scholarly journals The Airlift Planning Problem

2019 ◽  
Vol 53 (3) ◽  
pp. 773-795
Author(s):  
Dimitris Bertsimas ◽  
Allison Chang ◽  
Velibor V. Mišić ◽  
Nishanth Mundru

The U.S. Transportation Command (USTRANSCOM) is responsible for planning and executing the transportation of U.S. military personnel and cargo by air, land, and sea. The airlift planning problem faced by the air component of USTRANSCOM is to decide how requirements (passengers and cargo) will be assigned to the available aircraft fleet and the sequence of pickups and drop-offs that each aircraft will perform to ensure that the requirements are delivered with minimal delay and with maximum utilization of the available aircraft. This problem is of significant interest to USTRANSCOM because of the highly time-sensitive nature of the requirements that are typically designated for delivery by airlift, as well as the very high cost of airlift operations. At the same time, the airlift planning problem is extremely difficult to solve because of the combinatorial nature of the problem and the numerous constraints present in the problem (such as weight restrictions and crew rest requirements). In this paper, we propose an approach for solving the airlift planning problem faced by USTRANSCOM based on modern, large-scale optimization. Our approach relies on solving a large-scale mixed-integer programming model that disentangles the assignment decision (which aircraft will pickup and deliver which requirement) from the sequencing decision (in what order the aircraft will pickup and deliver its assigned requirements), using a combination of heuristics and column generation. Through computational experiments with both a simulated data set and a planning data set provided by USTRANSCOM, we show that our approach leads to high-quality solutions for realistic instances (e.g., 100 aircraft and 100 requirements) within operationally feasible time frames. Compared with a baseline approach that emulates current practice at USTRANSCOM, our approach leads to reductions in total delay and aircraft time of 8%–12% in simulated data instances and 16%–40% in USTRANSCOM’s planning instances.

2020 ◽  
Vol 2020 ◽  
pp. 1-11
Author(s):  
Bochen Wang ◽  
Qiyuan Qian ◽  
Zheyi Tan ◽  
Peng Zhang ◽  
Aizhi Wu ◽  
...  

This study investigates a multidepot heterogeneous vehicle routing problem for a variety of hazardous materials with risk analysis, which is a practical problem in the actual industrial field. The objective of the problem is to design a series of routes that minimize the total cost composed of transportation cost, risk cost, and overtime work cost. Comprehensive consideration of factors such as transportation costs, multiple depots, heterogeneous vehicles, risks, and multiple accident scenarios is involved in our study. The problem is defined as a mixed integer programming model. A bidirectional tuning heuristic algorithm and particle swarm optimization algorithm are developed to solve the problem of different scales of instances. Computational results are competitive such that our algorithm can obtain effective results in small-scale instances and show great efficiency in large-scale instances with 70 customers, 30 vehicles, and 3 types of hazardous materials.


2017 ◽  
Vol 26 (44) ◽  
pp. 21 ◽  
Author(s):  
John Willmer Escobar

This paper contemplates the supply chain design problem of a large-scale company by considering the maximization of the Net Present Value. In particular, the variability of the demand for each type of product at each customer zone has been estimated. As starting point, this paper considers an established supply chain for which the main problem is to determine the decisions regarding expansion of distribution centers. The problem is solved by using a mixed-integer linear programming model, which optimizes the different demand scenarios. The proposed methodology uses a scheme of optimization based on the generation of multiple demand scenarios of the supply network. The model is based on a real case taken from a multinational food company, which supplies to the Colombian and some international markets. The obtained results were compared with the equivalent present costs minimization scheme of the supply network, and showed the importance and efficiency of the proposed approach as an alternative for the supply chain design with stochastic parameters.


2020 ◽  
Vol 2020 ◽  
pp. 1-13 ◽  
Author(s):  
Yunfang Peng ◽  
Tian Zeng ◽  
Yajuan Han ◽  
Beixin Xia

In order to solve the problem of vehicle scheduling to feed parts at automobile assembly line, this study proposes a just-in-time delivery method combined with the mode of material supermarket. A mixed integer linear programming model with the primary objective of using the least number of tow trains is constructed by considering capacity of vehicle and inventory levels of line. On the basis of the minimum number of tow trains, the schedule of each tour is reasonably planned to minimize inventory of assembly line, which is the secondary objective of the part supply problem. Additionally, a heuristic algorithm which can obtain a satisfactory solution in a short time is designed to solve large-scale problems after considering continuity and complexity of modern automobile production. Furthermore, some cases are analyzed and compared with the widely used periodic delivery strategy, and the feasibility of just-in-time model and algorithm is verified. The results reveal that just-in-time delivery strategy has more advantages in reducing inventory level than periodic delivery strategy.


2018 ◽  
Vol 2018 ◽  
pp. 1-10 ◽  
Author(s):  
Xiaodong Shen ◽  
Yang Liu ◽  
Yan Liu

In order to solve the uncertainty and randomness of the output of the renewable energy resources and the load fluctuations in the reactive power optimization, this paper presents a novel approach focusing on dealing with the issues aforementioned in dynamic reactive power optimization (DRPO). The DRPO with large amounts of renewable resources can be presented by two determinate large-scale mixed integer nonlinear nonconvex programming problems using the theory of direct interval matching and the selection of the extreme value intervals. However, it has been admitted that the large-scale mixed integer nonlinear nonconvex programming is quite difficult to solve. Therefore, in order to simplify the solution, the heuristic search and variable correction approaches are employed to relax the nonconvex power flow equations to obtain a mixed integer quadratic programming model which can be solved using software packages such as CPLEX and GUROBI. The ultimate solution and the performance of the presented approach are compared to the traditional methods based on the evaluations using IEEE 14-, 118-, and 300-bus systems. The experimental results show the effectiveness of the presented approach, which potentially can be a significant tool in DRPO research.


