Successful Implementation of Coiled-Tubing Acid Tunneling Gives Operator a Viable Alternative to Conventional Stimulation Techniques in Carbonate Reservoirs

Author(s):  
Jose Daniel Diaz ◽  
Victor Espina ◽  
Melvi Guerrero ◽  
Omar Gregorio Colmenares ◽  
Paul John Moss
2021 ◽  
Author(s):  
Khaled M. Matar ◽  
Abdullah B. Al-Mutairi ◽  
Nakul Khandelwal ◽  
Sapna Chawla ◽  
Mohammad Alkreebani ◽  
...  

Abstract Drilling a multilateral well is generally recommended for several reasons such as achieving higher productivity indices and improving recovery in tight, low-permeable zones. While the many benefits of multilateral wells are attractive, they also have drawbacks which make these wells challenging. A key challenge is how to effectively stimulate all the laterals after they have been drilled. This paper presents the application of a unique intervention technique in a multilateral well to stimulate several laterals in a single run. To increase reservoir contact area the operator drilled a multilateral well composed of 4 legs. This was carried out despite the absence of proven ways to stimulate each lateral individually. This intervention would also present the following challenges: Well displacement and stimulation would require multiple re-entries into each lateral, all conducted from a drilling rig. All the laterals were known to branch off from the low side of the bore, so individual lateral and main-bore selection would be complex. Extended reach laterals require accurate friction lockup modelling and mitigations. The unique solution presented in this paper includes the use of real-time Hybrid cable coiled tubing (RTHCT) technology. This incorporates a hybrid cable installed in the coiled tubing (CT) string and a modular sensing bottom-hole assembly (MSBHA). Electrically controlled indexing tool, inclination sensor, tool-face sensor, and hydraulic knuckle joint were used as part of the BHA to enable real-time diagnostics and dynamic controls from surface to successfully enter the lateral legs. The MSBHA enabled the orientation of the BHA electrically to any position required using software to determine and control the exact position of the BHA. This paper presents a solution to all the above-mentioned challenges. It discusses the successful implementation of the RTHCT to displace and stimulate all the 4 laterals in a single CT trip in less than seven days, pumping over 7,000 bbls of various chemical systems and covering an open-hole length of 11,176 ft. Unlike other technologies, the RTHCT technology confirmed entries into the laterals without the need to tag the bottom of the lateral, saving substantial time. Enabling re-entry in these 4 laterals represented a world record translating into major efficiency improvements and cost savings for the project. This intervention also represented the first time in Kuwait that more than 2 laterals have been accessed in a CT run.


2021 ◽  
Author(s):  
Mykhailo Pytko ◽  
Pavlo Kuchkovskyi ◽  
Ibrahim Abdellaitif ◽  
Ernesto Franco Delgado ◽  
Andriy Vyslobitsky ◽  
...  

Abstract This paper describes three coiled tubing (CT) applications in depleted reservoir wells, where full circulation and precise fluid placement were achievable only by using a novel solids-free loss-control system, such as abrasive perforating applications. It also describes the preparation work, such as laboratory results and mixing procedure performed to ensure successful implementation. The analysis of Ukrainian reservoir conditions by local and global engineering teams showed that in a highly depleted well, abrasive jetting through CT was the best option to efficiently perforate the wellbore. However, this approach could lead to later impairment of the gas production if the abrasive material (sand) could not be entirely recovered. Such a risk was even higher as wells were depleted and significant losses to the formation occurred. The use of solids-free fluid-loss material that was easy to mix, pump, and remove after the operation, was, therefore, critical to the success of that approach. In Ukraine, most of the brownfields have a reservoir pressure that varies between 50% and 20% of the original reservoir pressure. This is a challenge for CT operations in general and especially for abrasive jetting, which requires full circulation to remove solids. It also complicates intervention when precise fluid placement control is required, such as spotting cement to avoid its being lost into the formation. The perforation solids-free loss-control system is a highly crosslinked Hydroxy-Ethyl Cellulose (HEC) system designed for use after perforating when high-loss situations require a low-viscosity, nondamaging, bridging agent as is normally required in sand control applications. It is supplied as gel particles that are readily dispersed in most completion brines. The particles form a low-permeability filter cake that is pliable, conforms to the formation surface, and limits fluid loss. The system produces low friction pressures, which enable its placement using CT. Introduction of that system in Ukraine allowed the full circulation of sand or cuttings to surface without inducing significant damage to the formation for first time; it was also used for balanced cement plug placements. This project was the first application of the solids-free loss-control system in combination with CT operations. It previously was used only for loss control material during the well completion phase in sand formations with the use of drilling rigs.


2014 ◽  
Author(s):  
Bassam Gorgi ◽  
Eber Medina ◽  
Jorge Gleaves ◽  
Juan Acuna ◽  
Luis Perera ◽  
...  

2021 ◽  
Author(s):  
Nashat Jumaah Omar ◽  
Ibrahim Saeb Al-Saeedi

Abstract This study deals with a lazy well completed with no packer in place. The main producing formation is showing strong signs of depletion where it lost more 2000 psig of reservoir pressure since the production started. Previous experiences in this well and other offset wells show there is demand for Nitrogen Injection Through Coiled Tubing Unit in the tubing in order to lift the well and bring it online whenever the well is shut-in for any reason. Direct natural gas injection at the casing head is a cost-effective alternative to rigless well lift operations. However, this is a challenging thing to achieve since it requires precise knowledge of injection rates and casing head pressure, additional to that formation fracture pressure and other reservoir characteristics should be taken into consideration. Data were collected and dynamic wellbore is created and linked to near well reservoir model to capture the transient behavior of the reservoir during start-up process. From Dynamic Modeling and simulation of the production system, best injection pressure, production choke, injection time and quantities are estimated and optimized for more efficient lifting process. After Initiating the well, production stability is observed in the transient simulator to ensure the success of the well lifting method. This method of production initiation is cost effective, and if implemented properly should bring the well back in production fast. Successful implementation this method demands a precise wellbore model to be created and shut-in surveys should be used to match the well status when it's not producing to tune the wellbore and fluid parameters.


2017 ◽  
Author(s):  
Laurie Duthie ◽  
Abubaker Saeed ◽  
Saud Shaheen ◽  
Hussain Saiood ◽  
Bruce Moore ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document