studies confirmed that after condensate (45-52ºAPI) mixed with heavy oil, blended oil viscosity can cut by up to 90%; foamy oil formed to ease its flow to the surface during huff-n-puff process.In-situ gas/condensate injection and gas/condensate-lift can be applied in oil wells penetrating both upper high-pressure rich-gas/condensate zones and lower oil zones. High-pressure gas/condensate injected the oil zone, soaked, and then oil flowed from the annulus to allow large-volume well stream flow with minimal pressure drop. Gas/condensate from upper zones can lift the well stream, without additional artificial lift installation.Injection pressure and gas/condensate rate were optimized through optimal perforation interval and shot density to develop more condensate, e.g. initial condensate rate of 1,000 BOPD, for dilution of heavy oil.For multilateral wells, with several drain holes placed toward the bottom of producing interval, operating under gravity drainage or water coning, if longer injection and soaking process (e.g., 2 to 4 weeks), is adopted to broaden the diluted zone in heavy oil horizon, then additional recovery under better gravity-stabilized vertical (downward) drive and limited water coning can be achieved. Field data illustrate that this process can revive the dead wells, well production achieved approximately 3,000 BOPD under flowing wellhead pressure of 800 to 900 psig, with oil gain of over 3-fold compared with previous oil rate; water cut reduction from 30% to zero; better blended oil quality handled to medium crude; and saving artificial-lift cost. This process may be widely applied in the similar hydrocarbon reservoirs as a cost-effective technology in Middle East.


2021 ◽  
Author(s):  
Sagun Devshali ◽  
Ravi Raman ◽  
Sanjay Kumar Malhotra ◽  
Mahendra Prasad Yadav ◽  
Rishabh Uniyal

Abstract The paper aims to discuss various issues pertaining to gas lift system and instabilities in low producer wells along with the necessary measures for addressing those issues. The effect of various parameters such as tubing size, gas injection rate, multi-porting and gas lift valve port diameter on the performance analysis of integrated gas lift system along with the flow stability have been discussed in the paper. Field X is one of the matured offshore fields in India which has been producing for over 40 years. It is a multi-pay, heterogeneous and complex reservoir. The field is producing through six Process Complexes and more than 90% of the wells are operating on gas lift. As most of the producing wells in the field are operating on gas lift, continuous performance analysis of gas lift to optimize production is imperative to enhance or sustain production. 121 Oil wells and 7 Gas wells are producing through 18 Wellhead platforms to complex X1 of the field X. Out of these 121 oil wells, 5 are producing on self and remaining 116 with gas lift. In this paper, performance analysis of these 116 flowing gas lift wells, carried out to identify various problems which leads to sub-optimal production such as inadequate gas injection, multi-porting, CV choking, faulty GLVs etc. has been discussed. On the basis of simulation studies and analysis of findings, requisite optimization/ intervention measures proposed to improve performance of the wells have been brought out in the paper. The recommended measures predicted the liquid gain of about 1570 barrels per day (518 barrels of oil per day) and an injection gas savings in the region of about 28 million SCFD. Further, the nodal analysis carried out indicates that the aforementioned gas injection saving of 28 million SCFD would facilitate in minimizing the back pressure in the flow line network and is likely to result in an additional production gain of 350 barrels of liquid per day (65 barrels of oil per day) which adds up to a total gain of 1920 barrels of liquid per day (583 barrels of oil per day). Additionally, system/ nodal analysis has also been carried out for optimal gas allocation in the field through Integrated Production Modelling. The analysis brings out a reduction in gas injection by 46 million SCFD with likely incremental oil gain of ~100 barrels of oil per day.


2009 ◽  
Author(s):  
Bassam Zreik ◽  
Ahmed Salim Al-Hattali ◽  
Khalfan Hamoud Al-Busaidi ◽  
Mohamed N. Bushara ◽  
Surendra Kumar Tripathy

Sign in / Sign up

Export Citation Format

Share Document