Super-Large Scale Horizontal Well Position Optimization Method and Infilling Practice in High Water-cut Large Complex Fluvial Reservoir Based On Multidisciplinary Innovative Techniques

2016 ◽  
Author(s):  
Kai Wang ◽  
Haisheng Wang ◽  
Xiao Shu ◽  
Dasheng Zhou ◽  
Ruizhe Wang ◽  
...  
2013 ◽  
Vol 803 ◽  
pp. 383-386
Author(s):  
Shu Ren Yang ◽  
Di Xu ◽  
Chao Yu ◽  
Jia Wei Fan ◽  
Cheng Chu Yue Fu

In order to solve the problem of high water cut wells in some oil field in Daqing that it could not get the large-scale application because of the bad separating effect of down hole centrifugal oil-water separator, we optimize the design of multi-cup uniform flux oil-water separator according to the similar separation principle of multi-cup uniform flux gas anchor, and it is obtained to achieve of injection-production technology in the same well which is of high water cut. The design concept of the separator is increasing the number of opening every layer and aperture gradually in subsection from up to down in the design process. The purpose is to get the close intake quantity of every orifice and guarantee the residence time is long enough in the separator, effectively shorten the length of down hole oil-water separator and reduce the production costs and operating costs.


2021 ◽  
Author(s):  
An Jiang ◽  
Yunpeng Li ◽  
Xing Liu ◽  
Fengli Zhang ◽  
Tianhui Wang ◽  
...  

Abstract Objectives/Scope Controlling the excessive water production from the high water cut gravel packing horizontal well is a challenge. The approach which uses regular packers or packers with ICD screens to control the unwanted water does not function well. This is mainly because of the length limitation of packers which will make the axial flow resistance insufficient. Methods, Procedures, Process In this paper, a successful case that unwanted water is shutoff by using continuous pack-off particles with ICD screens (CPI) in the whole horizontal section in an offshore oilfield of Bohai bay is presented. The reservoir of this case is the bottom-water high viscosity reservoir. The process is to run 2 3/8" ICD screen string into the 4" screen string originally in place, then to pump the pack-off particles into the annulus between the two screens, and finally form the 360m tightly compacted continuous pack-off particle ring. Results, Observations, Conclusions The methodology behind the process is that the 2-3/8" ICD screens limit the flow rate into the pipes as well as the continuous pack-off particle ring together with the gravel ring outside the original 4" screens to prevent the water channeling into the oil zone along the horizontal section. This is the first time this process is applied in a high water cut gravel packed horizontal well. After the treatment, the water rate decreased from 6856BPD to 836.6BPD, the oil rate increased from 44BPD to 276.8BPD. In addition, the duration of this performance continued a half year until March 21, 2020. Novel/Additive Information The key of this technology is to control the unwanted water by using the continuous pack-off particles instead of the parkers, which will bring 5 advantages, a) higher efficiency in utilizing the production interval; b) no need to find the water source and then fix it; c) the better ability to limit the axial flow; d) effective to multi-WBT (water break though) points and potential WBT points; e) more flexible for further workover. The technology of this successful water preventing case can be reference to other similar high water cut gravel packed wells. Also, it has been proved that the well completion approach of using CPI can have good water shutoff and oil incremental result. Considering the experiences of historical applications, CPI which features good sand control, water shutoff and anti-clogging is a big progress compared to the current completion technologies.


2021 ◽  
Author(s):  
Valery Sergeevich Sorokin ◽  
Alexey Semenovich Gudoshnikov ◽  
Denis Vyacheslavovich Nyunyaykin ◽  
Andrey Anatolyevich Kochenkov ◽  
Prasad Sethuraman ◽  
...  

Abstract This paper describes a production optimiser Pilot, developed by Rosneft/Samotlorneftegaz, with support from bp and deployed in JSC Samotlorneftegaz - a vast, mature, water-flooded, high water-cut and artificially-lifted oil field. Objectives include creating a digital twin for a sub-system of 600 wells and ~180 km of pipeline network, applying discrete, continuous and constrained optimisation techniques to maximise production, developing sustainable deployment workflows, implementing optimiser recommendations in the field and tracking incremental value realisation. This proof-of-concept Pilot and field trial approach was adopted to understand the optimisation technology capability and work-flow sustainability, prior to a field-wide roll-out. The periodic optimisation activity workflows include the creation of a "Digital Twin", a validated surface infrastructure model that is fully calibrated to mimic field performance, followed by performing optimisation that includes all the relevant constraints. Optimisation was trialled using two different classes of algorithms – based on sequential-modular and equation-oriented techniques. This strategy minimises optimisation failure risks and highlights potential performance issues for such large-scale systems. Optimiser recommendations were consolidated, field-implemented and values tracked. The optimiser Pilot development was undertaken during the fourth quarter of 2019. The delivered minimum viable product and workflows were used for field trials during 2019-20 and continuously improved based on the learnings. Specialists from both bp and Rosneft, along with three consulting organisations (1 in Russia and 2 in the UK) collaborated and worked as one-team to deliver the Pilot. Optimiser recommendations for maximising production include continuous and discrete decisions such as ESP frequency changes, high water-cut well shut-ins and prioritised ESP lists for installing variable speed drives. Field production increase of 1% was achieved in 2020 and tracked. Enduring capabilities were built, and sustainable work-flows developed. Field-wide optimisation for Samotlorneftegaz is non-trivial due to the sheer size, with over 9,000 active wells and due to continuously transient operations arising from frequent well-work, well shut-in's, new well delivery, pipeline modifications and cyclic mode of operations in some wells. This Pilot has provided assurance for the optimisation technical feasibility and workflow sustainability. A second Pilot of similar complexity but with different pressure-flow system response is planned. The combined results will help to decide about the full-field roll-out for this vast field, which is anticipated to deliver around 1% of additional production. This Pilot has demonstrated the applicability of discrete and continuous variable constrained optimisation techniques to large-scale production networks, with very high well-count. Furthermore, the developed workflows for configuring and calibrating the digital twin have several unique components including automation of hydraulic network model generation from static data, well model build automation and fit-for-purpose automated well model calibration. Overall, the results of this approach demonstrate a viable and sustainable methodology to optimise large-scale oil production systems.


1998 ◽  
Author(s):  
Jianhua Qin ◽  
Ruiqi Yang ◽  
Jianping Chi ◽  
Shouyun Cheng ◽  
Canxing Dai ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document