Faster, Better, Cheaper: Low-Cost Innovation in the U.S. Space Program (review)

2002 ◽  
Vol 43 (3) ◽  
pp. 646-647
Author(s):  
Stephen B. Johnson
Shore & Beach ◽  
2019 ◽  
pp. 3-12
Author(s):  
Joan Pope

In the 1970s, the U.S. Congress authorized and funded a five-year demonstration program on low-cost methods for shore protection called the “U.S. Army Engineers Shoreline Erosion Control Demonstration (Section 54) Program.” The Section 54 also known as the “Low-Cost Shore Protection” demonstration program is revisited. Demonstration and monitoring sites including the materials, devices, vegetative plantings, approaches tested, and program findings are discussed. Simply put, a major finding of the Section 54 program was that the concept of “low-cost shore protection” was a bit naïve. However, the program did lead to a wealth of public information documents and practical coastal engineering lessons that are still resonating as home owners, communities, and engineers consider alternative approaches for managing coastal erosion. The program structure and findings are applicable 40 years later as consideration is given toward the use of Natural and Nature-based Features (NNBF) for addressing coastal erosion. Evolution in thought relative to coastal erosion and shoreline enhancement activities since the 1970s has built upon many of the lessons and concepts of the Section 54 program and other real-world coastal erosion management success-failure experiences. This growth has led to a modern appreciation that those features that emulate NNBF are promising and responsible alternative coastal erosion management strategies if proper engineering standard elements of design are included in the project.


2020 ◽  
Vol 2 (2) ◽  
pp. 280-293
Author(s):  
Mathew G. Pelletier ◽  
Greg A. Holt ◽  
John D. Wanjura

The removal of plastic contamination in cotton lint is an issue of top priority to the U.S. cotton industry. One of the main sources of plastic contamination showing up in marketable cotton bales, at the U.S. Department of Agriculture’s classing office, is plastic from the module wrap used to wrap cotton modules produced by the new John Deere round module harvesters. Despite diligent efforts by cotton ginning personnel to remove all plastic encountered during unwrapping of the seed cotton modules, plastic still finds a way into the cotton gin’s processing system. To help mitigate plastic contamination at the gin; an inspection system was developed that utilized low-cost color cameras to see plastic on the module feeder’s dispersing cylinders, that are normally hidden from view by the incoming feed of cotton modules. This technical note presents the design of an automated intelligent machine-vision guided cotton module-feeder inspection system. The system includes a machine-learning program that automatically detects plastic contamination in order to alert the cotton gin personnel as to the presence of plastic contamination on the module feeder’s dispersing cylinders. The system was tested throughout the entire 2019 cotton ginning season at two commercial cotton gins and at one gin in the 2018 ginning season. This note describes the over-all system and mechanical design and provides an over-view and coverage of key relevant issues. Included as an attachment to this technical note are all the mechanical engineering design files as well as the bill-of-materials part source list. A discussion of the observational impact the system had on reduction of plastic contamination is also addressed.


2021 ◽  
Vol 23 (1) ◽  
pp. 1
Author(s):  
Sigit S. Nugroho

Assessing the output of past foreign policy is instrumental for any country to learn policy-relevant insights, to appreciate its experience, and to improve its future conduct. To glean such insights, this article borrows Baldwin’s framework in assessing the success and failure in foreign policy. Using a case study analysis, it assesses the United States’ (U.S.) influence attempt towards Indonesia to resolve the 1999 East Timor humanitarian crisis. President Clinton’s decision to undergo an influence attempt primarily aimed to change Indonesia’s policy while gaining support from U.S. allies in the process. The article finds that Clinton’s decision was a highly successful attempt. This finding is based on several factors: (1) the attempt effectively attained the intended primary and secondary goals at a considerably high degree; (2) it was conducted at a considerably low cost for the U.S.; (3) it inflicted a high cost towards Indonesia; (4) the increase in Clinton’s stake strengthened the U.S. resolve to pursue the influence attempt; and (5) Clinton had successfully overcome the difficult undertaking as Indonesia possessed higher stake over East Timor. These findings provide some lessons for both U.S. and Indonesian foreign policymakers to chart future relations for the two nations.


Author(s):  
A.P. Newbery ◽  
P.S. Grant ◽  
R.M. Jordan ◽  
A.D. Roche ◽  
T.C. Carr

Abstract The manufacture of tooling using the electric arc spray process to spray steel directly onto a master pattern offers substantial reductions in the lead times required to make complex tooling for polymer injection moulding and other applications. The process of spray forming is fast, efficient, and low cost, and has been shown to be dimensionally accurate with proper control over the residual stresses that develop during spraying. Poor dimensional control because of high internal stresses in thick arc sprayed steel coatings is well known, but these problems can be avoided by the use of correct spraying conditions. This paper describes the STD SPRAYFORM process for the manufacture of tooling for the polymer injection moulding of a component for a leading company in the U.S. The steps in the spray forming process, both before and after spraying, are described. The spray forming route competed directly with a traditional method for toolmaking and considerably reduced the lead time from order to completion. The tooling produced by spray forming has been operating commercially in production in the U.S. and has to date produced in the region of half a million parts without appreciable wear. The incorporation of contoured cooling channels during spraying has enabled plastic injection moulding cycle times to be decreased by 15%.


Sign in / Sign up

Export Citation Format

Share Document