Maximising Production of Lowest-Cost Oil and Gas from Existing Integrated Production Systems Using the Sweating the Asset Change Management Process
Keyword(s):
2012 ◽
Vol 160
(7-8)
◽
pp. 337-345
◽
Keyword(s):
2011 ◽
Vol 29
(4)
◽
pp. 520-525
◽
2014 ◽
Vol 45
(5spe)
◽
pp. 976-989
◽