2020 ◽  
Vol 2020 ◽  
pp. 1-11 ◽  
Author(s):  
Cheng Luo ◽  
Hongying Fei ◽  
Dana Sailike ◽  
Tingyi Xu ◽  
Fuzhi Huang

“Double-Line Ship Mooring” (DLSM) mode has been applied as an initiative operation mode for solving berth allocation problems (BAP) in certain giant container terminals in China. In this study, a continuous berth scheduling problem with the DLSM model is illustrated and solved with exact and heuristic methods with an objective to minimize the total operation cost, including both the additional transportation cost for vessels not located at their minimum-cost berthing position and the penalties for vessels not being able to leave as planned. First of all, this problem is formulated as a mixed-integer programming model and solved by the CPLEX solver for small-size instances. Afterwards, a particle swarm optimization (PSO) algorithm is developed to obtain good quality solutions within reasonable execution time for large-scale problems. Experimental results show that DLSM mode can not only greatly reduce the total operation cost but also significantly improve the efficiency of berth scheduling in comparison with the widely used single-line ship mooring (SLSM) mode. The comparison made between the results obtained by the proposed PSO algorithm and that obtained by the CPLEX solver for both small-size and large-scale instances are also quite encouraging. To sum up, this study can not only validate the effectiveness of DLSM mode for heavy-loaded ports but also provide a powerful decision support tool for the port operators to make good quality berth schedules with the DLSM mode.


Author(s):  
Qiang Meng ◽  
Shuaian Wang ◽  
Zhiyuan Liu

A model was developed for network design of a shipping service for large-scale intermodal liners that captured essential practical issues, including consistency with current services, slot purchasing, inland and maritime transportation, multiple-type containers, and origin-to-destination transit time. The model used a liner shipping hub-and-spoke network to facilitate laden container routing from one port to another. Laden container routing in the inland transportation network was combined with the maritime network by defining a set of candidate export and import ports. Empty container flow is described on the basis of path flow and leg flow in the inland and maritime networks, respectively. The problem of network design for shipping service of an intermodal liner was formulated as a mixed-integer linear programming model. The proposed model was used to design the shipping services for a global liner shipping company.


2020 ◽  
Vol 69 ◽  
pp. 297-342
Author(s):  
Jacopo Banfi ◽  
Vikram Shree ◽  
Mark Campbell

This paper introduces and studies a graph-based variant of the path planning problem arising in hostile environments. We consider a setting where an agent (e.g. a robot) must reach a given destination while avoiding being intercepted by probabilistic entities which exist in the graph with a given probability and move according to a probabilistic motion pattern known a priori. Given a goal vertex and a deadline to reach it, the agent must compute the path to the goal that maximizes its chances of survival. We study the computational complexity of the problem, and present two algorithms for computing high quality solutions in the general case: an exact algorithm based on Mixed-Integer Nonlinear Programming, working well in instances of moderate size, and a pseudo-polynomial time heuristic algorithm allowing to solve large scale problems in reasonable time. We also consider the two limit cases where the agent can survive with probability 0 or 1, and provide specialized algorithms to detect these kinds of situations more efficiently.


2018 ◽  
Vol 2018 ◽  
pp. 1-10
Author(s):  
Yinghui Wu ◽  
Yifan Zhu ◽  
Tianyu Cao

Bus timetabling is a subproblem of bus network planning, and it determines departure time of each trip of lines to make vehicles from different lines synchronously arrive at transfer stations. Due to the well-designed coordination of bus timetables, passengers can make a smooth transfer without waiting a long time for connecting buses. This paper addresses the planning level of resynchronizing of bus timetable problem allowing modifications to initial timetable. Timetable modifications consist of shifts in the departure times and headways. A single-objective mixed-integer programming model is proposed for this problem to maximize the number of total transferring passengers benefiting from smooth transfers. We analyze the mathematical properties of this model, and then a preprocessing method is designed to reduce the solution space of the proposed model. The numerical results show that the reduced model is effectively solved by branch and bound algorithm, and the preprocessing method has the potential to be applied for large-scale bus networks.


2021 ◽  
Vol 19 (1) ◽  
pp. 892-917
Author(s):  
Yessica Andrea Mercado ◽  
◽  
César Augusto Henao ◽  
Virginia I. González

<abstract> <p>Considering an uncertain demand, this study evaluates the potential benefits of using a multiskilled workforce through a k-chaining policy with $k \ge 2$. For the service sector and, particularly for the retail industry, we initially propose a deterministic mixed-integer linear programming model that determines how many employees should be multiskilled, in which and how many departments they should be trained, and how their weekly working hours will be assigned. Then, the deterministic model is reformulated using a two-stage stochastic optimization (TSSO) model to explicitly incorporate the uncertain personnel demand. The methodology is tested for a case study using real and simulated data derived from a Chilean retail store. We also compare the TSSO approach solutions with the myopic approaches' solutions (i.e., zero and total multiskilling). The case study is oriented to answer two key questions: how much multiskilling to add and how to add it. Results show that TSSO approach solutions always report maximum reliability for all levels of demand variability considered. It was also observed that, for high levels of demand variability, a k-chaining policy with $k \ge 2$ is more cost-effective than a 2-chaining policy. Finally, to evaluate the conservatism level in the solutions reported by the TSSO approach, two truncation types in the probability density function (pdf) associated with the personnel demand were considered. Results show that, if the pdf is only truncated at zero (more conservative truncation) the levels of required multiskilling are higher than when the pdf is truncated at 5th and 95th percentiles (less conservative truncation).</p> </abstract>


Sign in / Sign up

Export Citation Format

Share Document