A Pilot Test of Continuous Bottom Hole Pressure Monitoring for Production Optimization of Coalbed Methane in the Raton Basin
Keyword(s):
2021 ◽
Vol 196
◽
pp. 107799
Keyword(s):
2015 ◽
Vol 8
(1)
◽
pp. 197-201
2018 ◽
Vol 44
(6)
◽
pp. 6155-6165
Keyword(s):