Production and Supply Logistics of Sugarcane as an Energy Feedstock

2014 ◽  
pp. 213-222 ◽  
Author(s):  
Jose Goldemberg ◽  
Suani Coelho ◽  
Plinio Nastari ◽  
Patricia Guardabassi
Keyword(s):  
2017 ◽  
Vol 8 (4) ◽  
pp. 643-655 ◽  
Author(s):  
Dominik Zimon

Research background: ISO 9001 with its requirements gives a company a guidance on the definition of the quality management system architecture, based on the process approach and the indications for its continuous improvement. Despite the general emphasis to the benefits of implementation of ISO 9001 in the literature, there is a still lack of research concerning the actual impact of quality management systems for improving specific logistics processes. The research is focused on the Polish market because there is no research in the subject literature which concerns the impact of the implementation of quality management systems on the improvement of logistic processes in Polish enterprises. Purpose of the article: The focus of this publication was to examine the impact of the implementation of the requirements of ISO 9001 for process improvement supply logistics. Methods: Empirical studies were carried out in September and October 2014 on a group of 17 companies with implemented and certified quality management systems according to ISO 9001. The research tool was a questionnaire survey sent to management representatives (25 respondents) and workers (140 respondents). The surveys were supplemented with direct interviews with employees of the companies. Findings: Based on the survey it can be stated that the quality management systems, accord-ing to ISO 9001, had a fairly large impact on improving procurement processes. This is particularly evident in areas including relationships with suppliers, quality control, workflow and communication, both internal and external. The positive aspects achieved through the implementation of quality management systems due to the fact that the ISO 9001 standard in its commitments puts great emphasis on the organization of the procurement process.


2021 ◽  
Vol 11 (1) ◽  
pp. 1122-1129
Author(s):  
Aleksandra Radziejowska ◽  
Joanna Sagan ◽  
Anna Sobotka

Abstract Protection of buildings against the pernicious radiation types can be achieved by simultaneous structural and shielding parameters. Those shields are mainly made of heavyweight concrete, which causes many serious problems in the areas of technology, supply logistics, financial supply, Occupational Safety & Health Administration, and substitutions of structural and material solutions. This work presents a case study of the construction of the university building with rooms requiring protection against malicious radiations. Apart from that, it presents the problems and solutions that occurred during the construction from the perspective of the works contractor. This study was also expanded to include the analysis of alternatives for construction-materials. The obtained results were used to develop a generalized scheme, which will be helpful in the preparation and implementation of any facilities requiring fixed radiation shields.


Author(s):  
Guo Li ◽  
Tao Gao ◽  
Lun Ran

In the JIT assembly system, if any supplier does not deliver the raw materials or components on time, or in the right quantity, the core manufacturers will not assemble on the schedule, which will bring great loss to the whole supply chain and greatly reduce the competitiveness and collaboration of the entire supply chain. Based on a survey on supply chain collaboration and operation model, supply logistics in JIT environment are analyzed from both the inside and outside system with the research goal of coordinating the upstream supply logistics. In order to help manufacturers implement the JIT production, the VMI-Hub operation mode is proposed from the aspect of inside system, and from outside system, cross-docking dispatch operation mode is considered to coordinate the supply logistics in assembly system.


Author(s):  
Guo Li ◽  
Xiang Zhang ◽  
Zhaohua Wang ◽  
Tao Gao

In JIT assembly system, any supplier’s postponement of delivery or incorrect delivery quantity will result in the manufacturer’s incapability of assembling on schedule, which will not only damage the interests of other suppliers but also jeopardize the interests of enterprises and reduce the competitiveness of the supply chain. In this article, coordination of the upstream supply logistics from internal and external aspects is taken as the research object. In external supply system, three aspects of cost, quality and time are used to evaluate the coordination of supply logistics in JIT environment. From the internal aspect, reliability, flexibility, responsiveness, customer service and system suitability are selected for the performance evaluation. The eight indexes construct an index system and each performance index is described and analyzed. Finally, Analytic Hierarchy Process is used to evaluate the coordinated performance of supply logistics in JIT environment. An example is provided, which illustrate the method used in this paper is feasible and meaningful.


2015 ◽  
Vol 8 (3) ◽  
pp. 1433-1448 ◽  
Author(s):  
Nalladurai Kaliyan ◽  
R. Vance Morey ◽  
Douglas G. Tiffany

2012 ◽  
Vol 253-255 ◽  
pp. 1463-1467 ◽  
Author(s):  
Hui Juan Ma ◽  
Jing Wei

With the rapid development of automobile industry, auto parts logistics emerged as an important part of promoting industrial development. Milk-run is used more and more frequent in auto parts supply. Based on the characteristics of auto parts requirement and milk-run, in order to satisfy the requirement of OEMs, the distribution center takes milk-run supply logistics model to a variety of vendors, using the idea of third party. The design of automobile parts milk-run vehicle routing is the problem of designing the non-full set of goods vehicle routing with time window. This thesis established a vehicle routing model with time window, studied milk-run vehicle routing of automobile parts, used the particle swarm optimization to solve the problem of the example, and obtained a satisfied results in acceptable time. It also verified the validity of the model and algorithm.


Sign in / Sign up

Export Citation Format

Share Document