Challenge in high-speed TBM excavation of long-distance water transfer tunnel, Pahang-Selangor Raw Water Transfer Tunnel, Malaysia
Keyword(s):
1905 ◽
Vol 59
(1537supp)
◽
pp. 24627-24628
2020 ◽
Keyword(s):
Keyword(s):
2016 ◽
Vol 29
(4)
◽
pp. e3846
1955 ◽
Vol 100
(599)
◽
pp. 353-367
Keyword(s):
Keyword(s):
2011 ◽
Vol 341-342
◽
pp. 868-872
Keyword(s):