High-Strength Coiled Tubing Intervention to Set Sand Plugs in an Extended Reach Well in the Dutch North Sea

2016 ◽  
Author(s):  
Peter Maxwell ◽  
Anna Savenkova ◽  
Richard Hampson ◽  
Marc van Wonderen
2022 ◽  
Author(s):  
Shaun Thomson ◽  
Baglan Kiyabayev ◽  
Barry Ritchie ◽  
Jakob Monberg ◽  
Maurits De Heer ◽  
...  

Abstract The Valdemar field, located in the Danish sector of the North Sea, targets a Lower Cretaceous, "dirty chalk" reservoir characterized by low permeabilities of <0.5mD, high porosities of >20% and contains up to 25% insoluble fines. To produce economically the reservoir must be stimulated. Typically, this is by means of hydraulic fracturing. A traditional propped fracture consists of 500,000 to 1,000,000 lbs of 20/40 sand, placed using a crosslinked seawater-based borate fluid. The existing wells in the field are completed using the PSI (perforate, isolate, stimulate)1 system. This system was developed in the late 1980s as a way of improving completion times allowing each interval to be perforated, stimulated and isolated in a single trip and has been used extensively in the Danish North Sea in a variety of fields. The system consists of multiset packers with sliding sleeves and typically takes 2-3 days between the start of one fracture to the next. Future developments in this area now require a new, novel and more efficient approach owing to new target reservoir being of a thinner and poorer quality. In order for these new developments to be economical an approach was required to allow for longer wells to be drilled and completed allowing better reservoir connectivity whilst at the same time reducing the completion time, and therefore rig time and overall cost. A project team was put together to develop a system that could be used in an offshore environment that would satisfy the above criteria, allowing wells to be drilled out to 21,000ft and beyond in excess of coiled tubing reach. The technology developed consists of cemented frac sleeves, operated with jointed pipe, allowing multiple zones to be stimulated in one trip, as well as utilizing a modified BHA that allows for the treatments to take place through the tubing, bringing numerous benefits. The following paper details the reasons for developing the new technology, the development process itself, the challenges that had to be overcome and a case history on the execution of the first job of its kind in the North Sea, in which over 7MM lbs of sand was pumped successfully, as well as the post treatment operations which included a proof of concept in utilizing a tractor to manipulate the sleeves. Finally, the production performance will be discussed supported by the use of tracer subs at each of the zones.


1996 ◽  
Vol 48 (5) ◽  
Author(s):  
Philip Wodka ◽  
Henrik Tirsgaard ◽  
C.J. Adamsen ◽  
A.P. Damgaard

2006 ◽  
Author(s):  
Peter Shayle Bartholomew ◽  
Lance Nigel Portman ◽  
Roger Frost ◽  
Paul Thomas Nunn ◽  
Peter Alan Vause ◽  
...  

Metals ◽  
2018 ◽  
Vol 8 (9) ◽  
pp. 700 ◽  
Author(s):  
Garikoitz Artola ◽  
Alberto Arredondo ◽  
Ana Fernández-Calvo ◽  
Javier Aldazabal

Hydrogen embrittlement susceptibility ratios calculated from slow strain rate tensile tests have been employed to study the response of three high-strength mooring steels in cold and warm synthetic seawater. The selected nominal testing temperatures have been 3 °C and 23 °C in order to resemble sea sites of offshore platform installation interest, such as the North Sea and the Gulf of Mexico, respectively. Three scenarios have been studied for each temperature: free corrosion, cathodic protection and overprotection. An improvement on the hydrogen embrittlement tendency of the steels has been observed when working in cold conditions. This provides a new insight on the relevance of the seawater temperature as a characteristic to be taken into account for mooring line design in terms of hydrogen embrittlement assessment.


2020 ◽  
Author(s):  
Scott Sherman ◽  
Sean M Majko ◽  
Jeffrey Otto

Sign in / Sign up

Export Citation Format

Share Document